YANKEE ATOMIC ELECTRIC COMPANY w' oho"c(6") o TWX 710 380 7619 1671 Worcester Road, Framingham, Massachusetts 01701 2.C.15.1
- 6, 7j]
FYR 85-110 PC #191 October 16, 1985 United States Nuclear Regulatory Commir,slon Washington, DC 20555 Attention:
Office of Nuclecc Reactor Regulation
References:
(a) License Na, DPR-3 (Docket No. 50-29)
(b) YAEC Lettur to USNRC, dated May 1, 1981 (c) YAEC Lett(r to USNRC, dated April 17, 1984 (FYR 84-48)
(d) YAEC Letter to USNRC, dated August 7, 1984 (FYR 84-84)
(e) USNRC Letter to YAEC, dated September 14, 1983 (f) USNRC Letter to YAEC, dated January 4,1985 (NYR 85-08, Docket No. 50-29)
Subject:
Change to Technical Specification (NUREG-0452), Revision 4 Degraded Grid Voltage Surveillance
Dear Sir:
Pursuant to Section 50.59 of the Commission's Rules and Regulations, Yankee Atomic Electric Company hereby requests the authorization to make the following change.
PROPOSED CHANGE Reference is made to the Yankee Plant Operating License No. DPR-3.
We propose to modify Technical Specification Table 4.3-2, Engineered System Instrumentation Surveillance Requirements, to require a monthly functional test of the new second level degraded grid voltage protection for each of the three 480 V emergency buses. The amended Pages 3/4 3-15A and 3/4 3-16 are attached.
REASON AND BASIS FOR CHANGE The. Technical Specification for testing of the new second level degraded grid voltage protection requires an 18-month testing interval in accordance with standard Westinghouse Technical Specifloations (NUREG-0452), Revision 4.
In References (e) and (f), the NRC requested that this be changed to a monthly testing interval to verify both function and accuracy of the second level degraded grid voltage and timing relays.
8510220055 851016 PDR ADOCK 05000029 P
\\
0 h0 k
_ _ _ _ _ _ _ _ _ _an4vo750
I I
United States Nuclear Regulatory Commission October 16, 1985 Attention: Office of Nuclear Reactor Regulation Page 2 We have evaluated our current Technical Specification surveillance requirements for the first level (loss of voltage) undervoltage protection.
While these relays are not within the scope of our second level degraded grid modifications, it is our position that the current surveillance requirements are adequate for these relays, especially since these relays have demonstrated their high reliability over approximately 15 years. Therefore, based on this proven record, no change is warranted.
SAFETY CONSIDERATION The significant hazards consideration is based on the guidance provided by example in 48FR14870. The change described herein is classified according to the following examples of actions involving no significant hazards:
1.
A change that constitutos an additional limitation. restriction or control not presently included in the Technical Spacification (i.e., a mots stringent surveillance requirement).
2.
A change to make a license conform to changes in the regulations where the license change results in very minor changes to facility operations clearly in keeping with the regulations.
This change in the second level testing interval will permit early detection of setpoint delfting on second level degraded grid voltage relays and associated time delay relays. The change represents an additional surveillance requirement not presently included in the Technical Specification and has been made at the request of NRC to conform with acceptance criteria.
Based on tha consideration contained herein, it is concluded that there is reasonable assurance that operation of the Yankee plant, consistent with the proposed Technical Specification, will not endanger the health and safety of the public. This proposed change has been reviewed by the Nuclear Safety Audit and Review Committec.
FEE DETERMINATION An application fee of $150.00 is enclosed in accordance with 10CFR170.21.
SCHEDULE OF CHANGE These changes to the Yankee Technical Specification will be implemented
/
upon Commission approval. Notwithstanding, the Technical Specification will commence administrative 1y with the startup of Cycle 18.
A timely review and approval of this submittal consistent with our schedule for Cycle 18 is, therefore, requested.
b
'i
(
United States Nuclear Regulatory Convaission October 16, 1985 Attention. -Office of Nuclear Reactor Regulation
'Page 3 We trust that you will find this submittal satisfactory; however, should you desire additional information, please contact us.
Very truly yours, YANKEE ATOMIC E ECTRIC COMPANY D. Hunter Vice President 2
GP/gms Attachment COMMONWEALTH OF MASSACHUSETTS)
)ss MIDDLESEK COUNTY
)
Then personally appeared before me, D. Hunter, who, being duly sworn, did state that he is Vice President of Yankee Atomic Electric Company, that he is duly authorized to execute and file the foregoing document in the name and on the behalf of~ Yankee Atomic Electric Company and that the statements therein are true to the best of his knowledge and belief, dk b Robert H. Groce Notary Public My Conunission Expires August 29, 1991 5