Text
Q .S
'
g\\
e
-
'
OCT i 01985
/
.
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
I
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and others
i
of this office on September 24-26, 1985, of activities at the Perry Nuclear Power
'
Plant authorized by NRC Construction Permits No. CPPR-148 and No. CPPR-149 and to
the discussion of our findings with Mr. F. Stead and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
The attached Appendix contains the two remaining Open Items that need to be
closed prior to fuel load.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
64 -
8510160232 851010
8-
ADOCK 05000440
W. D. Sh er, Chi f
G
Radiological Protection Branch
Enclosures:
1.
Appendix, Emergency
Preparedness Open Items
2.
Inspection Reports
No. 50-440/85060(DRSS);
No. 50-441/85022(DRSS)
.
l
See Attached List For Distribution
l
.
.
The Cleveland Electric Illuminating
2
OCT 101995
Company
Distribution
cc w/ enclosures:
J. J. Waldron, Manager, Perry
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
W. Weaver, FEMA, Region V
D. Mathews, EPB, OIE
RIII
I
RIII'd#
I
RII
R
A
W
b
T
rson
illiamsen
P
lips
Knop
p
er
.
.
Appendix
Emergency Preparedness Open Items
The following Open Items are required to be completed prior to fuel load.
Each
of these items are new items which have been established to facilitate the tracking
of the uncompleted portions of Open Items No. 440/85009-04; 441/85007-04 and
440/85009-05; 441/85007-05 which have been closed.
1.
Complete the testing and acceptance of the HVAC and radiation monitoring
system for the Technical Support Center.
(0 pen Item No. 440/85060-01)
2.
Complete the testing and acceptance of the HVAC and radiation monitoring
system for the Emergency Operations Facility.
(0 pen Item No. 440/85060-02)
i