t INFORMATiON REPORT November 17, 1983 SECY-83-72C For:
The Commissioners From:
William J. Dircks Executive Director for Operations Sub.iect:
RESULTS OF OPERATOR LICENSING EXAMINATIONS FOR THIRD QUARTER FY 1983 AND REQUALIFICATION EXAMINATIONS FOR THIRD AND FOURTH QUARTERS FY 1983 Purcose:
To infonn the Commissioners of examination and licensing, activities for Reactor Operators and Senior Reactor Operators, including requalification examination results.
~
Discussion:, The enclosed tables report licensing action results, including issuances, denials or w.thdrawals and pass / fail rate for each NRC licensing examination component.
The results are presented as a combined total and broken down by region, since the operator licensing function is now fully decentralized.
Also included *are tables showing the results of the recualification examinations t
l given.
Recualification examinations 'were started in June 1983 in accordance with the program described in SECY 83-252.
To date.
l l
although some program deficiencies have been identified and corrected, the overall quality of requalification training programs for licensed operators has been satisfactory.
In our report dated May 23,1983, (SECY 83-72A), we indicated that fourth quarter FY 1983 licensing examination results would be included in this report.
However,'due tc, a software problem, we cannot provide this infomation at this time.
Contact:
Don H. Beckham, x24868 r
c n l. z i 4 $ 9 2 5 y
The Commissioners The problem has been identified and is being corrected. We will include fourth ouarter FY 1983 and first quarter FY 1984 results in our next report..
William J. Dircks Executive Director for Operations
Enclosures:
1.
Operator Licensing Tracking System Quarterly Status Report - Total 2.
Operator Licensing Tracking System Quarterly Status Report for Regions I through V for the Third Ouarter FY 1983 3.
Requalific'ation Examination Results for Regions I through V for the Third and Fourth Quarter FY 1583 C
, unsp O
f G
0 e
e I
e 6
)236315 CPERATC2 LICENSIN3 TRACKING SYSTEM 3rdQuafter' JE 11/03/83 ACTIVITY STATUS REPORT TCtG1 84/01/83 THROUGH 06/30/83 WRITTEN ORAL SIMULATOR TOTAL SPASS OFAIL OPASS OFAIL OPASS OFAIL TAKEN
-INITIAL - RD 167 /
55 17 9 /
22 18 /
1 223 75.2% / 24.8%
89.1% / 10.9%
94.7% /
5.3%
SRO 101
/
35 ISS /
8 11 /
