Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-600201, Forwards Amend 34 to FSAR Updating & Clarifying Info. Commitment to Aws D1.3 Welding Std,Section 3.10 & Rev to Section 11.4 Describing Solid Radwaste Sys Will Require Addl NRC Review + (12:17:34, 12 December 2024)
- ML20133N949 + (12:17:35, 12 December 2024)
- ML20133N948 + (12:17:36, 12 December 2024)
- ML20133N947 + (12:17:37, 12 December 2024)
- ML20133N939 + (12:17:38, 12 December 2024)
- ML20133N945 + (12:17:38, 12 December 2024)
- ML20133N937 + (12:17:40, 12 December 2024)
- ML20133N936 + (12:17:40, 12 December 2024)
- ML20133N935 + (12:17:41, 12 December 2024)
- ML20133N934 + (12:17:41, 12 December 2024)
- ML20133N933 + (12:17:42, 12 December 2024)
- ML20133N931 + (12:17:43, 12 December 2024)
- IR 05000498/1996009 + (12:17:44, 12 December 2024)
- 05000341/LER-1985-066, :on 850927,reactor Protection Sys Tripped on High Pressure Due to West Turbine Bypass Valve Closing. Caused by Noise Picked Up by Turbine Speed Pickup & Seen as Speed Signal.Gain Level Adjusted + (12:17:46, 12 December 2024)
- IR 05000414/1985026 + (12:17:47, 12 December 2024)
- ML20133N926 + (12:17:48, 12 December 2024)
- ML20133N923 + (12:17:48, 12 December 2024)
- ML20133N920 + (12:17:49, 12 December 2024)
- RBG-21792, Confirms That Human Engineering Discrepancies Scheduled for Resolution Prior to Fuel Load Complete,Per 841031 Dcrdr Summary Rept & 850514,0612 & 0730 Suppls + (12:17:50, 12 December 2024)
- ML20133N918 + (12:17:50, 12 December 2024)
- ML20133N915 + (12:17:51, 12 December 2024)
- ML20133N912 + (12:17:52, 12 December 2024)
- ML20133N911 + (12:17:52, 12 December 2024)
- ML20133N909 + (12:17:53, 12 December 2024)
- ML20133N907 + (12:17:54, 12 December 2024)
- ML20133N903 + (12:17:54, 12 December 2024)
- ML20133N899 + (12:17:55, 12 December 2024)
- ML20133N902 + (12:17:55, 12 December 2024)
- ML20133N898 + (12:17:56, 12 December 2024)
- ML20133N897 + (12:17:57, 12 December 2024)
- ML20133N895 + (12:17:57, 12 December 2024)
- ML20133N894 + (12:17:58, 12 December 2024)
- ML20133N893 + (12:17:58, 12 December 2024)
- ML20133N892 + (12:17:59, 12 December 2024)
- ML20133N891 + (12:18:00, 12 December 2024)
- ML20133N888 + (12:18:01, 12 December 2024)
- ML20133N887 + (12:18:01, 12 December 2024)
- RBG-21786, Responds to NRC Request for Addl Info Re Apr 1981 Application for 40-yr License.Design Criteria Includes 40-yr Life Consideration for NSSS & balance-of-plant Scopes of Supply + (12:18:02, 12 December 2024)
- ML20133N886 + (12:18:02, 12 December 2024)
- ML20133N880 + (12:18:03, 12 December 2024)
- ML20133N881 + (12:18:03, 12 December 2024)
- ML20133N878 + (12:18:04, 12 December 2024)
- ML20133N877 + (12:18:06, 12 December 2024)
- ML20133N876 + (12:18:07, 12 December 2024)
- ML20133N875 + (12:18:07, 12 December 2024)
- ML20133N874 + (12:18:08, 12 December 2024)
- IR 05000348/1985028 + (12:18:09, 12 December 2024)
- ML20133N869 + (12:18:09, 12 December 2024)
- RBG-22472, Confirms That 3-inch 300 Lb Air Operated Globe Valves Seismically Qualified Using Static Analysis,Per 851010 Response.Operability of Valve/Operator Assembly Established Based on Similarity to Tested Valve/Operator Prototype + (12:18:10, 12 December 2024)
- ML20133N868 + (12:18:10, 12 December 2024)
- ML20133N866 + (12:18:12, 12 December 2024)
- ML20133N863 + (12:18:38, 12 December 2024)