Text
-
[/,jomg 4
jo
- UNITED STATES g
g NUCLEAR REGULATORY COMMISSION j
Q
': j WASHINGTON. D. C. 20555 S-
,/
ALABAMA POWER COMPANY DOCKET N0. 50-348 JOSEPH M. FARLEY NL' CLEAR PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 59 License No. NPF-2 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.-
The application for amendment by Alabama Power Company (the licensee) dated May 3,1983, supplemented July 29 and September 23, 1983, and January 27 and September 6, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this license amendment will not be inimical to the comon defense and se:urity or tc tte healt, and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:
8506060325 850524 ADOCK050%340
[
PDR l
P T
D-
+ _
r*-
T r---h--_-t v
e
~
--p m
v
- -m
'I (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.59, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f
i; L
L even gs, Ch ef Operating Reactors ra'ch #1 Division of Licensi
Attachment:
Changes to the Technical Specifications Date of Issuance: May 24, 1985
ATTACHMENT T0 LICENSE AMENDMENT NO.sg
. AMENDMENT NO.go FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revised Appendix A as follows:
Remove Pages Insert Pages 3/4 8-8 3/4 8-8 3/4 8-9 3/4 8-9 and 3/4 8-9a 3/4 8-10 3/4 8-10 3/4 8-11 3/4 8-11 3/4 8-12 3/4 8-12 3/4 8-13 3/4 8-13 3/4 8-14 3/4 8-14 8 3/4 8-1 8 3/4 8-1
e ELECTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. distribution systems shall be OPERABLE and energized:
Train "A" consisting of 125-volt D.C. bus No. lA,125-volt battery bank No. lA and a full capacity charger.
Train "B" consisting of 125-volt D.C. bus No.1B,125-volt battery bank No.1B ard a full capacity charger.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With one of the 125-volt D.C. trains inoperable or not energized, restore the inoperable train to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.3.1 Each D.C. train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated voltage on the bus.
4.8.2.3.2 Each 125-volt D.C. battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8-2 meet the Category A limits, and 2.
The total battery terminal voltage is greater than or equal to 127.8 volts on float charge, b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage below 110 volts, or battery overcharge with battery terminal voltage above 150 volts, by verifying that:
1.
The parameters in Table 4.8-2 meet the Category B limits, FARLEY-UNIT 1 3/4 8-8 AMENDMENT NO. 59
ELECTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) 2.
There is no excessive visible corrosion at either terminals or connectors, or the connection resistance of these items is less than or equal to 150 microhms from post to post *, and 3.
The average electrolyte temperatures of ten of the connected cells deviate less than or equal to 5'F from each other**.
c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material, 3.
The resistance of each cell-to-cell and terminal connection is less than or equal to 150 microhms from post to post *, and 4.
The battery charger will supply at least 536 amperes at greater than or equal to 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- For any connection resistance determined to be greater than 150 microhms from post to post, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the connection resistance is restored to less than or equal to 150 microhms from post to post.
- If a deviation greater than 5'F is determined, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the temperature deviation is corrected.
\\
FARLEY-UNIT 1 3/4 8-9 AMENDMENT NO. 59 I
L=
e ELECTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) 5.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the battery is subjected to a battery service test or the individual cell voltage does not decrease below 1.75 volts when the battery is subjected to the following equivalent load profile.
Order In Which Loads Are Current Duration Applied (amps)
(min.)
1 920 1
2 430 58 3
920 1
4 430 59 5
920 1
d.
At least once per 60 months by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Once per 60 month interval, this performance discharge test may be performed in lieu of the battery service test per 4.8.2.3.2.c.5.