0 136 74.3% / 25.7%
93.1% / 6.9%
100.0% /
0.0%
BPPLICATIONS - R0 17
/
5 10 /
2 1 /
I 24 77.3% / 22.7%
83.3% / 16.7%
50.0% / 50.0%
SRO 4 /
2 2 /
1 0 /
0 7
66.7% / 33.3%
66.7% / 33.3%
0.0% /
0.0%
UPGRADE - SRO 49 /
12 51
/
1 5 /
0 63 80.3% / 19.7%
98.1% /
1.9%
100.0% /
0.0%
TOTAL - RO 884
/
60 189 /
24 19 /
2 247 75.4% / 24.6%
88.7% / 11.3%
90.5% /
9.5%
SRO 154
/
49 16 1 /
10 16 /
0 206 75.9% / 24.1%
94.2% / 5.8%
100.0% /
0.0%
e SISSUED SDENIED SWITHDRAWN INITIAL -
RO -
80 31 10 SRO -
29 26 3
INST CERT -
t 0
0 LTD SRO -
0 0
0 2PPLICATIONS -
RO -
5 3
O SRO -
3 1
2 INST CERT -
0 0
0 LTD SRO -
0 0
0 UPGRADE -
SRO -
19 6
2 TOTAL -
RO -
85 34 le SRO -
51 33 7
INST CERT -
1 0
0 LTD SRO -
0 0
0 RENEWAL -
RO -
45 1
1 SRO -
96 1
2 INST CERT -
0 0
0 LTD SRO -
1 0
0 e
f re t
I ra LN nu AE 6
1 6
0 8
2 9
- Q TK 5
1 1
6 2
i OA gd TT er R3 L
I 0000 0000 00 8000 RA OF 6
8 0
0 0
s 0
T1 A
L
//// //// // ////
UM 1008 08 20t0 I5
- 10. t 0 S5 A
0 0
0 0
0 0
0 P
0 0
0 0
0 B
1 1
1 1
1 M
E T
S' YS 3 8 GT/
NR0 L
IO3 I
4300 8000 80 4808 KP/
A CE6 F
7 0
8 0
0 6
0 AR0 8
R L
T5H A
//// / /// // ////
0G R
G1" O
5 2.2 70 NA0 5
8710 4000 60 5
ITR 5 5 1
1 SSH A
2 0
0 0
0 3 S N
N T P
9 0
0 0
9 S W
EY G
1 1
1 I
A CT3 R
II8 D 5000 0000 1
5100 1i00 LV/
H I1 T
RT0 I
OC/
W TA4 S
A 0 RE PO D
L E
I 3200 2000 42 5048 I
6100 1000 3
7400 0e00 A
1 1
N F
3 0
0 0
2 5 3 E
NO 2
5 2
2 1
D E
S T
//// //// // ////
T I
48 5052 RS 3810 20.O0 WS 4 1
I 4 2 A
6 0
0 0
7 5 6 D
P 7
0 5
7 7 8 E
U 3300 1100 8 4200 0300 8
1 S 2 21 11 S
I S
OOTO OOTO O OOTO OOTO RRRR RRRR R RRRR RRRR SES SES S SES SES C
C C
C D
D D
D TT TT TT TT O O O O O
R R N
N N
N S
S S
S I
I I
I 3
L S
E L
L S
E L
L 8
A N
D A
A N
D A A
/
I O
A T
I O
A T
W 2
T I
R O
T I
R O E
0 I
T G
T I
T G
T H
5/
N A
P N
A P
E 11 I
C U
I C
U R
31 I
I 6
L L
3 P
P
?
P
M gica 11.-
$6315 OPERATOR LICENSING TRACKING SYSTEM 3rd Quartcr FY l
.* 11/02/83 ACTIVITY STATUS REPORT I
04/01/83 THROUGH 06/30/83 l
WRITTEH ORAL SIMULATOR TOTAL OPASS OFAIL OPASS OFAIL
.tffli 0 FAIL TAKEN l
INITIAL - RO 63 /
19 65 /
13 10 /
1 83 76.8% / 23.2%
83.3% / 16.7%
90.9% /
9.1%
1 SRO 28 /
5 32 /
1 7
/
0 33 l
84.8% / 15.2%
97.0% /
3.0%
100.0% /
0.0%
PLICATIDHS - RO 2 /
1 1
/
1 0 /
1 3
5 66.7% / 33.3%
50.0% / 50.0%
0.0% /100.0%
SRO 1
/
0 0 /
8 0 /
0 1
100.0% /
0.0%
0.0% /
0.0%
0.0% /
0.0%
UPGRADE - SRO 7
/
7 9 /
0 5 /
