ML20128G179

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Exam Rept, Conducted During First Insp Period of 920831-1108
ML20128G179
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/05/1993
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128G183 List:
References
NYN-93022, NUDOCS 9302120180
Download: ML20128G179 (2)


Text

I' Seab c k 4H 03874 L

Telephone (603)474 9521 iiinEm Atlantic Focaia <a3> m =7 Energy Servico Corporation Ted C. Felgenbaum Senior Vice President and Chief Nucleat Officer NYN 93022 February 5,1993 United States Nuclear llegulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

Reference:

Facility Operating License No. NpF 86, Docket No. 50 443

Subject:

Inservice inspection Examination Report Gentlemen:

North Atlantic Energy Service Corporation (North Atlantic) has enclosed a copy of the laservice inspection Examination Report for inspections conducted during the first inspection period of the first ten year inspection interval at Seabrook Station. These inspections were conducted from August 31,1>92 to November 8,1992 during the second refueling outage.

The enclosed report is submitted in compliance with ash 1B Section XI, Articic IWA-6230, and includes the required Form NIS 1.

A copy of this letter and the enclosed report are also being submitted to the State of New llampshire.

Should you have any questions regarding this matter, please contact hir, James hl.

Peschel, Regulatory Compliance hinnager, at (603) 474 9521, extension 3772.

Very truly yours, f

,Ted C. Feigerg>aum TCF: A LL/act Enclosure 0800gg 1

j a member of the Northeast Utilities system 4j s\\].

9302120100 930205 j

PDR ADOCK 05000443 i

0, PDR 4

t J

i J

f

- United States Nuclear Regulatory Commission February $,1993 Attention:

Document Control Desk Page two i

i ec:

Mr. Thomas T. Martin -

Regional Administrator U. S. Nuclear Regulatory Commission Region !

475 Allendale Road i

King of Prussia, PA 19406 Mr. Albert W. De Agarlo. Sr. Project Manager Project Directorate I.3 Division of Reactor Projects

- i U.S. Nu'elear Regulatory Commission

.r War.hington, DC 20555 i

Mr. Noel Dudley NRC Senior Resident-Inspector P.O. Box 1149 Seabrook, Nil. 03874 Mr. Richard M. Flynn Labor Commissioner i

i State of New l-lampshire Department of Labor J

P.O.130x 2076

,(

Concord, Nil 03302 2076 t

. f' t

i h-(

t.

v

._ [

t

,, t Y

. n a

.. ~.

. 2..

_