- e. - At least once per 18 months, performance discharge test of battery capacity shall be given to any battery that shows signs of degradation or has reached 17 years or 85% of the service life expected for the application, whichever comes first. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
FARLEY-UNIT 1 3/4 8-9(a)
AMENDMENT NO.59
.1
ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued)
TABLE 4.8-2 BATTERY SURVEILLANCE REQUIREMENTS CATEGORY A (1)
CATEGORY B Parameter Limits for each Limits for each Allowable (3) designated pilot connected cell (2) value for each cell connected cell El ectrolyte
> Minimum level
> Minimum level Above top of Level indication mark, indication mark, plates, and not and < 1/4" above and < 1/4" above overflowing maxiliium level maximum level indication mark indication mark Float Voltage
> 2.08 volts
> 2.08 volts
> 2.02 volts (4)
Specific
> 1.195 (b)
Gravity (a)
-> 1.190 If a cell is less than 1.190, then it shall not have de-creased more than.080 from the previous 92 day test.
Average of all Average of all connected cells connected cells
> 1.195
> 1.190 (a)
Corrected for electrolyte temperature of 77'F.
(b)
Or battery charging current is less than 2 amps when on float charge.
(1)
For any Category A parameter (s) outside the limit (s) shown, the battery may be considered OPERABLE provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> all Category B measurements are taken and found to be within their allowable values, and provided all parameter (s) are restored to within Category B limits within the next 6 days.
(2) For any Category B parameter (s) outside the limit (s) shown, the battery may be considered OPERABLE provided that they are within their allowable values and provided they are restored to within limits within 7 days.
(3) Any Category B parameter not within its allowable value indicates an inoperable battery.
(4) The average cell float voltage shall be greater than 2.13 volts in order for the battery to be considered OPERABLE.
FARLEY - UNIT 1 3/4 8-10 AMENDMENT NO. 59
ELECTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.4 As a minimum, one 125-volt D.C. bus, battery bank and its associated full capacity charger shall be OPERABLE.
APPLICABILITY: MODES 5 and 6 ACTION:
With the required D.C. bus, battery bank and/or full capacity charger inoperable, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes or movement of irradiated fuel; initiate corrective action to restore the required battery bank, full capacity charger and bus to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.8.2.4.1 The above required 125-volt D.C. bus shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated voltage on the bus.
4.8.2.4.2 The above required 125-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.
FARLEY-UNIT 1 3/4 8-11 AMENDMENT NO.
59
1 ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.5 The following D.C. distribution systems shall be OPERABLE and energized:
Train "A" consisting of 125-volt D.C. Distribution Cabinet IM, 125-volt battery bank No. I and a full capacity charger.
Train "B" consisting of 125-volt D.C. Distribution Cabinet IN, 125-volt battery bank No. 2 and a full capacity charger.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION: With one of the 125-volt distribution trains inoperable *,
restore the inoperable distribution system to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.5.1 Each D.C. train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.
4.8.2.5.2 Each 125-volt D.C. battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8-2 meet the Category A limits, and 2.
The total battery terminal voltage is greater than or equal to 127.8 volts on float charge.
b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal vo'tage below 110 volts, or battery overcharge with battery terminal voltage above 150 volts, by verifying that:
1.
The parameters in Table 4.8-2 meet the Category B limits,
- Except during performance of Surveillance Requirements 4.8.2.5.2.d, 4.8.2.5.2.e, and 4.8.2.5.2.c.5.
During this test, one train may be inoperable until the battery is recharged following completion of the battery discharge test.
FARLEY-UNIT 1 3/4 8-12 AMENDMENT NO. 59
ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) 2.
There is no visible excessive corrosion at either terminals or connectors, or the connection resistance of these items is less than or equal to 1500 microhms from post to post *,
and 3.
The average electrolyte temperatures of ten of the connected cells deviate less than or equal to 5'F from each other**.
c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material, 3.
The resistance of each cell-to-cell and terminal connection is less than or equal to 1500 microhms from post to post *,
and 4.
The battery charger will supply at least 3 amperes at greater than or equal to 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
5.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the battery is subjected to a battery service test or the individual cell voltage does not decrease below 1.75 volts when the battery is subjected to the following equivalent load profile:
Order In Which Loads Are Current Duration Applied (amps)
(min.)
1 25 0 - 1.0 2
1 1.0 - 120
- For any connection resistance determined to be greater than 1500 microhms from post to post, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the connection resistance is restored to less than or equal to 1500 microhms from post to post.
