Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129G526 + (16:13:06, 12 December 2024)
- ML20129G524 + (16:13:07, 12 December 2024)
- ML20129G523 + (16:13:08, 12 December 2024)
- ML20129G522 + (16:13:09, 12 December 2024)
- 05000373/LER-1996-010-06, :on 960829,determined Conditions Outside of Design Basis.Caused by Inadequate Standards for TS Clarifications.Implemented Development of TS Clarifications & Evaluates TS Interpretations + (16:13:14, 12 December 2024)
- ML20129G518 + (16:13:15, 12 December 2024)
- ML20129G516 + (16:13:16, 12 December 2024)
- ML20129G515 + (16:13:17, 12 December 2024)
- ML20129G513 + (16:13:18, 12 December 2024)
- ML20129G511 + (16:13:19, 12 December 2024)
- ML20129G506 + (16:13:20, 12 December 2024)
- ML20129G507 + (16:13:20, 12 December 2024)
- ML20129G504 + (16:13:21, 12 December 2024)
- ML20129G503 + (16:13:22, 12 December 2024)
- ML20129G498 + (16:13:23, 12 December 2024)
- ML20129G495 + (16:13:24, 12 December 2024)
- ML20129G496 + (16:13:24, 12 December 2024)
- 05000397/LER-1985-031, :on 850508,during Surveillance of Main Steam Line Hi Radiation,Reactor Protection Sys a & B Placed Simultaneously in Trip Condition.Caused by Spurious Noise Spikes.Surveillance Procedures Modified + (16:13:27, 12 December 2024)
- ML20129G492 + (16:13:29, 12 December 2024)
- ML20129G490 + (16:13:31, 12 December 2024)
- ML20129G488 + (16:13:32, 12 December 2024)
- ML20129G487 + (16:13:33, 12 December 2024)
- ML20129G485 + (16:13:34, 12 December 2024)
- ML20129G484 + (16:13:35, 12 December 2024)
- ML20129G482 + (16:13:36, 12 December 2024)
- B11537, Responds to 850402 Request for Addl Info Re Integrated Safety Assessment Program (Isap) Review.Description of All Plant Betterment Projects & Engineering Studies to Be Included in Isap Review Encl + (16:13:38, 12 December 2024)
- ML20129G479 + (16:13:39, 12 December 2024)
- ML20129G478 + (16:13:41, 12 December 2024)
- ML20129G475 + (16:13:41, 12 December 2024)
- ML20129G474 + (16:13:45, 12 December 2024)
- PM-85-077, Monthly Operating Rept for Apr 1985 + (16:13:46, 12 December 2024)
- ML20129G472 + (16:13:47, 12 December 2024)
- A04839, Responds to 850419 Request for Addl Info Re post-trip Review Program,Per Generic Ltr 83-28.Revised Procedure Sp 2671, Duty Officer Requirements After Trip or ESF Actuation & Procedure EOP 2525, Std Post-Trip Actions Encl + (16:13:48, 12 December 2024)
- HL-5241, Forwards Response to Violations Noted in Insp Repts 50-321/96-10 & 50-366/96-10.Corrective Actions:Valve Positions Not Being Checked Every 31 Days as Required by Unit 1 & 2 Tech Specs Checked & Found in Correct Position + (16:13:49, 12 December 2024)
- ML20129G462 + (16:13:50, 12 December 2024)
- ML20129G460 + (16:13:51, 12 December 2024)
- ML20129G459 + (16:13:52, 12 December 2024)
- ML20129G457 + (16:13:53, 12 December 2024)
- ML20129G455 + (16:13:55, 12 December 2024)
- ML20129G454 + (16:13:56, 12 December 2024)
- ML20129G450 + (16:13:57, 12 December 2024)
- ML20129G449 + (16:13:58, 12 December 2024)
- ML20129G448 + (16:13:59, 12 December 2024)
- ML20129G447 + (16:14:00, 12 December 2024)
- ML20129G446 + (16:14:01, 12 December 2024)
- JAFP-85-0569, Monthly Operating Rept for June 1985 + (16:14:02, 12 December 2024)
- ML20129G441 + (16:14:04, 12 December 2024)
- ML20129G440 + (16:14:05, 12 December 2024)
- ML20129G439 + (16:14:06, 12 December 2024)
- ML20129G435 + (16:14:07, 12 December 2024)
- ML20129G434 + (16:14:08, 12 December 2024)