Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129E051 + (16:41:08, 12 December 2024)
- ML20129E049 + (16:41:09, 12 December 2024)
- ML20129E047 + (16:41:10, 12 December 2024)
- ML20129E043 + (16:41:11, 12 December 2024)
- ML20129E044 + (16:41:11, 12 December 2024)
- ML20129E036 + (16:41:12, 12 December 2024)
- ML20129E035 + (16:41:15, 12 December 2024)
- ML20129E034 + (16:41:16, 12 December 2024)
- ML20129E033 + (16:41:17, 12 December 2024)
- ML20129E031 + (16:41:18, 12 December 2024)
- ML20129E030 + (16:41:19, 12 December 2024)
- ML20129E028 + (16:41:20, 12 December 2024)
- ML20129E027 + (16:41:21, 12 December 2024)
- ML20129E025 + (16:41:22, 12 December 2024)
- ML20129E023 + (16:41:23, 12 December 2024)
- ML20129E022 + (16:41:24, 12 December 2024)
- ML20129E021 + (16:41:25, 12 December 2024)
- ML20129E020 + (16:41:26, 12 December 2024)
- 05000266/LER-1996-008, :on 960806,inner Doors of Unit 1 Containment Upper Hatch Failed an Airlock Door Seal Test.Caused by Failure to Comply with Procedures TS-10A & TS-10A,App B. Containment Upper Hatch Repair Completed + (16:41:28, 12 December 2024)
- IR 05000266/1996009 + (16:41:29, 12 December 2024)
- ML20129E018 + (16:41:29, 12 December 2024)
- ML20129E014 + (16:41:30, 12 December 2024)
- ML20129E016 + (16:41:30, 12 December 2024)
- ML20129E011 + (16:41:31, 12 December 2024)
- 2CAN078501, Responds to Open Items Identified in Eg&G Rept Re Reg Guide 1.97,per NUREG-0737,Suppl 1.RCS Pressure Containment Atmosphere & Sump Water Temp Discussed.Progress on Upgrading Will Be Submitted Biannually + (16:41:32, 12 December 2024)
- ML20129E008 + (16:41:33, 12 December 2024)
- ML20129E003 + (16:41:34, 12 December 2024)
- RBG-21444, Forwards Revs to FSAR Section 2.2.3.1,resulting from Confirmation of Parameters Used in Original Analysis.Revs to SER or Proposed Tech Specs Unnecessary.Revs Will Be Included in Future FSAR Amend + (16:41:34, 12 December 2024)
- ML20129E002 + (16:41:35, 12 December 2024)
- ML20129E001 + (16:41:36, 12 December 2024)
- ML20129D999 + (16:41:37, 12 December 2024)
- ML20129D998 + (16:41:38, 12 December 2024)
- ML20129D997 + (16:41:38, 12 December 2024)
- 05000341/LER-1985-013, :on 850428,secondary Containment Integrity Not Established During Core Alterations for CRD Friction Test. Caused by Personnel Misunderstanding Applicability of Requirement.Procedure Change Initiated + (16:41:41, 12 December 2024)
- ML20129D994 + (16:41:42, 12 December 2024)
- ML20129D993 + (16:41:44, 12 December 2024)
- ML20129D991 + (16:41:45, 12 December 2024)
- ML20129D989 + (16:41:46, 12 December 2024)
- ML20129D985 + (16:41:47, 12 December 2024)
- ML20129D986 + (16:41:47, 12 December 2024)
- ML20129D983 + (16:41:48, 12 December 2024)
- 05000295/LER-1996-023, :on 960826,PORV Block Valve Failure Occurred Resulting in Shutdown.Caused by Personnel error.1MOV-RC8000B Valve Actuator Replaced & Successfully Tested + (16:41:51, 12 December 2024)
- ML20129D980 + (16:41:52, 12 December 2024)
- A04906, Forwards Response to SALP Repts for 18-month Period Ending 850228,per 850604 Meeting W/Nrc.Util Initiatives to Reemphasize Importance of Quality in Design Change Activities Listed + (16:41:53, 12 December 2024)
- ML20129D978 + (16:41:55, 12 December 2024)
- ML20129D976 + (16:41:56, 12 December 2024)
- ML20129D975 + (16:41:56, 12 December 2024)
- ML20129D973 + (16:41:57, 12 December 2024)
- ML20129D970 + (16:41:58, 12 December 2024)
- 05000338/LER-1985-005-02, :on 850503,surveillance Not Performed on Seismic Triaxial response-spectrum Recorder.Caused by Inaccessibility During Power Operations.Test Will Be Performed During Next Refueling Outage + (16:42:00, 12 December 2024)
- W3P85-1414, Forwards Description of Changes to Physical Security Plan. Description Withheld + (16:42:01, 12 December 2024)