PM-85-102, Monthly Operating Rept for May 1985
| ML20133H070 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 05/31/1985 |
| From: | Kelly D, Steiger W LONG ISLAND LIGHTING CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PM-85-102, NUDOCS 8508090174 | |
| Download: ML20133H070 (4) | |
Text
.
Appendix 12.6 SHOREHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-322 UNIT 1
DATE 6/5/85 g
COMPLETED BYD. Kelly TELEPHONE (516)929-8300 MONTH May 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
19 0
3 0
4 0
20 0
21 0
5 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
28 0
12 0
29 0
13 o
30 0
14 o
15 31 0
o 16 0
SPF 51.005.01-5, Rev. O SP 51.005.01 Rev. I g
Page 18 qf/
8508090174 850531 V.
R
e 1
J APPandix 12,7 SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET NO. 50-322 UNIT 1
DATE 6/5/85 t
COMPLETED BY D. Kelly TELEPHONE (516) 929-8300 OPERATING STATUS 1.
Reporting Period: 5185 Gross Hours in Reporting Period 0
2.
Currently Authorized Power Level (MWt): 0.024 Max. Depend. Capacity (MWe-Net):ano Design Electrical Rating (MWe-Net): 844 3.
Power Level to which Restricted (if any) (MWe-Net):
N/A 4.
Reasons for Restriction (if any):
This month Yr to Date Cumulative 5.
Number of Hours Reactor was Critical..........
0 0
0 6.
Reactor Reserve Shutdcon Hours................
0 0
0 7.
Hours Generator on Line.......................
0 0
0 8.
Unit Re s e rve Shut d own Hours...................
0 0
0 9.
Gros s The rmal Ene rgy Generated (MWH)..........
n 0
0
- 10. Gross Electrical Energy Generated (MWH).......
0 0
0
- 11. Net Electrical Energy Generated (MWH).........
0 0
n
- 12. Re a c t o r Se rvi c e Fa c to r........................
N/A
- 13. Reactor Availability Factor...................
N/A
- 14. Unit Service Factor...........................
N/A
- 15. Unit Availability Factor......................
N/A
- 16. Unit Capacity Factor (Us ing MDC)..............
N/A
- 17. Unit Capacity Factor (Using Design MWe).......
N/A
- 18. Unit Forced Outage Rate.......................
N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, And Duration of Each):
- 20. If Shut Down at end of Report Period, Estimated Date of Startup: 6/14/9s
- 21. Units in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 8/1/85 COMMERCIAL OPERATION 10/1/85 SPF 51 005.01-6, Rev. O SP 51.005.01 Rev. I Page 19
I Appendix 12.8 S110REllAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-322 UNIT NAME 1
q DATE 6/5/85 COMPLETED BY D.
Kelly TELEPHONE (516) 929-8300 REPORT MONTH 5/85 METHOD OF TYPE SiluTTING DOWN F: FORCED DURATION Tile REACTOR OR NO.
DATE S: SCllEDULED (Il0URS)
REASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS / COMMENTS NCNE Control Rod Drive orifice replacement was completed this month.
The Teflon Inlet Scram 'laive Seats were changed with seats of a SURMARY*
terial. Planning on commencing training startups SP 51 995.91 Rev. 1 0
SPF51995N17 R
.9 on 5/10/85 Page 20
u L
p mv, m em <r w ens k eg Eg LONG ISLAND LIGHTING COM PANY SHOREH AM NUCLE AR POWER ST ATION
- P.O. BOX 628 + W ADING RIVE R. NEW YORK 11792
.,~ e mt& e %_au:w..~n w u TE L. (516) 929 8300 June 10, 1985 PM-85-102 Director, Office of Resource Management U. S.
Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
In accordance with Technical Specifications Section 6.9.1.8, enclosed is a
copy of the Shoreham Nuclear Power Station May Monthly Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
Very truly
- ours, W. E.
Stei er, Jr.
Plant Manager WES/km Enclosure cc:
Dr. Thomas Murley, Regional Administrator P.
Ese,lgroth, Senior Resident Inspector Institute of Nuclear Power Operations, Records Center Americ'an Nuclear Insurers SR-A43.700 r E 2-4 FC 8682.2
- I o J