MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
.;
N.R.C. OPER6 TING DATA FEFORT DOO ET .E . J O 1 ]
OATE 6'~ ~3 3 CONF ui-'I ED En Ci_ Ii1E R TELEPHONr~ 616-463-5901 OPERAl~iha ::. i H : U5
- 1. !!n1 t Namn D. C. Cook Unit 1 - - - - - - - - - - ^ - - - - - - - -
7 Reporti.no Feriod Ha a5 ; r.c t e c ,
3 t.icensed Thermal F'ow e r (NWt) 3:50 .
- 4. Name Plate Rattno (Gross fh) 1157 . ;
S. Desagn Electr2 cal Rati nq (het MWe) 1030 '
- 6. Meimum Dependanto Capactly (GROSS MWe) LO3e l ,
- 7. Masimum Dependante Capaci ty Glet NLm ) [020 - - - - - - - - - - - - - - - - - - - -
O. If Change: Occur in CanaciEv Rating.. ( I t a m'.- no. '
thraeJh 7' Since L w_; t, Repcct Gtwe ima s c o s . _... _ _ _ _ . _. _ _ _ _ _ _ . . _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . .,
- 9. Power Level To Which Rentricted. If Any Giet MWe) _ _ _ _ _ _ _ _ , _ _ _ _ . , . . _ _ _ _
- 10. Reasons For Restrict.iorm If An y : ____ _ _. . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . . _ _ _ _ _ _
This Mo. Yr. ta Date Cuma. .
I1. Hourn in Reccrtiog Pn i c.:d 744.O 3623.O 91295.O
- 12. No. of Hrs. Reactor Was Critical O.O 1868.0 67 % i.8
- 11. Reacter Rewrv. S h u 1.d a w n Hour s O.O O.O 463.O
- 14. Hours Eenorator an Linu <>.0 1856.2 66217 7
- 15. Ucii t Re.er.e Shutdown Hours 0.0 0.0 ~21.0
- 16. Gran rherm. Ei ser yy Gun. (MWH) O 5418521 1CDG6025
- 17. Gr a w Elect. Energy Gen. (MWH) 0 1761840 63533730
- 10. Not El ec t . Enerqv Gen. (HWH) 0 16G4853 61125943
- 19. Unit Nrvtce Factor O.O 31,2 74.2 20 Un; t Avat1ab21iL' Factor O.O 31.? 74.2
- 9. t Unit C ap a c i. t u Factor (MDC Net) 0.i 45. ') -
67.2
??. Unit capacity Factar (DER Net) O.O 45,4 64.6 23 Unit Forced Outuae Rate 0.0 0.0 7.2
- 24. Shutdowns Schnduled over Nant Gi: Months (Type.Dete,and Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Star Lup:
Unit shut down for 10 yr outage-Estimated ntartup Aug 07, 1985
- 26. Units in Test Status (Petar to Commercial Operaticn):
Forcast Achieved INITIAL CRITICALITY
[ NIT!AL ELECT 6ICITY COMMERCIAL OPERATION 8508090175 850607 PDR ADOCK 05000315 R PDR l
f._..___.._.__
i i
l 1
! AVERAGE DAILY FOWER LEVEL ': MWe-Ne t )
l j
E DCCVET NO. 50-315 4 UNIT ONE a
l DATE 6/2/85 i COMPLETED BY CLIMER TELEPHONE 616-465-5901 l
t MONTH May 85
' AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL e
{ 1 O 17 0 2 0 la 0 3 0 19 0 4 0 20 0 !
5 0 21 O l 6 0 22 0 7 0 23 0
]
8 0 24 0 J
1 9 0 25 0
!e 10 0 26 0 ;
i 11 0 27 0 '
i 12 0 28 0
', 13 0 29 0 ,
- 14 0 30 0
! 15 0 31 O f
! 16 0 l 1
l l
1 i
b P
s I
ww . - . - - - - - mm . .
a t
50-315 . .
DOCKET NO.
iJNIT Salt 1IDOWNS AND POWElt HElbtMTIONS UNIT N AME D.C. Cook, Unit 1 DATE 6-7-85 COMPLETED lay B.A. Svensson May, 1985 616/465-5901 HLPORT MONiil TEI.EPilONE e.
'h t. Cause & renieceive
-, .$ E ) h _t I itensec E s,,
Atla.m su N e. Date 3, H@ @ 2s$ livene Ey 93D
$ Mcgunt # de'D Psevent Hcciusen(c F
o 246 850406 S 744 B&C Z N.A. ZZ ZZZZZZ The Unit was removed from service on 850406 for the scheduled Ten-Year ISI and Cycle VIII - IX Refueling Outage. The core is presently un-loaded and the control rod guide tube replacement is in progress. Estima-ted return to service date is 850807.
I J .) l 1:: 12.nceil Heason: Meiluiti: Exlubit G -Instnectionis S: Solic.lule.1 A li mpmer.: I;ailuse (Laptain) i Manual fin Psepasation of I)ata i Entsy Slicces (os I.icensee Il Maintenance or Tesi 2 Manual Sesam.
