Discusses Review of Util 850612 Proposed Process Control Program Re Solidification/Dewatering Using NUS Temporary Sys or Solidification Using Permanent Asphalt Extruder/ Evaporator.Test Results Requested within 60 Days of Test
ML20129E031
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/03/1985
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Jens W
DETROIT EDISON CO.
References
NUDOCS 8507160717
Download: ML20129E031 (2)


Text

..

c

'M 03 E Docket No.: 50-341 Dr. Wayne Jens Vice President - Nuclear Operations The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226

Dear Mr. Jens:

Subject:

Fenni-2 Solid Radwaste PCP In your letter dated June 12, 1985, you submitted the proposed Fermi-2 Process Centrol Program;(PCP) for our review since the Fermi-2 Technical Specifications require you to solidify or dewater radioictive wastes in accordance with the process control program (s) which we have '

covers solidification and/or dewatering u, approved. The proposed Fenni-2 PCP sing either the temporary processing and solidification system supplied by NUS or solidification using the permanent asphalt extruder / evaporator. You state in your letter that testing of the perma-nent solidification system will begin soon after initial criticality and that this testing is intended to confirm that the appropriate parameters have been selected for solidification of radwaste.

You also state that the solidification test results will be submitted for our review upon completion.

Based on our review of the proposed Fermi-2 PCP, we find that it generally com-plies with our current criteria and guidelines and is, therefore, acceptable.

We request that you submit the test results within 60 days after completion of the testing of the permanent solid radwaste system.

If you have any questions on this matter, please contact the Fermi-2 Project Manager, M. D. Lynch, at (301)492-7050.

Sincerel,

B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing cc: See next page

, DISTRIBUTION:s W ocket File j ACRS (16)

NRC PDR JPartlow Local PDR BGrimes PRC System EJordan NSIC LB#1 R/F MRushbrook DLynch OEL L #1/

LB y, Q MDLynch/mac BJ opp blood 07Q/85 07/oy/85 8507160717 850703

^

PDR ADOCK 05000341 P

PDR

FERMI Dr. Wayne Jens Vice President - Nuclear Operations i

The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 cc:

Mr. Harry H. Voigt, Esq.

Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W.

Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 Peter A. Marquardt, Esq.

Lansing, Michigan 48909 Co-Counsel The Detroit Edison Company Regional Administrator 2000 Second Avenue U. S. NRC, Region III Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William J. Fahrner Project Manager - Fermi 2 Mr. Dennis R. Hahn, Chief The Detroit Edison Company Nuclear Facilities and Environ-2000 Second Avenue mental Monitoring Section Office Detroit, Michigan 48226 Division of Radiological Health P. O. Box 30035 Mr. O. Keener Earle Lansing, Michigan 48909 Supervisor-Licensing The Detroit Edison Company Enrico Fermi Unit 2 6400 No. Dixie Highway Newport, Michigan 48166 Mr. Paul Byron U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Mr. Harry Tauber Group Vice President The Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226

-.