ML20128G214
| ML20128G214 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 01/28/1993 |
| From: | Haughney C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Rich Smith PACIFIC SIERRA NUCLEAR ASSOCIATES |
| References | |
| REF-PROJ-M-39, REF-PROJ-M-49 NUDOCS 9302120194 | |
| Download: ML20128G214 (2) | |
Text
O JAN 2 81993 Nr.R.HowardSmithaDirector Corporate Quality Assurance Pacific Nuclear 1010 South 336th Street-Federal Way, WA 98003
Dear Mr. Smith:
SUBJECT:
REVISION OF PACIFIC NUCLEAR SYSTEMS, INC. QUALITY ASSURANCE MANUAL Your letters of November 23 and December 18, 1992, transmitted Revision 3 of Edition 2 of_the Pacific Nuclear Systems, Inc. (PNSI) Quality Assurance (QA)
Manual. The revision reflects discontinued use of subsidiary names a1d'the use of group names instead; realigning the group QA Manager reporting line from the Director, Corporate QA, to the executive group management; changing
" customer" to " client"; and making additional minor changes to update and=
clarify the manual.
We have compared Revision 3, Edition 2 of the manual with Revision 2, Edition 2, which we reported as acceptable in our letter to you dated March 26, 1992. We find that Revision 3 continues to describe an acceptable QA program for the design and manufacture of systems for long-term interim storage of irradiated nuclear fual assemblies.
That is, when properly implemented, the QA program described in the manual will meet the requirements of Subpart G of 10 CFR Part 72.
Should you have any questions regarding our review, please contact Jack Spraul on (301) 504-2446.
Sin er ly, CharfsJ.Haughney, Chief Source Containment and Devices Bianch Division of Industrial and Medical Nuclear Safety-Office of Nuclear Material Safety and Safeguards DISTRIBUTION QA Topical Report PDR Central File CJHaughney JJHolonich LPDR FCSturz KCleu KRHooks NMSS R/F MGRaddatz JFSchneider JGSpraul (2)
HLPD R/F Docket 72-1004, M-39, M-49
- prior concurrence OFC
_NMSS:HLPD N
NMSS:HLPD*
N NMSSESCDB N
NMSS:SCDB N
NAME h-JGSpraul/dh KPsHooks htgrz JRaughney O
bdkN 12/ 22/93 l
Ol/h/93 01/fI/93
,DATE C = Cover onty, E a Cover & enclosure, N = No copy S:PNSI-Acc Ltr 0FFICIAL RECORD COPY 01/27/93
]
W1 '[It 100028 t
9302120194 930128 4 1' PDR ADOCK 07200004 f'
C PDR 7
.~.
_r
..~
br._R.HowardSmith, Director
-i Corporate: Quality Assurance
- Pacific Nuclear..
1010 South 336th Street-Federal Way, WA-98003
Dear Mr. Smith:
SUBJECT:
REVISION OF PACIFIC NUCLEAR _ SYSTEMS, INC, QUALITY ASSURANCE MANUAL Your letters of November 23 arid December 18, 1992, transmitted Revi; ion 3 off Edition 2 of the Pacific Nuclear Systems, Inc. (PNSI) Quality Assurance :(QA)
Manual.
The revision reflects-discontinued use of subsidiary names and the:
use of group names-instead; realigning the group'QA Manager _ reporting line from the Director, Corporate QA, to the executive group management; changing-
" customer" to " client;" and makingxadditional minor changes to update and clarify the manual.
We have compared Revision 3, Edition2 of the manual with Revision 2, Edition 2, which we reported as acceptable inhour letter to you dated March 26, 1992.
We find that Revision 3 continues to describe an acceptable: QA program for the--
design and manufacture of systems-for long-term interim-storage oft irradiated nuclear fuel assemblies.
That is, when properly implemented,- th.? :QA program described in the manual will meet the requirements-of Subpart G of -10 CFR Part'-
72.
\\
Should you have any questions regarding ou\\.r\\ review,.please contact: Jack Spraul-on (301) 504-2446.
\\
Sincerkly,
(-
Charles J. Haughney, Chief SourceCohtainmentand-DevicesBranch Division of ~ Industrial and Medical Nuclear Spfety Office of-Nnclear Material Safety and Safeguards \\
\\
l DISTRIBUTION' j\\
KRHooks PDR Central File _
-CJHaughney JJHolonich-LPDR FCSturz-KCleu NMSS R/F MGRaddatz-JFSchneider
' JGSpraul --(2) _
- HLPD R/F QA Topical Report
- Joc ket 72-1004, M-39, _ M-49'
' PJ /, -
s 0FC u NMSS:HLPD N
ytsS:HLPD N
NMSS:SCDB N
-NMSS:SCDB
'N-
_NAME-M)GSpraul/dh
[ dRYooks:
FCSturz CJHaughney-(/
!)
DATE 12/22/92 12/2 2./92 12/
'/92 12/
/92
'l C
- Cover only, E = cover & enclosure, N
- No cop)
- 5:PNSI-Acc.Ltr
-0FFICIAL RECORD COPY-12/22/92l f
L 4
. z z i '
wn im i : --
cen ewt.
@HONEf s. 504-a 44 c
~
MAILiSTOP: Ok?N4-H.[
t
_i 6 - _ ^
+
\\
axaggy mas S: PUSI A CQ. L TR I DtXDENT NElpNWrION GW3LIFF DrvIsIm or Ere-IaYEL ISM NhMkBENF eda M11st is to hm =*=it+-* with =+, A=
a-1eseeveh w h distribut.im i
i 1.
Is this decamer* a final draft?
dC 3.
If it is a final draft, abas it have tem acricurnruns of a Brandt Odet er '
higiant gut,f m
3.
-It dds a tidstad iten? If Yes, tiedust raaber
- 4
- a ny m I E frI m : NOTE: DISTRIBUTION MUST MATCH CHECK;0FF LIST!!!!!!!!!!!!:
04mmes cri the standard distritution lista need not be 11stadt they will be inclu$ad autcaurtically.) (Attacts labels for other than standard distrimuticri) -
g+ a gt.a)M bcn "**.f'.
Any gman1 1/"
t pgR Yes1 2
/ M,L hn, UCR Yes X No 44 m L
OtaA Yes No v )L
(
IZ8 Yes
' NA,1(
L AOtt Yes h(
Pnpristny Yes No x h s}
W i=i M Yes 5.
12:'a
/v ve 4.
Q:HtIEWEH35:
7.;
5-Planse list the names of all' individ=1= Wie denid be an ccricurrence:-
'):
%nu t
//ec A r -
fh, +
, _ /4, ll y-7.
Data Criginstad: F /",/0 '
Data Dus er " " - rz/ 2 t/9 t-(
8.
Thak Assigned to:
Data Qugdetad ard sent to 44> S R,:
huuu CHLY PGL IN Gu 9.-
Data DID'ed to DSCO2/IRCUB (M:ME: maM tmly if IZ8 heat is unrked ihm abews)
- 10. ' tim:
hutumed by Duts ARawed by Data f
~i n.