0 15 50.0% / 50.0%
100.0% /
0.0%
100.0% /
0.0%
TOTAL - RO 65 /
20 66 /
14 10 /
2 86 76.5% / 23.5%
82.5% / 17.5%
83.3% / 16.7%
SRO 36 /
12 41
/
l 12 /
0 49 75.0% / 25.0%
97.6% / 2.4%
100.0% /
0.0%
s OISSUED IDENIED 0 WITHDRAWN IHITIAL -
RO -
40 14 1
SRO -
19 4
0 INST CERT -
1 0
0 LTD SRO -
"O O
0
?PLICATIONS -
RO -
2 0
0 SRO -
1 0
0 INST CERT -
0 0
0 LTD SRO -
0 0
0 UPGRADE -
SRO -
5 2
0 TOTAL -
RO -
42 14 1
SRO -
25 6
0 INST CERT -
t 0
0 LTD SRO -
0 0
0 REHEWAL -
RO -
18 1
0 SRO -
46 0
0 INST CERT -
0 0
0 LTD SRO -
0 0
0 e
)236315 OPERATOR LICENSIN3 TRACKIN3 SYSTEM Regica III lEs 11/02/83 ACTIVITY STATUS REPORT 3rd Qusrter FY 83 04/01/83 THROUGH 06/30/83 WRITTEH ORAL SIMULATOR TOTAL
~
OPASS OFAIL SPASS OFAIL SPASS OFAIL TAKEN IHITIAL - RO 41
/
18 41
/
3 7 /
0 59 69.5% / 30.5%
93.2% /
6.8%
100.0% /
0.0%
SRO 38 /
24 42 /
l 3 /
0 62 61.3% / 38.7%
97.7% / 2.3%
100.0% /
0.0%
3PPLICATIONS - RO 4 /
1 1
/
1 0 /
0 5
80.0% / 20.0%
50.0% / 50.0%
0.0%./
0.0%
SRO 2 /
2 2 /
1 0 /
0 5
50.0% / 50.0%
66.7% / 33.3%
0.0% /
0.0%
UPGRADE - SRO 15 /
0 14 /
I e /
0 15 100.0% /
0.0%
93.3% /
6.7%
0.0% /
0.0%
TOTAL - RO 45 /
19 42 /
4 7 /
0 64 70.3% / 29.7%
91.3% / 8.7%
100.0% /
0.0%
SRO 55 /
26 58 /
3 3 /
0 82 67.9% / 32.1%
95.1% /
4.9%
100.0% /
0.0%
3 0 ISSUED SDENIED SWITHDRAWN INITIAL -
RO -
14 10 0
SRO -
2 14 2
INST CERT -
0 0
0 LTD SRO -
0 0
0 2PPLICATIONS -
RO -
2 1
0 SRO -
0 1
2 INST CERT -
0 0
0 LTD SRO -
0 0
0 UPGRADE -
SRO -
1 1
1 TOTAL -
RO -
16 11 0
SRO -
3 16 5
INST CERT -
0 0
0 LTD SRO -
0 0
0 REHEWAL -
RO -
2 0
0 SRO -
6 0
1 INST CERT -
0 0
0 LTD SRO -
0 0
0
6 L
- ' W D ed m L
.a 4
4 e M m m C3
=
=
,.9 O O
=
CPIT t o 1.
EM M M M M M
M M m e. m e m e. m e s e.
e m. m e.
g O
e e e e e
e e 4
J NNNN NNNN NN NNNN E
M M M M M
M M m e e s.
s e. e m.
me M
emme e
O e
e e e
e e E
W
>e>
en M
N OWN Z ag e M M M M M
M M em men >
M cgm e e. N N.
S e e m.
ggs Owe e e e e e
e w w ag e o
=
6 g
a km2 4
NNNN NNNN NN NNNN 3
3C eg
=
O>3 O
M M M M M
M M E4C en Mo=M meem em MeeM M > as W
en en Z 4
e M
e e e
e M Z
Z >-
L e M e
e e0 3
W>
e w
=
=
4 UWM Of M M e0 C ###e Seem e mese Seem
.J 'J N 3
Ma ef >- o C0%
3 W4e e
4 e SC W
LO O
l w
M M M M M
M M W
- eem M
SNee mome e SNee mees N M
- M.
M O N M.
E 4
E e
M e e e
e M
W M
e N
- c Z as W
=
a t
NNNN NNNN NN NNNN
\\
M M M M M M
M M NOMN m e.
g NNNN ee*e
=
=. e
3
==.
