December 10, 1996
Mr. John K. Wood
Vice President - Nuclear
,
!
Davis-Besse Nuclear Power Station
Centerior Service Company
5501 North State - Route 2
Oak Harbor, OH 43449
SUBJECT:
NRC INSPECTION REPORT NO. 50-346/96012(DRS)
Dear Mr. Wood:
On November 8,1996, the NRC completed a-
,pection at your Davis Besse Nuclear
Power Station. The enclosed report presents ti.e results of that inspection.
The pulpose of the inspection was to assess the licensed operator requalification program.
The inspection consisted of reviews of training administrative procedures, medical records,
requalification training attendance records, and requalification training materials. The
,
l
inspection included observation of certified evaluators and licensed operators during
administration of the requalification examination. Additionally, interviews were conducted
with members of the operations and training staffs.
l
It was determined the licensed operator requalification program was being implemented in
accordance with 10 CFR Part 55 requirements. The inspectors determined that adequate
training was being provided for ~ our licensed operators to operate the Davis Besse Nuclear
y
Power Station. The feedback process used to update the licensed operator requalification
training program was not completely implemented and was identified as a significant
weakness. Details of this weakness are in Section 05.4, Requalificatioc Training Program
Feedback System. This weakness should be addressed in an expeditious manner, as it is
an integral part of the Systematic Approach to Training (SAT) program used by your
training department to plan licensed operator training. No written response to this letter is
required concerning this weakness.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
and the enclosed report will be placed in the NRC Public Document Room.
i
190020
r
\\
\\
9612190407 961210
'
g_ g
l
ADOCK 05000346
l
0
__
_ .-
_
_
__
_ . - _ . _
,
.
'
,
1
J. K. Wood
-2-
December 10, 1996
The NRC will gladly discuss any questions you may have concerning this inspection.
l
Sincerely,
original signed by B. ClaytonMor
Geoffrey E. Grant, Director
Division of Reactor Safety
l
Docket No. 50-346
Enclosure:
NRC Inspection Report
No. 50-346/96012(DRS)
cc w/ encl:
John P. Stetz, Senior
Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager,
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio
Public Utilities Commission
Distribution:
Docket Fileg/enci
DRS w/ encl
A. B. Beach, Rlli w/enct
PUBLIC IE-@rw/enct
Rlli PRR w/enct
Enf. Coordinator, Rlli w/ encl
OC/LFDCB w/enct
SRI, Davis-Besse w/ encl
CAA1 w/enct (E-mail)
DRP w/enct
LPM, NRR w/enci
W. L. Axelson, Rlll w/enci
M. Bies, Rlll w/enct
S. Richards, HOLB w/ encl
)
DOCUMENT NAME: G:\\DAV96012.DRS
To receive a copy of this document, Indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N"
l
= No copy
411
g
1
OFFICE
Rlll
N
Rlll
v
Rlil
7 ~
,
'
'
NAME
DMcNeil:nh W
MLeach pyjv4
JJacohsofi $t
HClayton/GGrant
ji DATE
11/29/96
11/.tr /96
11M/q6
/
1Uto/96
j
OFFICIAL RECORD COPYV U
l -
-
.