MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
'
' t OPERATING DATA REPORT DOCKET NO. 50-333 DATE JULY 1985 COMPLETED HY J. COOK TELEPHONE (315)342-3840 OPERATGIG STATUS
- 1. Unit Name: FitzPatrick : Notes :
- 2. Reporting Period: 850601 - 850630 : :
- 3. Licensed Thermal Power (MWt): 2436 : :
- 4. Nameplate Rating (Gross MWe): 883 : :
- 5. Design Electrical Rating (Net MWe): 821 : :
- 6. Maximum Dependable Capacity (Gross MWe): 830 : :
- 7. Maximum Dependable Capacity (Net MWe): lC
- 8. If Changes occur in Capacity Ratings (Items 3 Through 7) Since Last Report Give Reasons:
NONE
- 9. Power Level To Which Restricted, If Any (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 72C 4343 87024
- 12. Number Of Hours Reactor Was Critical 572.7 1736.4 61352.4
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 508.6 1605.4 59552.7
- 15. Unit Reserve Shutdown Hours' 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 935472 3495264 126431218
- 17. Gross Electrical Energy Generated (MWH) 305750 1179680 43359960
- 18. Net Electrical Energy Generated (MWH) 294605 1140260 __ 41538265
- 19. Unit Service Factor 70.6% 37.0% 66.4%
- 20. Unit Availability Factor 70.6% 37.0% 66.4%
- 21. Unit Capacity Factor (Using MDC Net) 50.5% 32.4% 61.9%
- 22. Unit Capacity Factor (Using DER Net) 49.8% 32.0% 56.1%
- 23. Unit Forced Outage Rate 27.8% 10.9% 13.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NONE
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved' INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~{
0507180058$h00033 PDR ADOCK PDR R jfg 2?k s I
l g.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FitzPatrick DATE JULY 1985 COMPLETED BY J. Cook TELEPHONE (315)342-3840 MONTH JUNE 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 47 777 1 17 153 733 2 18 153 725 3 19 123 780 4 20 0 735 5 21 '
0 712 6 22 0 796 7 23 0 508 8 24 59 0 9 25 142 391 10 26 0 607 11 27 193 739 12 28 458 790 13 29 563 798 14 30 594 ---
15 31 699 16
SUMMARY
- The FitzPatrick plant returned to service after refueling at the beginning of this reporting period. On 850604 the plant was shutdown for maintenance and returned to service en 850609. On 850610 the plant scrammed on high steam flow
- and returned ec service on 850612. The unit operated at near full thermal power until 8506?4 when the reactor scrammed on high flux. The plant returned to service on 850626 and operated at near full thermal power through the end of the reporting period.
UNIT SHUTDOWNS AND F0WER REDUCTIONS DOCKET NO. 50-111 UNIT NAME FitzPatrick DATE July 1985 REPORT MONTH Jimp logs COMPLETED BY J. Cook TELEPHONE (315)342-3840 z moo SG z 5d LICENSEE @u a CAUSE & CORRECTIVE NO. DATE $ H$ 8 @U* EVENT $$ $$" ACTION TO
$ 0 } ((g REPORT # $" . PREVENT RECURRENCE x c 3 850214 S 15.5 C 3 85 -006 TB N/A SHUTDOWN FOR REFUELING (Cumulative hours 2541.7, 850601 began cycle 7) 4 850604 F 123.3 A 1 TB SHUTDOWN TO INVESTIGATE CENERATOR EXCITER BEARING VIBRATION. Replaced bearing, realigned shaft and returned to service.
5 850610 F 38 G 3 85-017 JC REACTOR SCRAM ON FALSE HIGH STEAM FLOW SIGNAL CAUSED BY IMPROPER VALVE POSITIONING. Corrected valve line up and returned to service.
6 850624 F 34.6 A 3 AD CAUSE AND CORRECTIVE ACTION ARE STILL UNDER INVESTIGATION AT THE TIME OF THIS SUBMITTAL.
~
1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (E.cplain) 1-Manual for Peparation of Data B-Maintenance of Test 2-Mer.ual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG D-Regulatory Restriction 4-Other(Explain) 0161 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other(Explain) w
2
, NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JUNE 1985 The FitzPatrick plant returned to service on June 1,1985 af ter completing a refueling and maintenance outage and commenced cycle 7. On June 4th the plant was shutdown to_ investigate high vibration in the generator exciter bearing. Repair was completed and the unit returned to service on June 9th.
On June 10th a Reactor Scram occurred due to a false high steam flow signal, the result of personnel error. A complete review of the incident was conducted and the plant returned to service on June 12th. On June 24th a Reactor Scram occurred due to personnel unlocking "B" recirculation pump scoop tube which in turn caused flow oscillations and a high neutron flux condition. A critique of the event is underway and the LER forthcomming.
i The unit returned to service on June 26th.