N Y
e O
O O
d h
l e
e W W W
I 3
Meem ewee e men e e fMe*
en en
>e i I I I I I I I I
I I I I I I I i
[
OCWC CCWC O OCHO CONC AC QC QC E GC QC OC QC DC GC OC OC aC 2C GC AC QC l
en W en en W m o eWW en W en U
U U
U i
G Q
Q Q
t'~
> > =
> >=
O O O O C
C C en J en.J en.J en.J
Z Z
Z en m
en in M
M M
M 8
1 1
I I
I I
I M
.a en W
.a
.a en W
.a
.a i
e 4
E Q
4 4
Z Q
4 4
N M
Q 4
M C
=C 3
i N
M QC C
M (M
O W
e M
O M
c >=
Z en N Z
4 Q.
Z 4
L W
M U
3 M
U 3
GC Mw M
M
.d
=d A
[
Mu
,A a
8 YF r:
t Vr LN a
AE 8 4 7 0 2
5 6
. mQu TK 2
1 2
OA i
TT gder R3 L
I 8080 0000 00 0080 RA OF 0
0 0
0 0
3 0 TO A
L
//// //// // ////
UM IS 0000 0000 00 0000 SS A
0 0
0 0
0 0
0 P
O M
E T
S Y
S 3 8
GT/
NR0 L
IO3 I
2047 8000 00 2740 KP/
A CE6 F
5 6 0
0 0
6 6 AR0 O
2 1
1 1
R L
TSH A
//// //// // ////
UG R
GTU O
03 4000 t0 0310 NAO S
60.2 1
2.
ITR S
SSH A
5 3 0
0 0
3 4 N
N T P
7 8
0 0
8 8 W
EY O
1 1
A CT3 R
II8 D
4I08 0000 0
4100 00e0 LV/
H I1 T
RT0 I
OC/
W TA4 O
A 0 RE PO A
L 1
I 2047 0000 00 2340 J 0400 0000 0
0400 0000 1
A 1
F 5 6 0
0 0
3 6 1
HO 2
1 1
1 D
E 1
T
//// //// // ////
T I
RS 6003 70.O0 3 7.2 10 10 WS 2
1 A
5 3
0 0
0 6 4 D
P 7
8 0
0 8 8 E
O 1
1 U 0500 0000 1
0600 1800 S
11 S
I O
OOTO OOTO O OOTO OOTO RRRR RRRR R RRRR RRRR SES SES S SES SES C
C C
C D
D D
D TT TT TT TT O O O O O
R R N
N N
N S
S S
S I
I I
I 3
L S
E L
L S
E L
L 8
A N
D A
A N
D A A
/
I O
A T
I O
A T
W 2
T I
R O
T I
R O E
0 I
T G
T I
T G
T H
5/
N A
P H
A P
E 11 I
C U
I C
U R
I 31 I
6 L
L 3:
P P
2E P
P 1T A
A A
E E:
- /
d
,i
)
i '
- 4 i
~'
REOUALIFICATION EXAMINATIONS GIVEN REGION I j
1 Third Ouarter Results Salem 1 & 2 Satisfactory.
Some weaknesses in several operators.
Plant has certified that retraining has been given in all weak areas.
i i-Fourth Ouarter Results Indian Point 3 Technical level satisfactory.
Deficiencies in timely review of training material by plant staff.
Procedures were revised to preclude
[
future occurrences.
Haddam Neck Satisfactory.
No significant deficiencies.
Plant staff and training personnel indicated that NRC participation in the requalification program resulted in significantly more attention being paid to this program by plant management.
o
...w__
RE00ALIFICATION EXAMINATIONS GIVEN REGION II Third Ouarter Results BnJnswick Satisfactory Farley Satisfactory Fourth Ouarter Results H.R. Robinson Satisfactory
~
Grand Gulf Satisfactory
(
e e
,----e-7 - - - - - - - -
--r---
RE00ALIFICATION EXAMINATIONS GIVEN REGION III Third Guarter Results Point Beach Audit of plant requalification program shows possible weakness in written exams.
Region III plans to participate in requalification exams scheduled for December.
Fourth Ouarter Results LaSalle Satisfactory t
e 9
,,-,...w..,-
,--.-----w.my-g y
y
,,p-w,-,--,.--e
--4
REOUALIFICATION EXAMINATIONS GIVEN REGION IV Third Duarter Resul ts None given Fourth Ouarter Results Cooper Satisfactory.
(This was an audit of recualification exans given by plant.)
ANO - Initiated Ongoing.
(Results will be reported in September First Quarter FY 1984.)
i
--,-,g r
-w-
-r
~
REQUALIFICATION EXAMINATIONS GIVEN REGION Y Third Ouarter Results Diablo Canyon Satisfactory Fourth Ouarter Results None given G
l l