- If a deviation greater than 5'F is determined, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the temperature deviation is corrected.
FARLEY-UNIT 1 3/4 8-13 AMENDMENT NO. 59
ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) d.
At least once per 60 months by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Once per 60 month interval, this performance discharge test may be performed in lieu of the battery service test per 4.8.2.5.2.c.5.
e.
At least once per 18 months, performance discharge test of battery capacity shall be given to any battery that shows signs of degradation or has reached 17 years or 85% of the service life expected for the application, whichever comes first. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
FARLEY-UNIT 1 3/4 8-14 AMENDMENT N0.59
}
3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2 A.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility.
The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10CFR50.
The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources is consistent with the initial condition assumptions of the safety analyses and is based upon maintaining at least one redundant set of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C.
source.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.
The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9 " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971. The criteria of NUREG/CR-0660,
" Enhancement of On-Site Diesel Generator Reliability," February 1979, the manufacturer's recommendations, and operating experience have been utilized to develop a diesel reliability program which provides an extremely high confidence in diesel operability. The surveillance test frequency is based on Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977, with adjustments made to preclude over-testing which has been verified by the manufacturer to be detrimental to diesel generator reliability.
The Surveillance Requirements for demonstrating the OPERABILITY of the Station batteries are based on the recommendations of IEEE Standard 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."
i FARLEY-UNIT 1 B 3/4 8-1 AMENDMENT NO. 59 1
.g UNITED STATES
+
[
g NUCLEAR REGULATORY COMMISSION
'l WASHINGTON, D. C. 20555
%,..... gh ALABAMA POWER COMPANY DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.50 License No. NPF-8 1.
The Nuclear Regulatory Commission (the Commission) has found that:
9 A.
The application for amendment by Alabama Power Company (the licensee) dated May 3,1983, supplemented July 29 and September 23, 1983, and January 27 and September 6,1984, complies with the standards and req)uirements of the Atomic Energy Act of 1954, as amended (the Act and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance: (i)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendrent will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to read as follows:
- - (2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.50, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION h\\
.even g
Operating Reactor B"anch #1 Division of Licen
}
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 24, 1985 L
t
c l
.c ATTACHMENT TO LICENSE AMENDMENT NO. so AMEN 0 MENT NO. 50 FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 f
V Revised Appendix A as'follows:
Remove Pages Insert Pages l-3/4 8-11 3/4 8-11 3/4 8-12 3/4 8-12 and 3/4 8-12a 3/4 0'-13 3/4 8-13 3/4 8-14 3/4 8-14
~
3/4 8-15 3/4 8-15
~
3/4 8-16 3/4 8-16 3/4 8-17 3/4 8-17
~
B 3'/4 8-1 8 3/4 8-1 I
M" l
e l.
o SI
/
b s
t 9
1
\\
1
Elr.CTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.3 The following D.C. distribution systems shall bc OPERABLE and energized:
Train "A" consisting of 125-volt D.C. bus No. 2A,125-volt battery bank No. 2A and a full capacity charger.
Train "B" consisting of 125-volt D.C. bus No. 28,125-volt battery bank No. 2B and a full capacity charger.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With one of the 125-volt D.C. trains inoperable or not l
energized, restore the inoperable train to OPERABLE and energized status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.2.3.1 Each D.C. train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated voltage on the bus.
4.8.2.3.2 Each 125-volt D.C. battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8-2 meet the Category A limits, and 2.
The total battery terminal voltage is greater than or equal to 127.8 volts on float charge.
b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage below 110 volts, or battery overcharge with battery terminal voltage above 150 volts, by verifying that:
1.
The parameters in Table 4.8-2 meet the Category B limits.
FARLEY-UNIT 2 3/4 8-11 AMENDMENT NO. 50
ELECTRfCAL P0BER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) 2.
There is no excessive visible corrosion at either terminals or connectors, or the connection resistance of these items is less than or equal to 150 microhms from post to post *, and 3.