At the enel of the reporting period the FitzPatrick plant is operating at approximately 798 Mw, .
4.
l s
a f
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
JUNE 1985 ACTION TAKEN REPAIR WORK REQUEST NO. HOW CAUSC OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DE1ECTE11 MALFUNCTION MALFUNCTION RECURRENCE HOURS 850611 02 038689 OPS TEST TO VERIFY PERFORM A CALIBRATE UPT's AS PER 6 DPT-117A,B OPERABILITY FUNCTIONAL ISP-202 TEST 850613 02 032667 OPS ZERO SHIFT ON STEAM LINE & FLOW ADJUSTED ZERO 5 FE-88 B 06-FT-51B LOOP ARE OFF 850606 02 039454 OPS LOOSE WIRE ON RED PEN DRIVES FIXED WIRE ~ 12 TR-165 TERMINAL BLOCK UPSCALE 850607 02 023163 I&C SUSPECT LOOSE STATUS LIGHT WOULD RE-INSERTED RELAY IN 4 DS-41B RELAY IN SOCKET NOT COME ON SOCKET ww '
850625 02 023169- I&C FAULTY LEAD RELAY FAILED TO ORIENT LEADS FOR RELAYS 6 2F-K3B ORIENTATION GIVE RCIC SIGNAL 850614 02-1 039608 OPS UNKNOWN CONTROL ROD $ LOGIC FOR RSCS, SAT. 16 CRD-30-27 TRANSFERRED TO POSITION MAINTENANCE INDICATION 850611 02-3 039515 OPS NORMAL WEAR REACTOR VESSEL REPLACED PRINT WHEEL 2 TR-89 MARKING WHEEL IS OFF 850612 02-1 039511 OPS ROD 06-11 GIVING CAN NOT SELECT BYPASSED ROD AT 09-27 8 RMCS "NOT FULL OUT" CONTROL ROD PANEL
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
JUNE 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURF 850611 03 039549 OPS BAD PROBE FULL IN & OUT REPLACE CARD AND 4 CRD-14-07 BUFFER CARD LIGHTS BOTH ON PERFORM F-IMP-3.7 850611 07 039496 OPS AGE DOES NOT ADVANCE REPAIR AND CALIBRATE 6 PR-46B IN SLOW SPEED MOTORS 850611 07 039514 OPS ADJUST DOWN FOR WON'T TRIP UNTIL ADJUST COUNT CIRCUIT 1 APRM C LPRM REPLACEMENT LESS THEN 11LPRM INOP TRIP INPUTS RECEIVED 850612 07 039515 OPS ADJUST DOWN FOR WON'T TRIP UNTIL ADJUST COUNT CIRCUIT 1 APRM F LPRM REPLACEMENT LESS THAN 11LPRM INOP TRIP INPUTS RECEIVED 850613 07 034702 OPS ZERO SHIFT FLOW UNIT READING CALIBRATED 02-FT-110G 10 FU-14C IS TOO LOW 850604 07 039430 OPS DRIFT DOWNSCALE TRIP NOT ADJUSTED DOWNSCALE TRIP 2 APRM D CORRECT 850604 07 039431 OPS DRIFT DOWNSCALE TRIP ADJUSTED PER 2 APRM F CAME IN AT 7% ISP-20(5.1-5.9) 850611 07 039429 OPS CABLES.A,B,C FLUX PROBING REPLACED CABLES, FIXED 118 TIP-A,B,C,D RaJ) SHORTS MONITOR BROKEN PLOTTER
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT-MAINTENANCE
SUMMARY
JUNE 1985 ACTION TAKEN REPAIR WORK REOUEST NO. Il0W CAUSE OF RESULTS OF 'IO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION REPURRENCE HOURS 850621 10 034674 OPS SENSOR NOT DOES NOT INDICATE REPALCED SENSOR 16 LS-104 SWITCHING STATES WET OR DRY PERFORMED F-IMP-G30 850621 10 034678 OPS INSTRUMENT DRIFT DOES NOT INDICATE ADJLTSTED GAIN 4 LS-103 DRY 850609 13 039478 OPS INDICATOR ALARM WILL NOT MOVED INDICATOR 6 TS-2 STUCK CLEAR 850610 13 039487 OPS LOOSE SCREW SPEED CONTROL NOT REPLACED SCREW 12