C Hefueling .1 Automaine Steam. I! vent Hepint 11 l'HI file INtlHi&
l} Hcgulatoiy Hesinicli m -l Ollies (lixplain) O t til )
I Opcianos l~sainmg a liccuse I mamination 1;.Ailnunisesansve 5 G Opes.assimal I.ison Ilixplain) 1:xinbit I - S.ime Sonice p8/11) II Ollies Ilisplain)
UNIT SHL"TDOWNS AND POWER REDUCTIONS INSTRUCTIONS This report should desenbe 2!! plant shutdowns dunng de a 2:cordance atth the t2:le 2pecanng :n the report form.
resort penod. [n addition. tt should be the source of explan- If category a must be used.suppiy or:ef:omments.
atton of ugmncant d:ps m 2verage power leveis. Each uznt-ricant redu:non m power level (greater than 20% reduction LICENSEE EVENT REPORT :. Reference the applicable m average daily power level for the preceding 4 houn) repor* sole oc:urrence pertsamg to the outage or power could be noted, even though de umt may not have been reduct:en. Enter the : int four pans (event year, sequennai shut down completelyl , For such reductocs in power level, report numoet, oc:urrence =de 2nd report type) of the tive tne duranon shoald be listed as zero, the method of reducuon part dengnation as desenbec in item 17 of Instruet:ons for should be listed as 4 (Other) 2nd de Csuse and Correenve Pre:2ranon of Dats Entry Sheets for L:censee Event Report Acnon to Prevent Re:urrence column should explain. The (LER) Fue (NUREG 016!). T5us infor=2non may not be Cause 2nd Corre:nve Acnon to Prevent Recurrence colurnn immediately evtdent for all such shutdowns. uf coune, smee should be used to provide any needed explanation to fully further mvestganon m2y be reou: red to ascertam whetner er desenbe the c:rcumstances of the outage or ;cwer reducnon. not a reportseie occurrence was involved.) If the outage or power reduction wtil not result ;n 2 report 2eie oc:urren:e.
NUMBER. T5 us column should indinte the sequennal num, the positive indicanon of this !:ck of correisuon should be ber assigned to each shutdown orsigmticant reducuan m power noted as not applicable (N/A).
for that eslendar ye:r. When a shutdown or ngmncsnt power SYSTEM CODE. The system in wru:n the outage or power reduenon beens m one recort pened 2nd ends m another.
an entry should be made for born report penods to ce sure '_educu n ongmated mould be noted Jy de two pg:t gode or.
31 shutdowns or siamncant power reduenons are reported. '"mit G . Instrucnons tor Preparsnon of Data untry sneets Untd 2 unit 5:s 2:fEeved its fint power gener: tion, no num- for Lcensee tun Report ILER) File GUREC4161).
ber snould be assigned to es:n entry. Systems that do not fit any existmg =de should be denp2 ted XX. The :oce ZZ snould be used for tnose events where DATE. This column should adteste the date of the start s system ts not spea: sole.
of esen shutdown or sigm!! cant power reduenon. Report as ye:r. month. 2nd day. August 14.197~ would be reported COMPONENT CODE. Seie:t de most acorepnate .om;unent as ~~0314. When a shutdown or signifiant power reducnon from Ex!ubit I Instrucnons for Pre =2 anon of Data Ent.m begms m ene report pened and ends m another, an entry shotdd Sheets for Licensee Event Report (LER) Fde GUREC41615.
be made for both report penods to be sure all shutdown: usmg tne foilowmg cnuena:
or s:gruncant power reducuans 2re reported.
TYPE. Lse "F" or "S" to indicate etther "For:ed" or "Sene-Juled." respe:nveiy. for each snutcown or sipzilcant power 3. If not 2 am:anent fadure. use de reisted .:omponent.
redugnon. Forceo shutdowns include dose required to be e.g.. wrong valve operated througn errort list vuve as minated by no la:et than the weekend followmg discovery comoonent.
of 2n off. normal condinon. It is recoptzed that some judg-ment is required in :stegonnns shutdowns in th:s way, in C. If a dam of fulures occurs. the tint component to n2i-general. 2 forced snutdown is one that would not have been fun:non should be listed. The secuence of events.memd.
completed in the absence of de =nditton for wruch corteente mg the other components wh:1 fad. snould :e des:nbec acnon was taken. under the Cause and Correcuve Acnon to ?revent Recut-rence column.
DURATION. Selfaxplanatory. When 2 shutdown extends
. Comeonents tnat do not nt any enstmg : ode should ce de.
.:'eyonc the end of a report pened. count only the t:me to the end or the report penoc and pick un the ensumg down time uMRERh2 N M'xMb events where a component denpat:en is not 2cpucsele.
m the foilowmg recort penods. Report dursuon of outages r;Junded tu the nearest tenth of 2n hour to f2Cditate sdmr 211on. CAUSE & CORRECTIVE ACTION TO PREVENT RECUR.
ihe sum of the total aut2ge huurs :tus the hours the geners-tar was an line dould equal the gross hours a tne reporting RENCE. Uw 5 dum m a enve (en m wh a expism the arcumstarces of tne shutdown or power reduct:en.