The average electrolyte temperatures of ten of the connected cells deviate less than or equal to 5'F from each other**.
c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion mats. rial, 3.
The resistance of each cell-to-cell and terminal connection is less than or equal to 150 microhms from post to post *, and 4.
The battery charger will supply at least 536 amperes at greater than or equal to 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- For any connection resistance determined to be greater than 150 microhms from post to post, the battery may be considered operable
'provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the connection resistance is restored to less than or equal to 150 microhms from post to post.
- If a deviation greater than 5'F is determined, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the temperature deviation is corrected.
I l
i FARLEY-UNIT 2 3/4 6-12 AMENDMENT N0. 50
J
~
ELECTRICAL POWER SYSTEMS b
4 AUXILIARY BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) d
-k 5.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 2
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the battery is subjected to a battery service test or the individual cell voltage does not decrease below 1.75 volts when the battery is subjected
-Ell to the following equivalent load profile, j
Order In Which 5
Loads Are Current Duration h
Applied (amps)
(min.)
g 1
1 920 1
3 2
430 58 3
920 1
4 430 59 5
920 1
.s d.
At least once per 60 months by verifying that the battery capacity is at least 80% of the manufacturer's rating when h
subjected to a performance discharge test. Once per 60 month
= F interval, this performance discharge test may be performed in b
lieu of the battery service test per 4.8.2.3.2.c.5.
e.
At least once per 18 months, performance discharge test of battery capacity shall be given to any battery that shows signs of degradation or has reached 17 years or 85% of the service life expected for the application, whichever comes first.
Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on g
previous performance tests, or is below 90% of the
-E manufacturer's rating.
g 4
M
=a
'5 B
FARLEY-UNIT 2 3/4 8-12(a)
AMENDMENT NO. 50 k
ia4 m
.=-
ELECTRICAL POWER SYSTEMS D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued)
TABLE 4.8-2 BATTERY SURVEILLANCE REQUIREMENTS CATEGOR( A (
CATEGORY B Parameter Limits for each Limits for each Allowable (3) designated pilot connected cell (2) value for each cell connected cell El ectrolyte
> Minimum level
> Minimum level Above top of Level indication mark, indication mark, plates, and not and < 1/4" above and < 1/4" above overflowing maximum level maximum level indication mark indication mark Float Voltage
> 2.08 volts
> 2.08 volts
> 2.02 volts (4)
Specific Gravity (a)
-> 1.195 (b)
-> 1.190 If a cell is less than 1.190, then it shall r
I not have de-creased more than.080 from the previous 92 day test.
I
[
Average of all Average of all connected cells connected cells
> 1.195
> 1.190 (a) Corrected for electrolyte temperature of 77*F.
(b) Or battery charging current is less than 2 amps when on float charge.
(1) For any Category A parameter (s) outside the limit (s) shown, the battery may be considered OPERABLE provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I
all Category B measurements are taken and found to be within their
)
allowable values, and provided all parameter (s) are restored to f
within Category B limits within the next 6 days.
l (2) For any Category B parameter (s) outside the limit (s) shown, the l
battery may be considered OPERABLE provided that they are within
(
their allowable values and provided they are restored to within limits within 7 days.
(3) Any Category B parameter not within its allowable value indicates an inoperable battery.
(4) The average cell float voltage shall be greater than 2.13 volts in order for the battery to be considered OPERABLE.
FARLEY - UNIT 2 3/4 8-13 AMENDMENT NO.50
ELECTRICAL POWER SYSTEMS AUXILIARY BUILDING D.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.4 As a minimum, one 125-volt D.C. bus, battery bank and its associated full capacity charger shall be OPERABLE.
APPLICABILITY: MODES 5 and 6 ACTION:
With the required D.C. bus, battery bank and/or full capacity charger inoperable, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes or movement of irradiated fuel; initiate corrective action to restore the required battery bank, full capacity charger and bus to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.8.2.4.1 The above required 125-volt D.C. bus shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated voltage on the bus.
