_ _- - . - .__

-

,

.

l

December 10, 1996

Mr. John K. Wood

, Vice President - Nuclear

!

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State - Route 2

Oak Harbor, OH 43449

SUBJECT: NRC INSPECTION REPORT NO. 50-346/96012(DRS)

Dear Mr. Wood:

On November 8,1996, the NRC completed a- ,pection at your Davis Besse Nuclear

Power Station. The enclosed report presents ti.e results of that inspection.

The pulpose of the inspection was to assess the licensed operator requalification program.

The inspection consisted of reviews of training administrative procedures, medical records,

,

requalification training attendance records, and requalification training materials. The

l inspection included observation of certified evaluators and licensed operators during

administration of the requalification examination. Additionally, interviews were conducted

with members of the operations and training staffs.

l It was determined the licensed operator requalification program was being implemented in

accordance with 10 CFR Part 55 requirements. The inspectors determined that adequate

training was being provided for ~y our licensed operators to operate the Davis Besse Nuclear

Power Station. The feedback process used to update the licensed operator requalification

training program was not completely implemented and was identified as a significant

weakness. Details of this weakness are in Section 05.4, Requalificatioc Training Program

Feedback System. This weakness should be addressed in an expeditious manner, as it is

an integral part of the Systematic Approach to Training (SAT) program used by your

training department to plan licensed operator training. No written response to this letter is

required concerning this weakness.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosed report will be placed in the NRC Public Document Room.

i

190020 r

\

\

'

9612190407 961210 g_ g

l PDR ADOCK 05000346

l 0 PDR

__ _ .- _ _ __ _ . - _ . _

, .

'

,

1

J. K. Wood -2- December 10, 1996

The NRC will gladly discuss any questions you may have concerning this inspection.

l Sincerely,

original signed by B. Clayton

Mor

Geoffrey E. Grant, Director

Division of Reactor Safety

l

Docket No. 50-346

Enclosure: NRC Inspection Report

No. 50-346/96012(DRS)

cc w/ encl: John P. Stetz, Senior

Vice President - Nuclear

J. H. Lash, Plant Manager

J. L. Freels, Manager,

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Distribution:

Docket Fileg/enci DRS w/ encl A. B. Beach, Rlli w/enct

PUBLIC IE-@rw/enct Rlli PRR w/enct Enf. Coordinator, Rlli w/ encl

OC/LFDCB w/enct SRI, Davis-Besse w/ encl CAA1 w/enct (E-mail)

DRP w/enct LPM, NRR w/enci W. L. Axelson, Rlll w/enci

M. Bies, Rlll w/enct S. Richards, HOLB w/ encl )

!

l

DOCUMENT NAME: G:\DAV96012.DRS l

To receive a copy of this document, Indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N" l

= No copy l

,

OFFICE Rlll N Rlll v Rlil 7 ~ 411 g 1

'

'

NAME DMcNeil:nh W MLeach pyjv4 JJacohsofi $t HClayton/GGrant

ji DATE 11/29/96 11/.tr /96 11M/q6 j / 1Uto/96

OFFICIAL RECORD COPYV U