PM-85-077, Monthly Operating Rept for Apr 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1985
ML20129G473
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/30/1985
From: Pirooz H, Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PM-85-077, PM-85-77, NUDOCS 8507180069
Download: ML20129G473 (4)


Text

,

Apyendly. 12.6 S110REHAM NUC_ LEAR POWER _ STATIO!!

4 AVERACE DAILY UNIT POWER LEVEL DOCKET UO. 50-322 UNIT _1 DATE 5/10/85 _

COMPLETED BYH. Pirooz TELEPHONE _(513)l29-8300 MONTil April 1985 DAY AVERAGE DAILY FO'.JER LEVEL

- DAY AVERACE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 17 0

1 0

18 0

2 0

19 0

3 0

20 0

4 0

5 0

21 0

0 22 0

6 7

0 23 0

0 24 0

8 0

25 0

9

'10 0

26 0

11 0

27 0

28 0

12 0

29 0

13 0

30 0

14 0

31 0

15 0

16 0

SPF A.005.01-5, Rev. D SP 51.005.01 Rev. 1 s

[h 85043o g

'\\

D 50003 y

\\

PD

Appendix 12.7_

SliOREHAM NUCLEAR POWER STATION i

OPERATING DATA REPORT DDCKET l'O. 50-322 l'N IT 1

DATE 5/10/85 COMT'LETED BYH.Pirooz TELEP110*:7. (516) 929-8300 l

OPERATING STATUS 0

. Groso llours in Reporting PeriodMax. Depend. Capacity (inie-hei Rrporting Period:S RS 0.024 1.

Currently Authorized Power Level (MWt ):

- 2 Design Electrical Rating (MWe-Net):

844 (MWe-Net): N/A Power Level to which Restricted (if 3 y) 3.

Reasons for Restriction (if any):

This month Yr to Date Cumelative 4.

0 0

0 Nu:aber of Hours Rea ctor wa s Crit ical.........,

0 0

0 5.

Reac to r Re s e rve Shutdown liours................

0 __

0 0.

6.

Ilours Generator on Line.......................

0 0

0 7.

Uni t Re se rve Shut down liours...................

0 0

~

0

~

8.

Cr os s The rmal Ene rgy Gene rat ed (MW11)..........~

0 0

0 9.10. Gross Electrical Energy Generated (MWit).......

0 O

0 Electrical Energy Generated (MWH).........

N/A

11. Net
12. Reactor Service Factor........................

N/A

~

13. Reactor Availability Factor...................

Service Factor...........................~

N/A N/A

14. Unit Ava ila bili t y Fa c t o r......................
15. Unit N/A
16. Unit Capacity Factor (Using MDC)..............

N/A

[

17. Uni t Capacity Factor (Using Design MWe).......

g/i Forced Outage Rate.......................

And Duration of Each):

18. Unit 6 Months (Type, Date,

'19. Shutdowns Scheduled Over Next 7/1/85 end of Report Period, Estimated Date of Startup:

FORECASI ACHIfXED

20. If Shut Down atStatus (Prior to Commercial Operation):
21. Units in Test 3 185 33]L INITI AL CRITICAll1Y 8/1/85 INITI AL ELECTRIC 11Y Ig3_0/85 _ _ _ _ _

COMMERCIAL OPERATION SPF 51.005.01-6, Rev. O SP 51.005.01 Rev. 1 Page 19 A

b L

1

,i Appendix 12.8 S!!ORI:ll A!f

  • t:CI. EAR l'OW E!: STATION Uf;1T SituTlXIW: ' At<D PCWER RLDUCTi'ONS DOCKET No.

50-322 UNIT NAME 1

DATE 5/10/85 COMPLETED BY H. Firooz TELEPlf0NE(516) 929-8300 REPORT MONTH 4/85

)

!!ETl!OD OF I

I SilUTTI!;C DOWN j

}

l TYPE

{

TifE REACTOR OR l

l

{

F: FORCED DI: RATION CORRECTIVE ACTIONS / COMMENTS b;O. l DATEi S: SCliEDULED

{

(110URS)

REASON (1)

, REDUCING POWER (2) l 1

{

?

NONE i

I i

i i

"{

i

{

i 1

4 i

i i

i

SUMMARY

Awaiting 5% Power License

'SP 51.005.01 Rev. 1

' ' -N S. 01-7, Re v.

O Page 20

e e

4,g LONG ISLAND LIGHTING COMPANY SHOREH AM NUCLE AR POWER ST ATION

  • P.O. BOX 628 = W ADING RIVER, NEW YORK 11792 TE L. (516) 929-8300 May 13, 1985 PM-85-077 Director, Office of Resource Management U. S.

Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

In accordance with Technical Specifications Section 6.9.1.8, enclosed is a copy of the Shorehara Nuclear Power Station April Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

Very truly yours, W. E. Stei4e Plant Manager WES/km Enclosure cc:

Dr. Thomas Murley, Regional Administrator P.

Eselgroth, Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR-A43.700 o

FC 8682.2