Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133H116 + (13:10:49, 12 December 2024)
- IR 05000295/1985033 + (13:10:50, 12 December 2024)
- ML20133H113 + (13:10:51, 12 December 2024)
- ML20133H112 + (13:10:52, 12 December 2024)
- ML20133H111 + (13:10:53, 12 December 2024)
- ML20133H104 + (13:10:54, 12 December 2024)
- ML20133H107 + (13:10:54, 12 December 2024)
- ML20133H103 + (13:10:55, 12 December 2024)
- IR 05000295/1985035 + (13:10:56, 12 December 2024)
- ML20133H098 + (13:10:56, 12 December 2024)
- ML20133H094 + (13:10:57, 12 December 2024)
- ML20133H093 + (13:10:58, 12 December 2024)
- 05000369/LER-1985-007-03, :on 850205,two ESF Actuations Occurred During Work on Reactor Protection & Nuclear Instrumentation Sys Channels.Caused by Procedures Allowing Simultaneous Sys Work.Procedures Revised + (13:11:00, 12 December 2024)
- ML20133H088 + (13:11:01, 12 December 2024)
- ML20133H090 + (13:11:01, 12 December 2024)
- ML20133H087 + (13:11:02, 12 December 2024)
- ML20133H085 + (13:11:02, 12 December 2024)
- ML20133H084 + (13:11:03, 12 December 2024)
- ML20133H083 + (13:11:04, 12 December 2024)
- ML20133H082 + (13:11:05, 12 December 2024)
- W3P85-1413, Forwards Response to NRC Re Enforcement Action 85-10 Concerning Failure to Perform Hydrostatic Test Per Fsar.Corrective Actions:Field Change Request Initiated on 800806 to Cover Deletion of Use of High Point Vents + (13:11:06, 12 December 2024)
- ML20133H074 + (13:11:07, 12 December 2024)
- ML20133H073 + (13:11:07, 12 December 2024)
- PM-85-102, Monthly Operating Rept for May 1985 + (13:11:09, 12 December 2024)
- ML20133H071 + (13:11:09, 12 December 2024)
- ML20133H068 + (13:11:10, 12 December 2024)
- 0CAN048510, Reissues Response to 841207 Request for Addl Info Re Util Response to Generic Ltr 83-28.Author 850408 Amend 1 to Generic Ltr 83-28 Response,Per B&W Owners Group Activities, Applicable to Util + (13:11:11, 12 December 2024)
- ML20133H065 + (13:11:11, 12 December 2024)
- ML20133H059 + (13:11:13, 12 December 2024)
- ML20133H061 + (13:11:13, 12 December 2024)
- ML20133H057 + (13:11:14, 12 December 2024)
- ML20133H056 + (13:11:14, 12 December 2024)
- ML20133H055 + (13:11:16, 12 December 2024)
- ML20133H053 + (13:11:16, 12 December 2024)
- ML20133H052 + (13:11:17, 12 December 2024)
- ML20133H051 + (13:11:17, 12 December 2024)
- ML20133H048 + (13:11:18, 12 December 2024)
- ML20133H046 + (13:11:19, 12 December 2024)
- ML20133H044 + (13:11:20, 12 December 2024)
- ML20133H043 + (13:11:21, 12 December 2024)
- L-85-235, Monthly Operating Repts for May 1985 + (13:11:22, 12 December 2024)
- 05000322/LER-1985-024, :on 850713,reactor Scrammed on Low Water Level During Securing of Condensate Booster Pump After Min Flow Control Valve Failed Shut.Valve Failure Caused by Sheared Instrument Air Line.Line Repaired + (13:11:24, 12 December 2024)
- PNO-V-85-071, on 851007,one of Two Auxiliary Feedwater Pumps Declared Inoperable Due to Failure of Pump Thrust Bearing. Caused by Disintegrated Thrust Bearing Due to Inadequate Lubrication.Bearing Replaced + (13:11:25, 12 December 2024)
- ML20133H034 + (13:11:26, 12 December 2024)
- PNO-V-85-070, on 851008,two Plant Mod Personnel Received First & Second Degree Burns on Hands & Arms Due to Fire in Motor Control Ctr.Caused by Short Circuiting of Bus Bar by hand-held Cordless Drill + (13:11:26, 12 December 2024)
- ML20133H030 + (13:11:27, 12 December 2024)
- ML20133H029 + (13:11:28, 12 December 2024)
- IR 05000440/1985060 + (13:11:30, 12 December 2024)
- ML20133H027 + (13:11:30, 12 December 2024)
- ML20133H026 + (13:11:31, 12 December 2024)
- ML20133H023 + (13:11:31, 12 December 2024)