Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-2121, Monthly Operating Rept for Nov 1996 for Perry Nuclear Power Plant,Unit 1 + (14:59:23, 12 December 2024)
- ML20132D537 + (14:59:24, 12 December 2024)
- ML20132D538 + (14:59:24, 12 December 2024)
- ML20132D533 + (14:59:25, 12 December 2024)
- ML20132D531 + (14:59:26, 12 December 2024)
- ML20132D529 + (14:59:26, 12 December 2024)
- IR 05000397/1985010 + (14:59:51, 12 December 2024)
- 05000344/LER-1985-006, :on 850612,discovered Three Pressurizer Level Transmitters Out of Calibr Low.Caused by Transmitter Drift. Transmitters Recalibr & Scheduled to Be Replaced During 1986 Refueling Outage + (14:59:55, 12 December 2024)
- NSD-NRC-96-4901, Forwards AP600 Test Program Overview, Per ACRS Request + (14:59:56, 12 December 2024)
- B16058, Submits Description of Key Interim Corrective Actions Implemented Re 961102 Refueling Canal Contamination Incident + (14:59:57, 12 December 2024)
- ML20132D517 + (14:59:57, 12 December 2024)
- ML20132D516 + (14:59:58, 12 December 2024)
- ML20132D512 + (14:59:59, 12 December 2024)
- ML20132D511 + (14:59:59, 12 December 2024)
- ML20132D510 + (15:00:00, 12 December 2024)
- 05000338/LER-1985-001-03, :on 850613,motor Driven Fire Pump Removed from Svc as Result of Maint Activity for Greater than 7 Days.Pump Returned to Operable Status on 850628.Fire Suppression Sys Operable During Event + (15:00:01, 12 December 2024)
- 05000482/LER-1985-062, :on 850902,control Room Ventilation Isolation Occurred.Caused by Chlorine Monitor Incorrectly Sensing High Chlorine Levels Due to Failure of Lamp in Monitor Analysis Unit.Lamp Replaced + (15:00:04, 12 December 2024)
- ML20132D505 + (15:00:05, 12 December 2024)
- 05000254/LER-1985-008-08, :on 850617,high Level Alarm Received from 1B/1C RHR Svc Water Vault Sump.Caused by Broken Vent Line on 1C RHR Svc Water Pump W/Vault Partially Filled W/Water.Pump Repaired & Returned to Svc + (15:00:07, 12 December 2024)
- ML20132D502 + (15:00:08, 12 December 2024)
- 05000206/LER-1985-012-02, :on 850616,east Vacuum Pump Never Came Out of Starting Current.Caused by Malfunction of Breaker 52-1117. Breaker Being Repaired + (15:00:10, 12 December 2024)
- ML20132D500 + (15:00:11, 12 December 2024)
- 05000483/LER-1985-030, :on 850617,pressurizer Vapor Sample Outer Containment Isolation Valve Not Tested within Required Tech Spec Frequency Extension Limits.Caused by Personnel Error. Personnel Counseled + (15:00:13, 12 December 2024)
- TXX-4558, Informs That Response to Generic Letter 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps, Will Be Submitted on 860215 + (15:00:14, 12 December 2024)
- 05000331/LER-1996-005-01, :on 961020,PCIS Groups 3 & 5 Isolations Occurred Due to Temporary Power Connections to Instrument Ac.Temporary Power Cart Was Removed from Breaker That Was Also Supplying Power to 1Y2A + (15:00:16, 12 December 2024)
- ML20132D489 + (15:00:18, 12 December 2024)
- 05000483/LER-1985-031, :on 850620,lo-lo Level in Steam Generator Initiated Reactor Trip Auxiliary Feedwater Actuation Signal & Steam Generator Blowdown Isolation Signal.Caused by Personnel Error.Procedure Revised + (15:00:20, 12 December 2024)
- ML20132D485 + (15:00:21, 12 December 2024)
- ML20132D486 + (15:00:21, 12 December 2024)
- L-30-100, Rev 2 to Design Rept for Recirculation Sys Weld Overlay Repairs & Flaw Analysis at Brunswick Steam Electric Plant Unit 1 + (15:00:22, 12 December 2024)
- ML20132D481 + (15:00:23, 12 December 2024)
- ML20132D479 + (15:00:26, 12 December 2024)
- ML20132D477 + (15:00:27, 12 December 2024)
- ML20132D475 + (15:00:27, 12 December 2024)
- ML20132D474 + (15:00:28, 12 December 2024)
- ML20132D473 + (15:00:29, 12 December 2024)
- IR 05000454/1996007 + (15:00:30, 12 December 2024)
- ML20132D471 + (15:00:30, 12 December 2024)
- ML20132D469 + (15:00:31, 12 December 2024)
- ML20132D468 + (15:00:31, 12 December 2024)
- ML20132D466 + (15:00:32, 12 December 2024)
- ML20132D465 + (15:00:33, 12 December 2024)
- ML20132D464 + (15:00:34, 12 December 2024)
- ML20132D461 + (15:00:35, 12 December 2024)
- ML20132D462 + (15:00:35, 12 December 2024)
- ML20132D457 + (15:00:36, 12 December 2024)
- ML20132D460 + (15:00:36, 12 December 2024)
- ST-HL-AE-1344, Forwards Rev 3 to Design,Verification & Validation Plan for South Texas Project Qualified Display Processing Sys, Per 850701 Meeting + (15:00:37, 12 December 2024)
- ML20132D454 + (15:00:38, 12 December 2024)
- DCL-85-223, Informs That Tw Bishop 840419 Original Ltr & Attachments to Jd Schuyler Re Allegations Returned Under Separate Cover, Per Request.Return of Document Following Review Requested. Related Correspondence + (15:00:40, 12 December 2024)
- ML20132D453 + (15:00:40, 12 December 2024)