Responds to NRC Re Violations Noted in Insp on 850717-19.Corrective Actions:Evacuation Drills Will Be Held Annually & Written Operator Exams Will Be Held During Last Quarter 1985
ML20138A099
Person / Time
Site: 05000139
Issue date: 09/26/1985
From: Jeremy Bowen
WASHINGTON, UNIV. OF, SEATTLE, WA
To: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20138A085 List:
References
NUDOCS 8510080461
Download: ML20138A099 (1)


Text

' ,

11ECEWED UNIVERSITY OF WASHINGTON fGC SEATTLE, WASlHNGTON 9H195 ESS SEP 30 M D 45 College of Engineering, FH-10 September 26, 1985 0ffwe of the Dean REGloigy Vy Mr. Ross A. Scarano, Director Division of Radiological Safety and Safeguards Programs USNRC Region V 1450 Maria Lane Walnut Creek, CA 94596

Dear Mr. Scarano:

Receipt of the report of the NRC inspection of the University of Washing-ton Nuclear Engineering Laboratory by Mr. M. Cillis on July 17-19, 1985, which specifies two violations of severity level IV is hereby acknowledged.

A. Annual evacuation drill not held in 1984.

There was an interval of 15 months between the drill on December 16, 1983, and the drill on March 28, 1985. This interval corresponds to a technical violation rather than to any decrease in the level of preparedness of the reactor staff. S.he drills have been scheduled to occur at least once in each calendar year. Occasionally, technical difficulties with planning result in the interval between drills being slightly extended. This does not compromise either the intent of benefit of the drills, the staff makes every effort to maintain the drill schedule at one per calendar year.

1. Previous corrective steps: Improve scheduling of drills
2. Future corrective steps: Hold at least one drill per calendar year
3. Full compliance occurred on March 28, 1985.

B. Written examinations for the University of Washington's Nuclear Engineering Laboratory reactor operators and senior reactor operators were not administered during the first quarter of 1985.

More attention will be applied to maintaining the schedule of ,perator requalification exams.

1. Exams will be completed and graded by October 31, 1985.
2. Exam schedule will be maintained as described in the approved operators regulification program of October 9, 1974. -
3. Full compliance will be achieved by October 31, 1985.

Sincerely yours, 8510080461 851004 5

PDR ADOCK 05000139 t g PDR. J. Ray Bowen Dean JRB:kky Telephone: (206) 543-0340