Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134H314 + (09:21:40, 12 December 2024)
- ML20134H310 + (09:21:41, 12 December 2024)
- RBG-43321, Forwards LAR 96-048,requesting Single Deviation from Approved Fire Protection Program IAW Change Process + (09:21:42, 12 December 2024)
- ML20134H308 + (09:21:43, 12 December 2024)
- U-602661, Monthly Operating Rept for Oct 1996 for Clinton Power Station,Unit 1 + (09:21:43, 12 December 2024)
- ML20134H305 + (09:21:44, 12 December 2024)
- ML20134H304 + (09:21:45, 12 December 2024)
- ML20134H303 + (09:21:46, 12 December 2024)
- 05000341/LER-1996-014, :on 961004,Div 2 UHS cross-connect Valve de-energized.Caused by Loose Set Screw on Valve Operator Spline bushing.Cross-connect Path Established & Valves Will Also Be Modified W/Set Screw Recess + (09:21:50, 12 December 2024)
- ML20134H296 + (09:21:52, 12 December 2024)
- ML20134H298 + (09:21:52, 12 December 2024)
- ML20134H294 + (09:21:53, 12 December 2024)
- ML20134H293 + (09:21:54, 12 December 2024)
- JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant + (09:21:55, 12 December 2024)
- ML20134H289 + (09:21:55, 12 December 2024)
- ML20134H287 + (09:21:56, 12 December 2024)
- ML20134H284 + (09:21:58, 12 December 2024)
- NRC-96-0092, Failure of RHR Svc Water Reservoir cross-connect Valve to Open as Required to Satisfy TS Lco. Commitments Made as Submitted + (09:21:59, 12 December 2024)
- ML20134H279 + (09:22:01, 12 December 2024)
- ML20134H278 + (09:22:01, 12 December 2024)
- ML20134H277 + (09:22:02, 12 December 2024)
- ML20134H276 + (09:22:06, 12 December 2024)
- ML20134H275 + (09:22:06, 12 December 2024)
- B15953, Submits Response to Request for Addl Info Re Porous Concrete sub-foundation.FSB Located on East Side of Reactor Containment Bldg & Two Foundation Structures + (09:22:07, 12 December 2024)
- ML20134H273 + (09:22:08, 12 December 2024)
- ML20134H272 + (09:22:09, 12 December 2024)
- ML20134H270 + (09:22:10, 12 December 2024)
- ML20134H271 + (09:22:10, 12 December 2024)
- ML20134H269 + (09:22:11, 12 December 2024)
- 05000277/LER-1996-010-01, :on 961006 & 1015,two Automatic Reactor Shutdown Occurred as Result of Main Generator Trip & Lockout Due to Actuation of Negative Sequence Current Protective Relay.Relay Replaced W/Relay of Newer Design + (09:22:14, 12 December 2024)
- ML20134H267 + (09:22:15, 12 December 2024)
- ML20134H266 + (09:22:15, 12 December 2024)
- ML20134H265 + (09:22:17, 12 December 2024)
- ML20134H263 + (09:22:17, 12 December 2024)
- ML20134H261 + (09:22:18, 12 December 2024)
- ML20134H259 + (09:22:19, 12 December 2024)
- ML20134H257 + (09:22:20, 12 December 2024)
- PY-CEI-NRR-2108, Forwards Response to Request for Info on Porous Concrete sub-foundation + (09:22:20, 12 December 2024)
- ML20134H253 + (09:22:21, 12 December 2024)
- ML20134H251 + (09:22:22, 12 December 2024)
- ML20134H252 + (09:22:22, 12 December 2024)
- 05000482/LER-1988-028, Partially Deleted LER 88-028-00:on 881209,0.7093 Uci Co-60 Removed from Chin.Caused Likely When Individual Deposited Tools Just Prior to Exiting Containment.Surveys Taken in Area for Hot Particles + (09:22:23, 12 December 2024)
- ML20134H249 + (09:22:24, 12 December 2024)
- ML20134H248 + (09:22:25, 12 December 2024)
- ML20134H247 + (09:22:25, 12 December 2024)
- ML20134H246 + (09:22:26, 12 December 2024)
- 05000482/LER-1988-028-01, :on 881209,individual Received Skin Dose in Excess of Limits.Caused by Unexpected Hot Particle Contamination.Review of Hot Particle Contamination Control Program Performed to Address Concerns + (09:22:29, 12 December 2024)
- ML20134H241 + (09:22:31, 12 December 2024)
- ML20134H242 + (09:22:31, 12 December 2024)
- ML20134H239 + (09:22:32, 12 December 2024)
- ML20134H240 + (09:22:32, 12 December 2024)
- NSD-NRC-96-4869, Forwards Advanced Copy of Revised Section 2,focused PRA Study of WCAP-13856, AP600 Implementation of Regulatory Treatment of NonSafety-Related Sys Process + (09:22:33, 12 December 2024)