ML20134H259
| ML20134H259 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/05/1996 |
| From: | Geoffrey Edwards PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134H262 | List: |
| References | |
| NUDOCS 9611140024 | |
| Download: ML20134H259 (1) | |
Text
.
Garrstt D.Edwrrds Pe c.h tt Atome Power Station PECO NUCLEAR esco ceerov comneev 1848 Lay Road A Umr or /YCO EMRCy 7314-9032 gita P November 5, 1996 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Docket Nos. 50-277
SUBJECT:
Licensee Event Report, Peach Bottom Atomic Power Station l
Unit 2 I
This LER concerns two automatic reactor shutdowns as a result of a main generator trip and lockout due to an actuation of the negative sequence protective relay.
Reference:
Docket No. 50-277 l
Report Number:
2-96-010 Revision Number: 00 Event Dates:
10/6/96 & 10/15/96 Report Date:
11/05/96 Facility:
Peach Bottom Atomic Power Station 1848 Lay Road, Delta, PA 17314
(
This LER is being submitted pursuant to the requirements of 10 CFR 50.73(a)(2)(iv).
l Sincerely, AM k0. blN/iWS i
j GDE\\JHG:jhg l
l enclosure l
cc:
B.
Gorman, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania
}p/
INPO Records Center H. J. Miller, US NRC, Administrator, Region 1 R. I, McLean, State of Maryland W. L. Schmidt, US NRC, Senior Resident inspector A. F. Kirby Ill, De'MarVa Power j
i H. C. Schwemm, VP - Atlantic Electric i
\\
\\
.fd1 igg { 7 7
8 4