ML20129D978

From kanterella
Jump to navigation Jump to search
Corrected Page 285e to Amend 234 to License DPR-59, Permitting Implementation of 10CFR50,app J,Option B, W/Exception to Guidelines of Regulatory Guide 1.163 for Type C Testing of Primary Containment Isolation Valves
ML20129D978
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/22/1996
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20129D982 List:
References
RTR-REGGD-01.163, RTR-REGGD-1.163 NUDOCS 9610250227
Download: ML20129D978 (1)


Text

-

JAFNPP i

4 6.19 POSTACCIDENT SAMPLING PROGRAM A program shall be established, implemented, and maintained which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere samples under accident conditions. The program shallinclude the following:

A) Training of personnel, B) Procedures for sampling and analysis, C) Provisions for maintenance of sampling and analysis 6.20 PRIMARY CONTAINMENT LEAKAGE RATE TESTING PROGRAM A program shall be established to implement the leakage rate testing of the Primary Containment as required by 10 CFR 50.54 (o) and 10 CFR 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Reaulatory Guide 1.163,

  • Performance-Based Containment Leak-Test Program", datecfSeptember 1995, as modified by the exception that Type C i

testing of valves not isolable from the containment free air space may be accomplished by pressurization in the reverse direction provided that testing in this manner provides equivalent or more conservative results than testing in the accident direction. If potential atmospheric leakage paths (e.g., valve stem packing) are not subjected to test pressure, the portions of the valve not exposed to test pressure shall be subjected to leakage rate measurement during regularly scheduled Type A testing. A list of these valves, the leakage rate measurement method, and the acceptance criteria, shall be contained in the Program.

A.

The peak Primary Containment internal pressure for the design basis loss of l

coolant accident (P.), is 45 psig.

B.

The maximum allowable Primary Containment leakage rate (L,), at P., shall be 0.5% of primary containment air weight per day.

C.

The leakage rate acceptance criteria are:

1.

Primary containment leakage rate acceptance criteria is s 1.0 L.

During unit startup following testing in accordance with this prog, ram, the leakage rate acceptance enteria are s 0.60 L, for the Type B and Type C tests and s 0.75 L, for the Type A tests; 2.

Airlock testing acceptance criteria are:

a.

Overall airlock leakage rate is s 0.05 L, when tested at 2 P,,

b.

For each door seal, leakage rate is s 120 scfd when tested at 2 P,.

3.

MSIV leakage rate acceptance criteria is s 11.5 scfh for each MSIV when tested at 2 25 psig.

4 D.

The provisions of Specification 4.0.8 do not apply to the test frequencies specified in the Primary Containment Leakage Rate Testing Program.

E.

The provisions of Specification 4.0.C are applicable to the Primary Containment Leakage Rate Testing Program i

Amendment No. +00, 258e 9610250227 961022 PDR ADOCK 05000333 P

PDR