4 YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT'85-04 FOR THE MONTH OF APRIL 1985 3
4 9
l 1
1 i
8507180073 850430 PDR ADOCK 05000029 R
T OPERATING DATA REPORT DOCKET NO.
50-29 DATE 850506 COMPLETED 8Y S. WHIPPLE TELEPHONE (617) 872-0100 l
OPERATING STATUS l.
Unit Name: Yankee Rome 2.
Reporting Period: April,1985 3.
Licensed Thereal Power (MNt):
600 4.
Naseplate Rating (Gross MWe):
185 5.
Design Electrical Rating (Net NWe):
175 6.
Marisue Dependable Capacity (6ross MWe): 180 7.
Maxieue Dependable Capacity (Net MWe):
167 8.
If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Nhich Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cueulative
- 11. Hours in Reporting Period 719.00 2,879.00
- 12. Nueber of Hours Reactor Nas Critical 719.00 2,879.00 170,802.10
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator O'i-Line 719.00 2,879.00 166,063.42
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 l
- 16. Gross Thereal Energy Generated (MWH) 416,042.00 1,697,303.00 90,187,955.52
- 17. Gross Electrical Energy Generated (HH) 126,172.40 517,723.70 27,336,527.00
- 18. Net Electrical Energy Generated (MWH) 118,218.38 485,650.67 25,580,201.12
- 19. Unit Service Factor 100.00 100.00 77.43
- 20. Unit Availability Factor 100.00 100.00 77.43
- 21. Unit Capacity Factor (Using MDC Net) 98.46 101.01 73.41
- 22. Unit Capacity Factor (Using DER Net) 93.95 96.39 69.96
- 23. Unit Forced Dutage Rate 0.00 0.00 5.38
- 24. Shutdoens Scheduled Over Nest & Months (Type, Date, and Duration of Each):
Ct.re IVill Refueling - October 19, 1985 - 6 weeks
- 25. If Shuteoun At End of Report Period, Esticated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ComERCIAL OPERAT!DN
r-J AVERAGE DAILY WIT PONER LEVEL D00(ET NO.
50-29 WIT YANKEE RONE IATE B50506 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-0100 HONTH APRIL,1985 DAY-AVERAGE DAILY PONER LEVEL DAY AVERAGE BAILY PONER LEVEL (We-Met)
(We-Net) 1 171.2 17 170.9 2
171.2 18 178.8 3
171.5 19 171.0 4
171.4 20 170.9 5
171.5 21 170.5 6
171.5 22 170.0 7
171.5 23 169.7 8
171.4 24 169.2 9
171.0 25 169.2 10 170.9 26 169.5 11 170.9 27 126.1 12 171.0 28 58.3 13 171.1 29 136.7 14 170.9 30 167.1 15 170.6 31 16 170.7 INSTRUCil0NS On this format, list the average daily unit power level in Mue-Net for each day in the reporting month.
Compute to the nearest whole neganett.
Wii SHUTIONS AS PONER REDUCTION BOCKET No. 50-29 Wii YMEE ROE REPORT M ETH APRIL,1995 BATE 850506 COMPLETED Bf S. MIPPLE TELEPWNE (617) 872-8100 Method Licensee Cause & Corrective 1
Buration 2 Of Shutting Event Systee Component Action to No.
Bate Type (Hours) Reason Boun Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-5 4/27/05 F
67.30 Ae N/A N/A N/A N/A e Power reduction to repair steae leak in el stese extraction line.
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit 6-Instructions l
S: Scheduled A-Equipeent Failure (Explain) 1-Manual for Preparation of Data l
B-Maintenance or Test 24anual Scrae.
Entry Sheets for License
(
C-Rafueling 3-Automatic Scras.
Event Report (LER) File l
D-Regulatory Restriction 4-Other (Explain)
(NURES-0161)
E-0perator Training & Licensed Enseination F-Adelnistrative 5
6-Operational Error (Emplain)
Exhibit 1 - Saee Source H-Other (Esplain)
r--
i l
DOCKET l10.
50-29 LNilT YAllKEE Role MTE B505N CollPLETED BY S.IpilPPLE TELEPHONE (617) 872-B100 REPORTllINTH APRIL, 1995 SulglARY OF WEMilll6 EIPERIEhCES 4/27/85 1442 Pouer reduced to repair steam leak in il stese entraction line.
i I
e
(
I I
i
e
,O j
e YANKEE' ATOMIC ELECTRIC COMPANY Te'epho"e(*")8'- 'oo TWX 710-380-7619 1671 Worcester Road Framingham, Massachusetts 01701
()iji.'il -
~
May 6, 1985 17.R.4.2 FYR 85-51 United States Nuclear Regulatory Comission Director, Office of Management Information and Program Control Washington, D. C. 20555
Dear Sir:
Subm.8.tted herewith is the Monthly Statistical Report for the Yankee Atomic Power Station for the month of April 1985.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY W
L. ii. lleider Vice President / Manager of Operations Lill{/smh cc: Region I Office of Inspection and Enforcement
/$