Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138A173 + (01:18:54, 12 December 2024)
- ML20138A168 + (01:18:55, 12 December 2024)
- ML20138A167 + (01:18:55, 12 December 2024)
- ML20138A164 + (01:18:56, 12 December 2024)
- 05000414/LER-1997-003-01, :on 970217,component Cooling Sys Unavailability Was Caused by Failure of Breaker Charging Springs Motor Coils When Breaker Was Closed on 970125.Failed Breaker Was Replaced W/Refurbished Spare Breaker + (01:18:58, 12 December 2024)
- ML20138A160 + (01:18:59, 12 December 2024)
- ML20138A159 + (01:18:59, 12 December 2024)
- ML20138A157 + (01:19:00, 12 December 2024)
- ML20138A156 + (01:19:00, 12 December 2024)
- ML20138A155 + (01:19:01, 12 December 2024)
- ML20138A152 + (01:19:02, 12 December 2024)
- 05000331/LER-1985-044, :on 851105,RCIC Taken Out of Svc to Modify RCIC-to-vessel Inject Valve Circuitry.Repair Completed.On 851107,RCIC Tripped on Electrical Overspeed.Caused by Setpoint Drift on Overspeed Trip Monitor + (01:19:07, 12 December 2024)
- ML20138A146 + (01:19:08, 12 December 2024)
- ML20138A145 + (01:19:08, 12 December 2024)
- B11716, Forwards Reviews of Integrated Safety Assessment Program, Topics 2.17,2.21 & 2.24 Re Ventilation Duct Chase Plant Distribution Protection,Load Ctr Replacement of Oil Filled Breakers & Offsite Power Sys,Respectively + (01:19:09, 12 December 2024)
- ML20138A143 + (01:19:09, 12 December 2024)
- ML20138A140 + (01:19:13, 12 December 2024)
- ML20138A138 + (01:19:13, 12 December 2024)
- B11672, Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer + (01:19:14, 12 December 2024)
- ML20138A134 + (01:19:14, 12 December 2024)
- ML20138A133 + (01:19:15, 12 December 2024)
- ML20138A132 + (01:19:16, 12 December 2024)
- ST-HL-AE-1373, Provides Addl Info Re Risk Mgt Program to Evaluate Design Changes in Form of Modified Preliminary Scoping Study,Per 850819 Commitment.Positive Displacement Charging Pump Incorporated in Program + (01:19:16, 12 December 2024)
- ML20138A128 + (01:19:18, 12 December 2024)
- ML20138A124 + (01:19:19, 12 December 2024)
- ML20138A120 + (01:19:20, 12 December 2024)
- ML20138A116 + (01:19:21, 12 December 2024)
- PNO-III-86-018, on 860307,reactor Automatically Tripped While in Process of Shutting Down for Scheduled 5-wk Maint & Refueling Outage.Caused When One Rod Failed to Fully Insert. Rod Manually Inserted.Breaker B Replaced + (01:19:21, 12 December 2024)
- 05000528/LER-1985-068, Corrected LER 85-068-00:on 851020,discovered That Four Valves Not Tested within Required Quarterly Surveillance Interval by 851018.Caused by Ineffective Communication Between Nonlicensed Personnel + (01:19:22, 12 December 2024)
- PNO-IV-97-021A, on 970422,extraction Steam Line Break Update Made.Licensee Anticipates Asbestos Removal by First Wk in May.Multidiscipline Investigation Team W/Several Industry Representative Being Assembled by Licensee + (01:19:23, 12 December 2024)
- ML20138A107 + (01:19:24, 12 December 2024)
- ML20138A106 + (01:19:24, 12 December 2024)
- ML20138A099 + (01:19:25, 12 December 2024)
- ML20138A097 + (01:19:26, 12 December 2024)
- ML20138A098 + (01:19:26, 12 December 2024)
- ML20138A089 + (01:19:33, 12 December 2024)
- ML20138A088 + (01:19:33, 12 December 2024)
- ML20138A087 + (01:19:34, 12 December 2024)
- IR 05000245/1996013 + (01:19:35, 12 December 2024)
- 05000309/LER-1985-018, :on 851106,reactor Trip on Loss of Load Occurred Due to Main Turbine Trip.Caused by Tripped Turbine Driven Main Feed Pump on Low Suction Pressing Due to Failure of Feed Pump Recirculation Valve Controller + (01:19:37, 12 December 2024)
- PNO-III-86-020, on 860303,Westinghouse DB-50 Reactor Trip Breaker Tripped at 190 Milliseconds During Testing. Subsequent Response Tests Satisfactory.Vendor Assisting in Troubleshooting + (01:19:38, 12 December 2024)
- ML20138A080 + (01:19:39, 12 December 2024)
- ML20138A079 + (01:19:39, 12 December 2024)
- ML20138A078 + (01:19:40, 12 December 2024)
- ML20138A075 + (01:19:41, 12 December 2024)
- ML20138A076 + (01:19:41, 12 December 2024)
- ML20138A074 + (01:19:42, 12 December 2024)
- IR 05000461/1985061 + (01:19:43, 12 December 2024)
- PY-CEI-NRR-0358, Forwards 851004 Rev 5 to Security Plan,Updating License Application & Plan.Rev Withheld (Ref 10CFR73.21) + (01:19:44, 12 December 2024)
- ML20138A071 + (01:19:44, 12 December 2024)
- ML20138A068 + (01:19:46, 12 December 2024)
- ML20138A069 + (01:19:46, 12 December 2024)