Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B772 + (15:20:34, 12 December 2024)
- ML20132B771 + (15:20:35, 12 December 2024)
- RBG-21649, Forwards Rev to FSAR Re Recirculation Flow Control Hydraulic Penetrations,Per Containment Sys Branch Request. Potential Drywell Bypass Leakage Through Four Penetrations Approx 2% + (15:20:36, 12 December 2024)
- ML20132B769 + (15:20:36, 12 December 2024)
- ML20132B767 + (15:20:37, 12 December 2024)
- ML20132B765 + (15:20:38, 12 December 2024)
- ML20132B761 + (15:20:39, 12 December 2024)
- 05000263/LER-1996-011-01, :on 961112,jumper Placement Error Occurred During Surveillance Procedure,Causing Dual Recirculation Pump Trip Requiring Manual Scram.Caused by Inadequate Labeling.Surveillance Procedure Revised + (15:20:40, 12 December 2024)
- ML20132B759 + (15:20:42, 12 December 2024)
- ML20132B758 + (15:20:42, 12 December 2024)
- HL-5278, Special Rept:On 961203,30 Days Elapsed Since Position Indication Light for MSIV 1B21-F022D Declared Inoperable. Caused by Limit Switch Out of Proper Adjustment for Power Conditions.Light Will Be Restored During Next Outage + (15:20:43, 12 December 2024)
- ML20132B754 + (15:20:44, 12 December 2024)
- ML20132B753 + (15:20:44, 12 December 2024)
- TXX-4518, Forwards Listed Documents,Including Rev 3 to Engineering Justification for Placement of Automatic... by Prof Loss Control,Inc & Table Listing Fire Area NFPA Code Compliance. Encls Should Close Concerns Re Sprinkler Sys + (15:20:45, 12 December 2024)
- PY-CEI-NRR-0350, Suppls 850717 Response to 850520 Request for Addl Info Re Offsite Dose Calculation Manual.Emergency Svc Water Radiation Monitors Will Be Set to Alarm at Three Times Measured Background Level + (15:20:46, 12 December 2024)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed + (15:20:47, 12 December 2024)
- ML20132B747 + (15:20:47, 12 December 2024)
- ML20132B745 + (15:20:48, 12 December 2024)
- ML20132B743 + (15:20:48, 12 December 2024)
- ML20132B742 + (15:20:49, 12 December 2024)
- ML20132B740 + (15:20:50, 12 December 2024)
- ML20132B741 + (15:20:50, 12 December 2024)
- NRC-96-0125, Forwards Addl Info on Proposed TS Change on Administrative Controls + (15:20:51, 12 December 2024)
- ML20132B737 + (15:20:52, 12 December 2024)
- ML20132B736 + (15:20:52, 12 December 2024)
- ML20132B734 + (15:20:53, 12 December 2024)
- ML20132B730 + (15:20:54, 12 December 2024)
- ML20132B731 + (15:20:54, 12 December 2024)
- ML20132B727 + (15:20:55, 12 December 2024)
- ML20132B725 + (15:20:56, 12 December 2024)
- ML20132B724 + (15:20:56, 12 December 2024)
- ML20132B723 + (15:20:57, 12 December 2024)
- ML20132B721 + (15:20:58, 12 December 2024)
- ML20132B718 + (15:20:58, 12 December 2024)
- ML20132B717 + (15:20:59, 12 December 2024)
- ML20132B716 + (15:21:00, 12 December 2024)
- ML20132B714 + (15:21:01, 12 December 2024)
- ML20132B713 + (15:21:01, 12 December 2024)
- 3F0985-10, Forwards Supplemental Response to Violations Noted in Insp Rept 50-302/85-29.Corrective actions:short-term Instruction Issued W/Applicable Offsite Dose Calculation Manual Requirements & SP-220 Performed Satisfactorily + (15:21:02, 12 December 2024)
- IR 05000346/1983023 + (15:24:40, 12 December 2024)
- ML20132B709 + (15:24:41, 12 December 2024)
- U-600262, Forwards Closure Schedule for Open Items Identified in NRC Audit Conducted During Wk of 850826 of Facility Seismic & Dynamic Qualification of Equipment,Per SER Outstanding Issue 7ii + (15:24:42, 12 December 2024)
- ML20132B704 + (15:24:43, 12 December 2024)
- ML20132B707 + (15:24:43, 12 December 2024)
- ML20132B703 + (15:24:45, 12 December 2024)
- ML20132B702 + (15:24:46, 12 December 2024)
- ML20132B701 + (15:24:47, 12 December 2024)
- 05000295/LER-1985-028, :on 850806,during Review of Tech Spec Surveillance Requirements,Discovered That Svc Bus Undervoltage Start of Steam Driven Auxiliary Feedwater Pump Not Periodically Tested + (15:24:49, 12 December 2024)
- ML20132B697 + (15:24:52, 12 December 2024)
- ML20132B696 + (15:24:52, 12 December 2024)
- ML20132B692 + (15:24:54, 12 December 2024)
- ML20132B693 + (15:24:54, 12 December 2024)