- TU-2 WORKING 850606 16 039467 OPS 16A-K7B CONTACT RELAY DROPS OUT REPLACED RELAY 22 16A-K56 BENT WHEN IT SHOULD NOT 850621 17 037066 OPS BAD DETECTOR DOWNSCALE INOP REPAIRED CABLE 9 RM-350 CABLE CONDITION 850605 23 039415 OPS WIRE WAS COULD NOT CLOSE ATTACHED WIRE TO 2 23A-J1 DISCONNECTED CIRCUIT TB BB-10B 850605 23 039551 OPS AIR IN LINES INDICATED 760GPM PERFORMED IMP-23.3 AND 14 FIS-78 WITH NO FLOW PUMFED LINES 850605 23 038758 I&C UNKNOWN OUT OF PROCEDURE ADJUSTED CHANNELS 0 LT-201C,A TOLERANCE LOW
NEW YORK POWEP, AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT
~
MAINTENANCE
SUMMARY
JUNE 1985 ACTION TAKEN REPAIR WORK REOUEST NO. 110W CAUSE OF RESULTS OF '10 PRECLUDE TIME DATE SYSTEM C0"PONENT NO. DETECTED MALFUNCTION MALFUNCTION PECURRENCE HOURS 850611 36 038692 OPS CABLE TO RTD INCORRECT RTD REPLACED RTD AND FIXED 20 RTD-106D WAS DAMAGED MEASUREMENT CABLE 850604 72 033773 OPS UNKNOWN ALARM IN, NORMAL RAN ISP-87, EVERYTHING 2 DPS-104B FLOW OF AIR SATISFACTORY 850603 76 036824 OPS BAD RELAY- ALARM BELL RINGS REPLACED RELAY 32 FPCP CONTACTS SHORTED CONSTANTLY I
e J
4' e NEW YORK PWER AUIHORITY .
JAMES A. FITZPATRICK hTCLEAR POWER PIANT .
SAFETY REIATED ELEClRICAL & MECHANICAL MAINIEAFCE SlWARY -
JUNE 1985 REPAIR kORK REQUEST f TIME DAIE SYSTEM CTPONENT HOR DETECTED CAUSE OF MAIJUNCTION ACTION TAKEN 'ID PRECLUDE RECURRENCE FOURS 5/29 10 27313 OPS Seat leakage Replaced safety valve 5 SV35B 5/28 16 39649 OPS Seal Leakage Adjusted air lock door 8 16X2A 5/28 13 21559 OPS Seat Leakage Replaced valve 103 F0V131 5/28 02 39646 OPS Damaged 'Ihreads Replaced inst. air valve 3 RV-71B 5/25 03 39580 OPS Leakage Replaced acctmulator 15 HCUO6-43 5/25 46 39579 OPS Breaker Out of Adjusted trip latch mechanism 10 P-2A Adjustment 5/25 71 22706 . OPS Blown Irg Fbse Replaced fuse 24 INV 3A
> 6/3 02 35412 OPS Seat Leakage Replaced valve 120 RkR14B 6/3 10 28617 OPS Packing leak Replaced packing 10 F0V-27A 6/3 10 35407 OPS Seat leakage Repaired valve seats 102 ADV-39B 1
+ o NEW YORK POWER ALTTHORITY .
JAMES A. FITZPATRICK NUCLEAR POWER PIANT ,
SAFE 1Y REIATED ELECTRICAL & MECFANICAL PAINIENANCE SIWARY -
JLKE 1985 REPAIR WRK REQUEST # TIME DATE SYSTDI CCMPONENT IKM Drlu;1tu CAUSE OF MAIRINCTION ACTION TAKEN 'IO PRECLUDE RECURRENCE N0lHS 5/31 10 36679 OPS Rotor Switch Adjusted rotor #3 switch 2 FDV-15C 5/31 23 22711 OPS Failed Contact Replaced contactor 20 MOV-25 5/31 02 39630 OPS Failed Torque Switch Replaced torque switch 18 F0V-54B 5/31 02 39600 OPS Electrical Ground Re-spliced connector 6 SRV-7]A 5/31 29 38775 OPS Failed 90% Switch Replaced switch 28 A0V-80A 6/6 02 23891 OPS Pilot Valve Leakage Replaced pilot assably 30 RV-71F 6/13 01-125 39471 OPS Expended Charcoal Replcced charcoal 66 F-2A
e' 7 J:mes A. Fit P: trick Nucle:r Power Pl:nt P.O. Box 41 Lycoming. New York 13093 315 342.3840 Harold A.Glovier A NeMoher tv Authority July 3, 1985 JAFP 85-0569 Director, Office of Inspection and Enforcemcnt U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of June, 1985, Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
/
, . AJ HAROLD A. CLOVIER 7
e$t HAG:JPC:mac Enclosures cc: Distribution i <
f u
\
lk