Text

'i Georgia Power Company Rovte 2, Box 239A Waynestorc. Georg:a 30830 Tetepncre 404 554-9961. Est 3360 404 724 8114, Ext 3360 D. O. Fost., Georgia Power j

$$Syde[t and  ; Pro 3ect Vogtie Project Septenber 20, 1985 Director of Nuclear Reactor Regulation File: X7N00-19 Attention: Ms. Elinor G. Adensam, Chief Log: GN-698 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTE EECTRIC GENERATING PLANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 19

Dear Mr. Denton:

Georgia Power ' Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 19 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR).

This amendment consists of revised pages for the FSAR and provides revisions as documented in previous letters to the NRC and as dictated by design and/or operational updates. A listing of these letters and updates are itemized in Attachment 1. Also included are instructions for inserting the Amendment 19 FSAR changes. '

In accordance with the requirements of 10 CFR 54.30 (b) and (c), three (3) signed originals and sixty (60) copies of Amendment 19 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate to contact me.

Your truly, e o D. O. Foster SWORN AND SUBSCR:: BED BEFORE ME, THIS SA DAY OF d 3 ol*~ ,, Jo , 1985 d

8509260298 850920 g PDR ADOCK 05000424 K PDR i

} Q ( , @ ,., ,{

I NotaFy Publicy Georgia StaEe at Large Notary Public, Georgia. State at Large My Commission Expkes Jan. 7,1987 L

r 3

Director of Nuclear Reactor Regulation File: X7N00-19 September 20, 1985 Log: GN-698 Page 2 xc: M. A. Miller R. A. Thomas G. Bockhold, Jr.

L. T. Gucwa L. Fowler J. E. Joiner, Esquire B. W. Churchill, Esquire B. Jones, Esquire

. H. H. Gregory, III

] T. Johnson i - D. C. Tepet W. C. Ramsey Vogtle Project File

0051V 4

i i

4 f

i l

i1 ATTACHMENT 1 REFERENCE LFTTER REASON FOR SUBMITTAL GN-630, Bailey to Denton, 5/30/85 Draf t SER OI 105 GN-647, Bailey to Denton, 6/25/85 Chapter 13 changes and 01 11 GN-688, Bailey to Denton, 8/21/85 CI 22 GN-689, Bailey to Denton, 8/21/85 OI 11 FSAR SECTION REASON FOR CHANGE Figure 1.1-1, 9.4.1, aid Q311.6 Reflect emergency plan Figure 1.2.2-1, Figure 8.1-1 Reflect current design 1.9.37, 1.9.68 Regulatory Guide clarification 1.9.82, 6.2.2, 6.3.2, and Q480.18 Sump analysis, OI 3, GN-690, Bailey to Denton, 8/23/85 Table 1.9-1, 3.7.N Addition of code cases, Novak to Foster, 3/18/85 3.5.1 Reflect current design 3.7.4 Reflect current design 3.8.1 Reflect current design 3.9.B.3, 6.2.5, 6.4.5 , Reflect proposed Technical Specifications Table 3.11.B.1-1 Reflect 50.49 submittal, GN-701, 9/13/85 4.2 Reflect fuel assembly axial load change 4.3.2 Reflect use of born and control rods for xenon build-up 5.2.2.10 CI 17 resolution (WCAP 10529 is generic, updated 5.2.2.10 is plant specific) 5.3.1 Reflect updated procedures 5.4.2, 5.4.11 Clarification 5.4.7, Table 5.4.7-4 Reflect current design and editorial correction

I FSAR SECTION REASON FOR CHANGE Tables 6.1.1-1, 6.1.1-2 Update ESF naterials tables 6.2.1 Additional analysis for feedwater line break Table 6.2.4-1 Reflect purge valve design 7.1, 7.2, 7.6 Update of Chapter 7 to be consistent with Chapter 8 Table 7.5.5-1 Reflect current design 7.6.1 Clarification 8.3.1, 15.0.8 Consistent with response to Q440.83 8.3.1, Q430.69 Reflect current design 8.3.1 Clarification of cable tray fire boundaries 8.3.2 Clarification of battery sizing and definition of " fully charged" 9.1, 9.2, 9.3, 9.4, 9.5 Reflect current design 9.2.1, Table 9.2.1-2 Revised for editorial and train oriented consistency 9.2.5 Clarification 9.2.10 Consistent with Chapter 14 9.3.2 Revised to be consistent with GN-646, Bailey to Denton, 6/20/85 9.5.6 Clarification 10.2.3 Consistent with response to Q430.50 10.3.2, 10.3.5 Editorial correction 10.4.5 Clarification 11.2.1, Tables 11.2.1-1 & 3, Q460.16 Reflect current design 11.4.2, Table 11.4.2-2 Clarification 12.1.1, 12.5.1 Clarification and correction of inconsistencies 12.2.1 Calibration source change

FSAR SECTION REASON FOR CHANGE 12.5.2, Table 12.5.2-2, 12.5.3 Reflect current inventory, current procedures and provide clarification 13.2.1, Tables 13.2.1-5 & 6 Addition of new table and editorial corrections to reflect addition of table 13.2.2 Editorial correction Tables 14.2.1-1 & 2 Editorial correction 14.2.8.1.20, 14.2.8.1.22, 14.2.8.1.25, Reflect current design and 14.2.8.1.26, 14.2.8.1.27, 14.2.8.1.28, preoperational test procedures 14.2.8.1.29, 14.2.8.1.38, 14.2.8.1.40, 14.2.8.1.41, 14.2.8.1.59, 14.2.8.1.76, 14.2.8.1.82 14.2.8.2.2, 14.2.8.2.12, 14.2.8.2.15, Reflect current startup test 14.2.8.2.17, 14.2.8.2.20, 14.2.8.2.23, procedures 14.2.8.2.25, 14.2.8.2.34, 14.2.8.2.41 15.2.8 Reflect current E0Ps Tables 15.6.2-3 & 4 Update activity tables 15.6.5 and Table 15.6.5-7 Update activity tables 17.2.7, 17.2.12 Clarification and reflection of current VEGP organization 18.1.2 Reflect current design Q210.40, Q281.8 Editorial correction Q281.10 Consistent with resolution of CI 32, GN-692, Bailey to Denton, 8 / 23 /85 Q281.12, Q460.14 -Reflect current design <