ML20133H044

From kanterella
Jump to navigation Jump to search

Forwards Description of Changes to Radiological Contingency & Emergency Plan
ML20133H044
Person / Time
Site: 07001113
Issue date: 12/31/1996
From: Reda R
GENERAL ELECTRIC CO.
To: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
TAC-L30933, NUDOCS 9701170030
Download: ML20133H044 (2)


Text

k

-g 70 /// 3 s.

thrhy GE Nuc a b,t f

t g

o

/( ' i v

0 December 31,1996 Mr. M. F. Weber, Licensing Branch NMSS U.S. Nuclear Regulatory Commission Mail Stop T8-D-14 Washington, DC 20555-0001

Subject:

RC & EP Description of Changes Ref:

(1) NRC License SNM-1097, Docket 70-1113 (2) Docket 70-1113 (3) Submittal, R.J. Reda to M.F. Weber, 12/17/96

Dear Mr. Weber:

Enclosed as Attachment 1 is a description of the changes made to our 12/17/96 submittal to the Radiological Contingency and Emergency Plan (RC & EP). The description of changes are provided by page and section. As described in the cover letter of our submittal, all changes are identified with an asterisk (*) in the right hand column of each page.

Please contact Bob Keenan on (910)675-6644 or me on (910)S75-5889 if you have any questions regarding this letter.

Sincerely, GE NUCLEAR ENERGY

-:nWJ

&^

g 16005G aaiph J. Reda, Manager g

Fuels & Facility L! censing Attachment I

h cc:

RJR-96-144 9701170030 961231 PDR ADOCK 07001113 C

PDR

.g/ g Mr. M.F. W:ber December 31,1996

, Page 1 of 1*

ATTACHMENT 1 DESCRIPTION OF CHANGES Page Section Description I thru 6 Update of Revisions by section 1.3 1.1.2 (5)

Update possession limit to agree with SNM-1097 1.3 1.1.4 Add Dry Conversion Process (DCP) to processing operation description 1.7 Figure 1.1 Updated site drawing showing DCP, Shipping Warehouse, HF facility and Aircraft Expansions 1.9,1,11, 1.2.4, Figures 1.2,1.3, & l.4 Updated descriptions and drawings showing addition of DCP 1.12,1.13 and Shipping Warehouse 1.15 Table 1.1 Updated listing of bulk chemical storage / usage 1.17 to 1.20 1.2.10.2 thru 1.2.10.5 Added description of DCP and clanfied descriptions to Pre-Treatment and Pellet Production 1.28 1.2.11.5 Grammar correction 1.30 Figure 1.7 Updated map of state and counties 2.8 2.1.3.5 Updated reference for HF permissible limits 2.13 2.1.5 Added refetence to most current Environmental Report 2.15, 5.14, 2.2.2, 5.3.4.2, 5.3.4.5 Change name of alarm system from Autocall to Emergency 5.15 Ahtrm System (Autocall equipment replaced) 2.19, 6.8 Exhibits 2.3 & 6.3 Updated fonn for emergency vehicle checklist 3.11 3.3 Updated NRC form number to one used 4.3 Table 4.2 Updated organizational chart 4.6 Table 4.3 Updated Emergency Organization chart and titles 4.10 Table 4.4 Updated Emergency Assignments and titles to include Emergency Response Team (ERT) and EMT's 5.1 Table 5.1 Updated Notification Mechanism descriptions 5.9 5.3.2 Clarified description of sprinkler installations 3.11 & 5.12 Figures 5.1 & 5.2 Updated map and drawing of Controlled Access Area and the ECC 5.13 5.3.4 Updated description of generator capacity 5.16 5.3.7 Removed description of Propane tanks since they no longer exist and renumbered subsequent sections 5.20 5.3.11 Reword statement 5.24 5.3.15.2.1 Changed Radiation waste to Rad Waste for clarification and updated process discharge descriptions 5.28 Figure 5.3 Updated drawing of Fire Protection System to include DCP and Shipping Warehouse 5.31 5.4.1.1 Removed statement on building search teams since this responsibility has been changed to ERT 5.32 Table 5.4 Updated Alert mode and decision made by director 5.33 5.4.1.2 Updated facility descriptions and clarified equipment available 6.3 6.2.2.1 Updated descriptions of cellular phone use 7.4 Table 7.1 Removed words "..at all times" fcom statement on first aid training. Trained EMT's are on site most of the time and local EMS is used as the primary responder to life threatening emergencies.

7.9 & 7.10 7.6 and Table 7.3 Updated organization responsible for checks of emergency equipment.

D.1 thru Appendix D Updated examples of emergency procedures D.23

-