4.8.2.4.2 The above required 125-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.
FARLEY-UNIT 2 3/4 8-14 AMENDMENT NO. 50
ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.5 The following D.C. distribution systems shall be OPERABLE and energized:
Train 'A" consisting of 125-volt D.C. Distribution Cabinet 2M, 125-volt battery bank No. I and a full capacity charger.
Train "B" consisting of 125-volt D.C. Distribution Cabinet 2N, 125-volt battery bank No. 2 and a full capacity charger.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION: With one of the 125-volt distribution trains inoperable *,
restore the inoperable distribution system to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
-SURVEILLANCE REQUIREMENTS 4.8.2.5.1 Each D.C. train shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.
4.8.2.5.2 Each 125-volt D.C. battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The parameters in Table 4.8-2 meet the Category A limits, and 2.
The total battery terminal voltage is greater than or equal to 127.8 volts on float charge.
b.
At least once per 92 days and within 7 days after a battery discharge with battery terminal voltage below 110 volts, or battery overcharge with battery terminal voltage above 150 volts, by verifying that:
1.
The parameters in Table 4.8-2 meet the Category B limits,
- Except during performance of Surveillance Requirements 4.8.2.5.2.d, 4.8.2.5.2.e and 4.8.2.5.2.c.5.
During this test, one train may be inoperable until the battery is recharged following completion of the battery discharge test.
FARLEY-UNIT 2 3/4 8-15 AMENDMENT NO. 50
ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) 2.
There is no visible excessive corrosion at either terminals or connectors, or the connection resistance of these items is less than or equal to 1500 microhms from post to post *,
and 3.
The average electrolyte temperatures of ten of the connected cells deviate less than or equal to 5*F from each other**.
c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, and coated with anti-corrosion material, 3.
The resistance of each cell-to-cell and terminal connection is less than or equal to 1500 microhms from post to post *,
and 4.
The battery charger will supply at least 3 amperes at greater than or equal to 125 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
5.
The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the battery is subjected to a battery service test or the individual cell voltage does not decrease below 1.75 volts when the battery is subjected to the following equivalent load profile:
Order In Which Loads Are Current Duration Applied (amps)
(min.)
1 25 0 - 1.0 2
1 1.0 - 120
- For any connection resistance determined to be greater than 1500 microhms from post to post, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the connection resistance is restored to less than or equal to 1500 microhms from post to post.
- If a deviation greater than 5'F is determined, the battery may be considered operable provided that within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the temperature deviation is corrected.
FARLEY-UNIT 2 3/4 8-16 AMENDMENT N0. 50
ELECTRICAL POWER SYSTEMS SERVICE WATER BUILDING D.C. DISTRIBUTION - OPERATING SURVEILLANCE REQUIREMENTS (Continued) d.
At least once per 60 months by verifying that the battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test. Once per 60 month interval, this performance discharge test may be performed in lieu of the battery service test per 4.8.2.5.2.c.5.
e.
At least once per 18 months, performance discharge test of battery capacity shall be given to any battery that shows signs of degradation or has reached 17 years or 85% of the service life expected for the application, whichever comes first. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating.
FARLEY-UNIT 2
'3/4 8-17 AMENDMENT N0.50
u 3/4.8 ELECTRICAL POWER SYSTEMS LBASES 3/4.8.1 and 3/4.8.2 A.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS
- The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for 1) the-safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10CFR50.
The ACTION' requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources is consistent with the initial condition assumptions of the safety-analyses and is based upon maintaining at least one redundant
" set of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C.
' source.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or: refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.
~
The Surveillance Requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9 " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10,1971 and 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear
. Power Plants," Revision 1, August 1977.
The Surveillance Requirements for demonstrating the OPERABILITY of the Station batteries are based on the recommendations of IEEE Standard 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Substations."
3'/4.8.3 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES Containment electrical penetrations and penetration conductors are
~ protected by either deenergizing circuits not required during reactor operation or by demonstrating the OPERABILITY of overcurrent protection circuit breakers during periodic surveillance.
FARLEY-UNIT 2 B 3/4 8-1 AMENDMENT NO. 50