Forwards Safety Insp Repts 50-440/85-60 & 50-441/85-22 on 850924-26.No Violations Noted.App Contains Two Remaining Emergency Preparedness Open Items That Need Closing Prior to Fuel Load
ML20133H023
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/10/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20133H025 List:
References
NUDOCS 8510160232
Download: ML20133H023 (3)


See also: IR 05000440/1985060

Text

'

Q .S

-

g\ '

e

OCT i 01985 /

.

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000 I

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Snell and others i

of this office on September 24-26, 1985, of activities at the Perry Nuclear Power '

Plant authorized by NRC Construction Permits No. CPPR-148 and No. CPPR-149 and to

the discussion of our findings with Mr. F. Stead and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

The attached Appendix contains the two remaining Open Items that need to be

closed prior to fuel load.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

64 -

8510160232 851010 W. D. Sh er, Chi f

8-

PDR ADOCK 05000440

G PDR Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Appendix, Emergency

Preparedness Open Items

2. Inspection Reports

No. 50-440/85060(DRSS);

No. 50-441/85022(DRSS) .

l

l

See Attached List For Distribution

.

.

The Cleveland Electric Illuminating 2

Company OCT 101995

Distribution

cc w/ enclosures:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kchn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

W. Weaver, FEMA, Region V

D. Mathews, EPB, OIE

RIII I RIII'd# I RII R

A W b

T rson illiamsen P lips Knop p er

.

.

Appendix

Emergency Preparedness Open Items

The following Open Items are required to be completed prior to fuel load. Each

of these items are new items which have been established to facilitate the tracking

of the uncompleted portions of Open Items No. 440/85009-04; 441/85007-04 and

440/85009-05; 441/85007-05 which have been closed.

1. Complete the testing and acceptance of the HVAC and radiation monitoring

system for the Technical Support Center. (0 pen Item No. 440/85060-01)

2. Complete the testing and acceptance of the HVAC and radiation monitoring

system for the Emergency Operations Facility. (0 pen Item No. 440/85060-02)

i

i