Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133K527 + (12:50:02, 12 December 2024)
- ML20133K523 + (12:50:04, 12 December 2024)
- ML20133K524 + (12:50:04, 12 December 2024)
- BECO-85-140, Requests Resolution of Impact of ATWS Rule on Existing Tech Specs.Util Requires Approx 60 Days to Complete Plan & Schedule After Choosing Mod to Meet Standby Liquid Control Sys 86 Gpm Equivalent Control Capacity + (12:50:05, 12 December 2024)
- TXX-4579, Advises That Implementation of ATWS Mitigating Sys Actuation Circuitry (Amsac),Per Generic Ltr 85-06,scheduled for 861201,based on NRC Approval of WCAP-10858, AMSAC Generic Design Package + (12:50:05, 12 December 2024)
- ML20133K519 + (12:50:06, 12 December 2024)
- ML20133K516 + (12:50:07, 12 December 2024)
- ML20133K515 + (12:50:07, 12 December 2024)
- ML20133K513 + (12:50:08, 12 December 2024)
- ML20133K511 + (12:50:09, 12 December 2024)
- ML20133K507 + (12:50:10, 12 December 2024)
- ML20133K506 + (12:50:11, 12 December 2024)
- ML20133K502 + (12:50:12, 12 December 2024)
- ML20133K503 + (12:50:12, 12 December 2024)
- AECM-85-0330, Requests Authorization to Incorporate ASME Code Case N-335, Rules for Ultrasonic Exam of Similar & Dissimilar Metal Piping Welds,Section Xi,Div 1, Into Inservice Insp Program. Approval Requested by 851115.Fee Paid + (12:50:13, 12 December 2024)
- ML20133K501 + (12:50:13, 12 December 2024)
- ML20133K498 + (12:50:14, 12 December 2024)
- 1CAN108509, Provides ATWS (10CFR50.62) Implementation Schedule. Installation of ATWS Mods Will Be Completed Prior to Criticality Following Refueling Outage (1R8) Currently Scheduled for Dec 1987 + (12:50:15, 12 December 2024)
- ML20133K496 + (12:50:16, 12 December 2024)
- ML20133K494 + (12:50:17, 12 December 2024)
- ML20133K493 + (12:50:18, 12 December 2024)
- ML20133K492 + (12:50:19, 12 December 2024)
- ML20133K489 + (12:50:20, 12 December 2024)
- ML20133K491 + (12:50:20, 12 December 2024)
- ML20133K488 + (12:50:21, 12 December 2024)
- ML20133K486 + (12:50:22, 12 December 2024)
- ML20133K480 + (12:50:23, 12 December 2024)
- ML20133K484 + (12:50:23, 12 December 2024)
- ML20133K478 + (12:50:25, 12 December 2024)
- B11802, Provides Info Re Operating Experience for ASEA-ATOM Control Blades,Per NRC Request.Mechanical & Hydraulic Compatibility of Hafnium Tipped Blades W/Std GE Control Blades Demonstrated in NRC Review + (12:50:26, 12 December 2024)
- ML20133K476 + (12:50:26, 12 December 2024)
- ML20133K475 + (12:50:27, 12 December 2024)
- ML20133K472 + (12:50:28, 12 December 2024)
- ML20133K470 + (12:50:29, 12 December 2024)
- ML20133K467 + (12:50:30, 12 December 2024)
- ML20133K466 + (12:50:30, 12 December 2024)
- ML20133K465 + (12:50:31, 12 December 2024)
- 05000366/LER-1985-021-01, :on 850707,during Reactor Water Cleanup Sys Procedure,Inboard & Outboard Suction Isolation Valves Isolated.Caused by Misaligned Position Indicators.Repairs in Progress + (12:50:32, 12 December 2024)
- ML20133K462 + (12:50:33, 12 December 2024)
- ML20133K456 + (12:50:35, 12 December 2024)
- ML20133K459 + (12:50:35, 12 December 2024)
- ML20133K455 + (12:50:36, 12 December 2024)
- 3F0785-24, Responds to Violations Noted in Insp Rept 50-302/85-21. Corrective Actions:Procedures Revised in May 1985 to State Min Pressure of 225 Psig for Diesel Generator Air Start Sys to Reflect FSAR Commitment + (12:50:37, 12 December 2024)
- ML20133K454 + (12:50:37, 12 December 2024)
- ML20133K450 + (12:50:39, 12 December 2024)
- ML20133K449 + (12:50:39, 12 December 2024)
- ML20133K445 + (12:50:40, 12 December 2024)
- 05000366/LER-1996-004-03, :on 960917,misinterpretation of Requirements Resulted in Missed TSs Surveillance Occurred.Caused by Misinterpretation of Unit 2 TSs Surveillance.Procedure 57SV-011-2S Was Written & Approved + (12:50:41, 12 December 2024)
- HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 + (12:50:43, 12 December 2024)
- ML20133K439 + (12:50:43, 12 December 2024)
- ML20133K438 + (12:50:44, 12 December 2024)
- B11782, Requests Schedular Exemption from Requirements of 10CFR50, App A,Gdc 2 Re Seismic Interaction,Until Issuance of Full Power Ol.Exemption Requested to Allow Further Staff Review of Seismic Interaction Program + (12:50:45, 12 December 2024)