ML20138A080
| ML20138A080 | |
| Person / Time | |
|---|---|
| Site: | 05000139 |
| Issue date: | 10/04/1985 |
| From: | Scarano R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Jeremy Bowen WASHINGTON, UNIV. OF, SEATTLE, WA |
| Shared Package | |
| ML20138A085 | List: |
| References | |
| NUDOCS 8510080459 | |
| Download: ML20138A080 (1) | |
Text
..
~
iid. i J
1 3
- A.
l OCT OL41985
~
i Docket'No. 50-139
^
University of Washington Seattle, Washington 98195 Attention:._J. Ray Bowen Dean, College of Engineering FH-10 Gentlemen:
,Thank you for your letter dated September 26, 1985, informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated September 4, 1985. Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, J
l$
i Ross A. Scarano, Director Division of Radiation Safety and Safeguards
@i cc:
State WA bec:
RSB/ Document Control Desk (RIDS)
Mr.
J.~ Martin Mr. B. Faulkenberry G.'. Cook.
- LFMB RV
((
k-Q MM
[
MCillis:dh GYu as FWenslawski RScarano 10/ / /85 10/ l /85 10/ 3 /85 10/ sJ/85 l
85100e0459e5gj39 g=
swa o em.
go 3
i
-