ML20133N869

From kanterella
Jump to navigation Jump to search
Forwards Inservice Testing Program for Pumps & Valves, for Incorporation Into Existing Unit 1 Pump & Valve Inservice Testing Manual
ML20133N869
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/25/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20133N872 List:
References
NUDOCS 8510300190
Download: ML20133N869 (1)


Text

-

Duxe POWER GOMPANY P.O. Box 33180 CilAHLOTTE N.C. 28242 HALU. TUCKER TFLEPHONE

m. m. m po4) ara-4sai

====-== October 25, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station, Unit 2 Docket No. 50-414

Dear Mr. Denton:

Enclosed are six copies of the Catawba Nuclear Station (Unit 2) Pump and Valve Inservice Testing Program. These should be incorporated into the existing Unit 1 Pump and Valve Inservice Testing bbnual.

Very truly yours, e

d '.

Hal B. Tucker RWO: sib Enclosures cc: (w/o enclosures)

Dr. J. Nelson Grace, Regional Administrator Mr. P. K. Van Doorn U. S. Nuclear Regulatory Commission NRC Resident Inspector Region II Catawba Nuclear Station 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 Robert Guild, Esq.

P. O. Box 12097 -

Palmetto Alliance p4 NAL l 2135 Devine Street & [gy Columbia, South Carolina 29205 f 4gg kSib 8510300190 851025 ggX PDR ADOCK 05000414 A PDR u  ;