P'30"- The =lumn shou!d incluce the seecne :suse for each shut.
down or sipitlant power reducnon and the immediate anc REASON. Caterome m ,.e tter Jemnanun m accordance ontemetated :vng term correcove scnon taxen. if 2= preen.
with the taoie aceeanny un rne recort form. If :stegory H must he used, suoci) Unet ;urnments.
ate. Th:s alumn should also be usec for a desenet:en of tne mator safety related corteenve mamtenance performec funna
\lETHOD OF SHUTTING D0%N THE REACTOR GR ** #"'*I' 4' E *" "d"*"U" ***d*I3" **""0""C" M REDUCING P0%ER. Cateponze ey numner ceszpstion me .nnd pam aeMty sec 2 re- n at any smga messe a esdiosermty or anzie radianon exeosure mee:ticily asse :.
l%e that this difrers trom the Edison Eleutn: Insuture ated wuS the eur:se wruct: 2ccountt for mere tnw :0 :er.ent
' EEI) Jenanons or " Forced P2 mal Out2:e" 2r.c "Sene. af the dowsoie :nnuai valaes
- uied Parnal OutageJ For these terms.1 El uses a aange at For :eng textual reeorts contmue narrative an ie:2r:te acer
- \lW as the been pmnt. For iarger :'uwer resetors. 30 MW
.0 .na :eteren e n:e shurcewn or power ecu.aun no a s ti . imah a .nange to wanaat notanation. a;.rranve.
g a **
~ ~
. Docket No.: 50-315 Unit Name: D.C. Cook Unit 1 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: June 10, 1985 Page: 1 of 1 MONTHLY OPERATING ACTIVITIES - MAY, 1985 HIGHLIGHTS:
The reporting period began with the reactor vessel closure head removed. At 0910 on 5-02-85, the upper reactor internals were removed and at 0635 on 5-03-85, tuel movement from the reactor vessel to the spent fuel pool was begun. The core was fully unloaded by 0750 on 5-07-85. The reporting period ended with the core tully unloaded.
There was no electrical generation in the month of May.
Summary:
5-02-85 At 0910, reactor internals were removed from core and placed in storage.
5-14-85 At 1338, an Unusual Event was declared due to a hydrazine leak in the #1 and #4 Feedwater Gallery. At 1850, the Unusual Event was terminated.
5-23-85 At 0922, the Control Room Cable Vault Halon System was actuated. It was caused by grinding in the area. All personnel were evacuated.
The Unit 1 Control Room Cable Vault Halon System was inoperable as of 1400 on 4-05-83. The backup CO system for the Control 2
Room Cable Vault remains operable.
DOCKET NO. 50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE 6-7-85 COMPLETED BY B. A. Svensson MAJOR SAFETY-RELATED MAINTENANCE MAY, 1985 M-1 Corrected leak-by condition on Valve 1-FW-181 feedwater line drain valve at containment penetration, by machining new seating surfaces on valve body and plug. Valve was repacked and returned to service.
M-2 Removed hand-hole covers and tube-lane blocking devices from steam generators 11, 12, 13 and 14. Repaired welded undercut on welds made on split plates and 3/8" blocks. Welds were inspected by Q.C.
M-3 Ground out and repaired cracks in cladding on east centrifugal charg-ing pump. Welds were inspected by Q.C.
M-4 Replaced valve bonnet on the isolation valve to PPP-303 transmitter.
Valve was retested for operability.
M-5 Replaced SI-126, seal welded bonnet Rockwell check valve with a Con-val clamp seal check valve.
M-6 Replaced bearing on lower containment access outer door. Door was inspected following repairs.
M-7 Replaced bonnet assemblies on CS-359 and CS-360, seal water filter drain valves. Adjusted travel stops as required.
M-8 Replaced diaphragms on the following valves: CS-357, seal water re-turn filter inlet; CS-361, seal water return filter outlet and CS-356, seal water return filter bypass.
M-9 Replaced body-to-bonnet gasket on 1-RH-104E. Also added 4 rings of packing to 'E' RHR pump suction from recirculating sump.
M .1 0 Repaired XRV-228 and found piece of metal in seat of valve. Lapped seat and tested good, XRV-228 is pressure regulator for 1-CD Diesel Turbo Charger.
M-11 On 1-CD Diesel Generator, disassembled 3-way temperature control valves in lube oil and jacket water coolers. Installed new thermo-stats and 0-rings.
M-12 Due to excessive leakage; replaced packing, body-to-bonnet gasket, and trim assembly on QRV-303. Three-way valve on inlet of volume control tank was retested for oper. ability.
M-13 CCW-180W, Inlet to "W" RHR Heat Exchanger could not be isolated during ISI hydro. Installed new valve after removal of old valve showed that seat needed replacing.