Forwards List of NRC Prof Hours & Contractual Costs for Completed Review of Topical Repts
ML20138A078
Person / Time
Issue date: 12/05/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Taylor J
BABCOCK & WILCOX CO.
References
04284, 04338, 04339, 4284, 4338, 4339, 43841, 56061, NUDOCS 8512110537
Download: ML20138A078 (2)


Text

_ . -

-DISTRIBUTION w/ encl.:

.-- PDR Reg R3 cords

' HBernard, SSPB.

LSolander, PRAB~

CHarwood,:PRAB 5 g5 RRakowski, PN/A

-DEC: MRodriguez, RM/A LFMS SP Actual M/P LFMS Topical CJHolloway Babcock & Wilcox Company 9(p

' ATTN: Mr. J. H. Taylor i

Manager - Licensing 3315 Old Forest Road Post Office Box 1260-(vnchburg, Virginia 24505-1260 Gentlemen:

Consistent with' the requirements of 10 CFR 170.12(f) and .170.21.J we ro have detemined the completed the p(s)fessional staff hours and contractual costs for'of the topic review sheet. The Office of Resource Management has been notified to bill your Company for these completed reviews. When making payment,~please make reference to the bill ntaber. In those. cases where your Company has made payment for some_ portion of the report review based on the Commission's

-periodic billing method, these payments are shown as a credit on the

. enclosure.

Under the provisions of 10 CFR 170.21.J.-fees are determined based on

$39 per professional staff hour for review time expended between filing of the report and June 23,1984 (the ending period of the first full week after the revised rule became effective on June 20,1984). From June 24,1984_through completion of the review, the professional staff rate is'$62 per. hour. Where review cost exceeds $20,000, your Company is billed for $20,000 because that is the maximum which can be charged under Part 170 for the review of a topical report or for each revision or amendment to an accepted topical report.

.If you have other report reviews that have been completed'or are under review, but are not on the enclosed sheet, they will be billed at a

'later date when cost data are available. Any questions relating to your bills should be directed to Mrs. Reba M. Diggs on 301/492-7225.

Sincerely, knal Signe<l by Sb.O. Miller l

C DR William 0. Miller. Director License Fee Management Staff p

Ge Office of Administration ,

od

Enclosure:

List of Reports and Costs

~'c= >  : LFMS:ADM j,,, ,L ADM, . , , ,

..... . 99.. i.J P.. . .CJ. . . way.. ..WOMi .ler.. .

""* b I8) , ,,1 . .

85 .lM..' ../85.. , , . . . . . . .

NIC FORM 318 (10-80) NRCM 0240 OFFlCIAL RECORD COPY

.. ENCLOSURE 1 LIST OF TOPICAL REPORT REVISIONS AND REVIEW COSTS Company name'and address: Babcock & Wilcox Company ATTN: Mr. J. H. Taylor Manager - Licensing 3315 Old Forest Road Post Office Box 1260 Lynchburg, Virginia 24505-1260 NRC Report No. and Title Control No. Review Status Review Costs

1. Rev. 3 to BAW-10094 "B&W 43841 Completed $4,588*

Revisions to THETA 1-B, A 5/8/85 Computer Code for Nuclear Reactor Code Thermal Analysis" (4/23/81) <

  • 74 hours8.564815e-4 days <br />0.0206 hours <br />1.223545e-4 weeks <br />2.8157e-5 months <br /> at $62. Total review cost is $9,034 ($4,446 paid and

$4,588 currently being billed).

2. Revision 1 to BAW-10025'- 04284 Completed $8,522*

" Reactor Vessel Model Flow 4/11/84 Tests for 205-Fuel Assembly Core" as submitted 6/30/78.

  • 69 hrs. x $39 and $5.831 in con-tractual_ costs. This cost does not include review of the report submitted 9/16/76 which was revised and resubmitted on 6/30/78.
3. BAW-10152 "N0ODLE - A Multi- 56061 Completed $9,212*

Dimensional Two-Group Reactor 4/24/85 Simulator" (9/24/84)

  • 62 x 151 hrs. = $9,362 less $150  !

application fee paid with letter 9/26/84 by Check No. 055977 dtd. l 9/25/84.

4. B&W Letters 9/26/84 and 5/9/85 04338/ ;ompleted $248 for review of the B&W-2 CHF 04J39 7/1/85 (4 hrs. x $52)

Correlation with LYNX-1 (BAW-10129) -

and LYNX-2 (BAW-10130). (Basic reports were prefee (3/23/78) and -

I approved 8/23/84 so no fees to be assessed for them).

TOTAL AHOUNT DUE: 322,570