Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128G263 + (18:58:26, 12 December 2024)
- LD-93-012, Forwards Draft Sys 80+ Certified Design Descriptions & Associated ITAAC + (18:58:27, 12 December 2024)
- ML20128G260 + (18:58:28, 12 December 2024)
- ML20128G258 + (18:58:29, 12 December 2024)
- ML20128G259 + (18:58:29, 12 December 2024)
- 05000482/LER-1985-012, :on 850419,inadvertent Train B Safety Injection Occurred.Caused by Loose Limit Switch Tug in Valve Motor Operator.Switch Lug Repaired + (18:58:31, 12 December 2024)
- ML20128G255 + (18:58:32, 12 December 2024)
- ML20128G254 + (18:58:33, 12 December 2024)
- 05000455/LER-1996-003-12, :on 960904,steam Generator Tubes Were Not Inspected During Outage.Caused by Inability of Operators to Properly Locate Fixtures.Database Corrected to Reflect Actual Tube Numbers + (18:58:35, 12 December 2024)
- ML20128G252 + (18:58:36, 12 December 2024)
- ST-HL-AE-4307, Revises Response to NRC Re Violations Noted in Insp Repts 50-498/89-16 & 50-499/89-16.Corrective Actions: Procurement Personnel Trained Re Intent of Checklist Criteria & Application in Review of Procurement Documents + (18:58:40, 12 December 2024)
- ML20128G249 + (18:58:41, 12 December 2024)
- ML20128G245 + (18:58:42, 12 December 2024)
- ML20128G244 + (18:58:43, 12 December 2024)
- 05000373/LER-1985-045-01, :on 850531,reactor Manually Scrammed.Caused by Failure of Circulating Pump 1B Discharge Valve Gear Operator Mounting Bolts.Stop Logs Placed in Intake Structure for Circulating Water Pump 1B + (18:58:45, 12 December 2024)
- 3F0293-03, Provides Responses to Questions Raised by NRC in 921020 Telcon Re Reactor Bldg Paint.Proposed Change in Painting Program Necessary Since Some QC Requirements for Paint Application Too Stringent for Use in Entire Reactor Bldg + (18:58:46, 12 December 2024)
- ML20128G239 + (18:58:46, 12 December 2024)
- ML20128G238 + (18:58:48, 12 December 2024)
- ML20128G232 + (18:58:49, 12 December 2024)
- ML20128G231 + (18:58:50, 12 December 2024)
- 05000285/LER-1993-001, :on 930108,discovered That Bast Level Surveillance Not Performed Properly.Caused by Inadequate Surveillance Test to Monitor Bast Levels.Mod Initiated to Provide Individual Annunciator Windows + (18:58:52, 12 December 2024)
- ML20128G228 + (18:58:53, 12 December 2024)
- ML20128G229 + (18:58:53, 12 December 2024)
- 05000498/LER-1993-002, :on 930109,TS 3.0.3 Condition Declared When Two Channels of power-range Instrumentation Inoperable.Caused by Inadequate Procedural Guidance in Calibr Procedure.Channel Calorimetrics Procedure Revised + (18:58:55, 12 December 2024)
- ML20128G226 + (18:58:56, 12 December 2024)
- 05000440/LER-1993-002, :on 930109,secondary Containment Bypass Leakage Exceeded Limitations Stated in TS 3.6.1.2.d,resulting in Entry Into TS 3.0.3.Caused by Improper Stroke Adjustment. Minor Adjustment Made to Valve Travel + (18:58:58, 12 December 2024)
- 2CAN099604, Responds to RAI Re LPSI & SIT Allowed Outage Time Extensions to Facilitate Review of Tech Spec Change Request + (18:58:59, 12 December 2024)
- ML20128G222 + (18:58:59, 12 December 2024)
- ML20128G217 + (18:59:00, 12 December 2024)
- 05000454/LER-1996-014-01, :on 960903,failure to Comply with Design Basis Occurred,Due to Degradation of Boraflex in Spent Fuel Racks.Controls Placed on SFP Boron Concentration & Silica Concentration + (18:59:02, 12 December 2024)
- ML20128G214 + (18:59:03, 12 December 2024)
- ML20128G209 + (18:59:04, 12 December 2024)
- ML20128G207 + (18:59:05, 12 December 2024)
- ML20128G208 + (18:59:05, 12 December 2024)
- ML20128G204 + (18:59:06, 12 December 2024)
- ML20128G205 + (18:59:06, 12 December 2024)
- ML20128G202 + (18:59:08, 12 December 2024)
- 05000295/LER-1989-008-02, :on 890609,discovered Possibility That Svc Water Sys May Not Supply Both Room Coolers W/Current Piping Configuration & cross-tie Valves in Closed Position.Caused by Design Deficiency.Valves Opened + (18:59:09, 12 December 2024)
- ML20128G200 + (18:59:10, 12 December 2024)
- ML20128G198 + (18:59:11, 12 December 2024)
- ML20128G197 + (18:59:12, 12 December 2024)
- ML20128G194 + (18:59:13, 12 December 2024)
- ML20128G193 + (18:59:13, 12 December 2024)
- ML20128G188 + (18:59:14, 12 December 2024)
- ML20128G185 + (18:59:15, 12 December 2024)
- ML20128G184 + (18:59:16, 12 December 2024)
- ML20128G182 + (18:59:17, 12 December 2024)
- ML20128G179 + (18:59:17, 12 December 2024)
- 05000254/LER-1985-006-08, :on 850530,reactor Scrammed Twice Due to Group I Isolation from Rack Vibration.Second Event Caused by Low Reactor Water Level.First Event Caused by Spurious Isolation Signal from Pressure Switches + (18:59:19, 12 December 2024)
- ML20128G177 + (18:59:21, 12 December 2024)
- ML20128G175 + (18:59:21, 12 December 2024)
- ML20128G174 + (18:59:22, 12 December 2024)