Monthly Operating Rept for Apr 1985
ML20129G488
Person / Time
Site: Farley 
Issue date: 04/30/1985
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8507180076
Download: ML20129G488 (5)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1985 During the month of April, there was one unit shutdown which occurred as planned on April 6, 1985 and initiated the Cycle VI-VII refueling outage.

The following major safety-related maintenance was performed in the month of April:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

2.

Eddy current examinations were performed on tubes in the 1A and 1C steam generators. One tube in the IC steam generator was plugged because it exceeded the pluggable limit. Eddy current testing in the IB steam generator is scheduled to be ccmpleted in May.

3.

The reactor was de-fueled and planned inservice and visual inspections of the reactor vessel were completed. The fuel, including 76 new fuel assemblies, was placed back into the reactor vessel.

4.

The anti-vibration bars (AVBs) in the IB steam generator are being removed and replaced with AVBs of a different design. This replacement is in response to concerns about accelerated wear of the steam generator tubes caused by AVBs of the old design.

5.

Thirty-two containment vertical tendon field anchors have been removed, inspected and replaced. No cracks have been found.

A combined total of 55 horizontal and dome tendon anchors have been inspected.

A>' 1?

'\\

i

[

l 0507180076 G50430 gDR ADOCK 05000348 PDR l

O OPERATING DATA REPORT 50-348 DOCKET NO.

DATE May 3, 1985 COMPLETED BY J. D. Woodard TELEPHONE (205) 699-5156 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit 1 Notes April, 1985

1) Cumulative data since
2. Reporting Period:
3. Licensed Thermal Power (MWt):

96so 12-1-77, date o'f 860 commercial operation.

4. Namepiste Rating (Cross MWe):

829

5. Design Electncal Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

R60 9 816.5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions. If Any:

v/A This Month Yr..to-Date Cumulative 719 2.879 64,991

11. Hours in Reporting Period 126.8 2,267.4 AA 196.4
12. Number Of Hours Reactor Was Critical 0.0 0.0 3.650.0
13. Reactor Reserve Shutdown Hours 126.5 2.221.3 43,245.7
14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 329.500 5.793,203 109,693,778
17. Gross Electrical Energy Generated (MWH) 105,332 1.876.160 na 970 474
18. Net Electrical Energy Generated (MWH) 94.616

, 77, s99 32.902.568 17.6 77.2 66.5

19. Unit Service Factor 17.6 77.2 66.5
20. Unit Availability Factor 16.1 75.4 63.4
21. Unit Capacity Factor (Using MDC Net) is.9 74.1 61.1
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate nn 2.9 12.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

N/A 5-19-85

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08-06-77 08-09-77 08-20-77 og_ig_77 INITIAL ELECTRICITY COMMERCIAL OPERATION 12-01-77 12-01-77 (9/77)

DOCKET NO.

50-348 I

UNIT DADE Mav 1-1985 J.D. Woodard COMPLETED BY TELEPHONE (205) 899-5156 MONTl!

April, 1985 j

DAY AVERACE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 17 809 2

gg 0

3 g IT~ ~ - - -

. _ _. g 9 -

0 0

4' Ann 20 3

798 21 0

6 99 22 n

0 0

7 D

0 24 0

8 09 o

25-0 0

10 n

26 11 0

27 0

0 12 0

23 0

0 13 7

0 0

14 30 l

l 15 0

31 16 n

l l

l (NSTRUCDONS On this format. list the aversge daily unit power Icvelin M%~e Net for each d.sy in the reparting rnunth. Compute to

, the nesic:t whule me;2 watt.

(997)

O

O O

O

$0-348 UNITSiluTDOWNS AND POWER REDUCI10NS DOCKET NO.

UNIT NAME J.M. Farley - Unit 1 DATE May 1 1985 REPORT MONTH Apri1. 1985 COMPLETED BY M k'oodara TELEPilONE (20s) 899-5156 i

b c_

re 3 us =

g g$

k

'8 5b k%

C'"'* A C'"'I'*

N"-

Dd '

  • E o

e 5 cc Event uv 3

Acti.us to 40 o

o3 jijg Repmi#

p,,,,,,g,c,,,,,c, 5

002 850406 S

592.5 C

1 N/A N/A N/A Unit was taken off line for the. Cycle VI - VII refueling outage.

1 l

j 1

1 2

3 4

F: Forced Reason:

Method:

Exhibis G. Insecuctions S: Schedided A-Equipmens Failure (Emplain) 1 -Manual for Psepasation of Data B Maintenance of Test 2 Manual Scrasa.

Entey $hecis for I.icensee C-Refueling 3 Automatic Scram.

Eveni Repawi (1.ER) File (NUREG-D-Regulainsy Resisicsion 4 Osher (Emplain) 016l)

E-Opesaior Training & license Examination F-Adminisisative 5

G-Ope ational Essus (limplain)

Exhibii ! Same Source (9/77) 11 Othes (Explain)

~

7 Calling Address Alabama Powsr Company 600 N2rth 18th Street Post Office Box 2641 Birmingham, Alabama 352%1 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building Alabamalbwer

.es w cme.a s,~ s May 13,1985 Docket No. 50-343 l

Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the April 1985 Monthly Operating Report 2

for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of

- Appendix A of the Technical Specifications.

If you have any questions, please advise.

Yours very ly, 2

'(

-[

R. P. Mcdonald t

RPM /KWM: sam Enclosu res-xc: Director, IE (10 copies)