FOIA Request for 35 Categories of Documents,Including Oreilly/Vaughan ,Attachment a to GE License SNM-1097 Condition 9,attachment to Vaughan/Stohr & Insp Rept 82-07
ML20133H055
Person / Time
Site: 07001113
Issue date: 03/07/1985
From: Ratner M
RATNER, M.G.
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-85-158 NUDOCS 8508090168
Download: ML20133H055 (4)


Text

F' L

u j

/

L AW OFFICES MOZART G. RATNER, P. C.

1900 M STR E ET, N. W.

SUITE 610 WASHI NGTON. D. C. 2 003 6 AREA CODE 202 223-9472 March 7, 1985 FREEDOM OF INFORMATION Mr. Joseph Felton, Director ACT REQUEST Division of Rules and Records Office of Administration Fora-BS- /58 U.S. Nuclear Regulatory Commission Washington, D. C.

20555 ne.c/0 03/06/fW SUPPLEMENTAL REQUEST Vera M.

English, by her undersigned counsel, hereby supplements her " Request for Production of Documents Pursuant to 10 CFR S 2.790(6) and Request for Commission Declassification Under Part 9, App. 2 (10 CFR 195-19G)," dated February 25, 1985, by the following items:

1.

Letter from O'Reilly to Vaughan, dated 7/30/84 reporting summary of "our meeting in Atlanta," referred to in Vaughan to O'Reilly letter of 10/29/84.

2.

Attachment A to G.E.'s License Condition No. 9 (G.E. Lic.

SNM-1097).

3.

Attachment to Vaughan to Stohr letter of 6/7/84, pertaining to items of apparent non-compliance with NRC requirements.

4.

Attachments 1 and 2 referred to in 6/15/84 Vaughan to O'Reilly letter.

5.

Appendix A referred to in Gibson to Long letter of 11/4/81, re: 70-1113/81-14.

6.

Inspection Report 82-07, referred to in 4/8/82 letter from Gibson to Long.

7.

Inspection Report 81-14 referred to in 4/2/82 letter from Olshinski to Long.

8.

Inspection Report 82-09 referred to in 4/13/82 letter from Gibson to Long.

(McAlpine signed the above-referenced letter for son.)

.er 8508090168 850307 PDR FOIA RATNER 85-158 PDR J

J Mr. Joseph Felton March 7, 1985 Page 2 9.

Information submitted pursuant to 9/17/84 letter from Biddinger to Vaughan.

10. Inspection Report 84-11, dated I'0/8/84, referred to in Vaughan to O'Reilly letter of 11/15/84 and response thereto, dated 12/9/84.
11. All records of changes in facilities and procedures in the Chemet Laboratory from January 1, 1982 to March 15, 1985, filed with Region II, pursuant to 10 CFR S 50.59(b).
12. General Electric Company's Revised License Application pages dated 6/20/84, revising its 7/25/83 License Application - Chapter I - 3.6 to 3.7.
13. Ibid.

I-5.15, I-5.9 to 5.13.

14. Ibid.

I-3.1, I-3.4, I-4.1, I-4.4.

15. Standard Format & Content for Radiological Contingency Plans for Fuel Cycle & Materials Facilities, NUREG-0762, referred to in 12/31/81 Fisher to Vaughan letter.
16. Standard Review Plan for the review of Radiological Contingency Plans for Fuel Cycle & Material Facilities, NUREG-0810, referred to in letter referenced in Item 7, above.
17. Report submitted to Fuel Facilities Safeguards and Licensing Branch pertaining to Fundamental Nuclear Control Plan, discussing the investigation and resolution of the discrepancies between 1983 and 1984 factors for six material categories.

18.

G.E.

License Condition 2.1 of Amendment MPP-3, referred to in 9/28/84 letter from Brown to Vaughan about revision of License Condition 2.1.

19. Update of " Criticality" Emergency Procedure effective 12/26/83 and referred to in 9/25/84 memorandum from Terry to Crow.
20. ANSI ANS-8.1-1983, described in request for additional information for UPMP Amendment Application dated June 1, 1984 and attached to Biddinger to Vaughan letter of 9/14/84.

1

/

Mr. Joseph Felton March 7, 1985 Page 3

21. Plant Procedure (P/P) Calibration and Operation Instruction (COI) 6, Rev.

1, Control of Samples in Chemet Lab, referred to in 70-1113-Inspection Report 84/17, p.

4, paragraph d.

22. Nuclear Safety Release 6.1.0. - Radiology Safety Regulations for Chemet Lab, original and all revisions, including Rev. 4 (ibid., p.

4, 1 d).

23. Plant Procedure Nuclear Safety Instruction 0-6.0 and all revisions, including Rev. 14 (ibid., p.

5, 1 f).

24. G.E.'s Chemical Metallurgical and Spectrochemical Laboratory Manual, Rev. 5, 3/25/82 (ibid., p.

8,1 j ).

25. Plant Procedure Nuclear Safety Instruction E-6.0, and all revisions, including Rev. 11 (ibid., p.

12, 1 n).

26. Plant Procedure & Practices 40-19, Bioassay Program (ibid.,

p.

13, 1 n)

27. tiuclear Safety Release 0.2.0, Bioassay Urinanalysis Program, including Appendix A (ibid., p.

13, 1 n).

28. Revisions 1 and 2 to Calibration & Operation Instruction (COI) 409, (Revision 2 dated 7/25/84) (ibid, p.

15, 1 o).

29. All staff evaluation reports of G.E.

committees filed with NRC between 1/1/80 and 3/13/85.

30. All PRODS filed with NRC between 1/19/84 and 3/17/85.
31. Uranium Process Management Project Application Amendment, dated June 1, 1984
32. All P/P's filed with NRC from January, 1984 to March 11, 1985.
33. January, 1984 Memorandum concerning NRC Region II comments on G.E.'s application for renewal of SNM-1097, referred to in 4/12/84 Memorandum from Page to Cunningham.

2

f

,.. o

/*

3 Mr. Joseph Felton March 7, 1985 Page 4 I

34. NRC Inspection Report 70-1113/83-28 and Notice of Violation dated 10/31/83, referred to in Stohr to Long letter, dated 6/22/84.
35. G.E.'s 6/7/84 response to NRC's 10/31/83 Notice of Violation referred to in Stohr to Long letter dated j

6/22/84.

Since the trial is scheduled to resume March 18, 1985, we respectfully urge your prompt action in response to this request.

Very truly yours, Moz t G.

Ratner cc:

James Lieberman, Esq.

Neal Abrams, Esq.

F.C. Shomaker, Esq.

i