Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138L115 + (23:52:45, 11 December 2024)
- 05000341/LER-1985-030, :on 850701,at 2% Power,Reactor Scram Occurred. Caused by Procedural Error Resulting in Spurious Water Level 3 Signal Generation.Instrumentation & Control Technician Training Enhanced to Prevent Recurrence + (23:52:47, 11 December 2024)
- ML20138L111 + (23:52:48, 11 December 2024)
- ML20138L109 + (23:52:49, 11 December 2024)
- ML20138L110 + (23:52:49, 11 December 2024)
- ML20138L101 + (23:52:50, 11 December 2024)
- ML20138L094 + (23:52:51, 11 December 2024)
- IR 05000454/1985047 + (23:52:52, 11 December 2024)
- BSEP-85-1760, Advises That Completion Date for Maint Surveillance Test Procedure Program Revised to 860131,in Response to Insp Repts 50-324/84-31 & 50-325/84-31.Commitment Schedule Encl + (23:52:53, 11 December 2024)
- ML20138L090 + (23:52:54, 11 December 2024)
- ML20138L088 + (23:52:55, 11 December 2024)
- IR 05000455/1985031 + (23:53:07, 11 December 2024)
- ML20138L082 + (23:53:08, 11 December 2024)
- ML20138L084 + (23:53:08, 11 December 2024)
- ML20138L080 + (23:53:09, 11 December 2024)
- ML20138L081 + (23:53:09, 11 December 2024)
- IR 05000213/1985020 + (23:53:11, 11 December 2024)
- ML20138L077 + (23:53:11, 11 December 2024)
- ML20138L075 + (23:53:12, 11 December 2024)
- ML20138L074 + (23:53:13, 11 December 2024)
- ML20138L072 + (23:53:13, 11 December 2024)
- ML20138L069 + (23:53:14, 11 December 2024)
- ML20138L065 + (23:53:16, 11 December 2024)
- ML20138L066 + (23:53:16, 11 December 2024)
- ML20138L064 + (23:53:17, 11 December 2024)
- 05000352/LER-1985-077, :on 850926,spurious Div IV Trip Signals Received Resulting in Load Shedding in Anticipation of Diesel Generator Loading.Caused by Loose Connection in Power Panel.Connection Tightened + (23:53:18, 11 December 2024)
- ML20138L058 + (23:53:20, 11 December 2024)
- ML20138L057 + (23:53:21, 11 December 2024)
- ML20138L056 + (23:53:21, 11 December 2024)
- PNO-III-85-102, on 851214,during Outage,Both Trains of RHR Sys Lost When Water in Reactor Vessel Drained Below Level of Suction Line.Caused by Erroneous Control Room Indication of RCS Configuration Used for Outage + (23:53:25, 11 December 2024)
- ML20138L049 + (23:53:26, 11 December 2024)
- ML20138L045 + (23:53:27, 11 December 2024)
- ML20138L044 + (23:53:28, 11 December 2024)
- ML20138L040 + (23:53:29, 11 December 2024)
- IR 05000373/1985036 + (23:53:32, 11 December 2024)
- ML20138L037 + (23:53:33, 11 December 2024)
- ML20138L035 + (23:53:34, 11 December 2024)
- ML20138L034 + (23:53:34, 11 December 2024)
- ML20138L031 + (23:53:35, 11 December 2024)
- ML20138L027 + (23:53:36, 11 December 2024)
- ML20138L026 + (23:53:37, 11 December 2024)
- ML20138L024 + (23:53:38, 11 December 2024)
- ML20138L022 + (23:53:38, 11 December 2024)
- ML20138L019 + (23:53:39, 11 December 2024)
- ML20138L020 + (23:53:39, 11 December 2024)
- ML20138L018 + (23:53:40, 11 December 2024)
- ML20138L014 + (23:53:40, 11 December 2024)
- ML20138L013 + (23:53:41, 11 December 2024)
- B11681, Forwards Summary of Integrated Safety Assessment Program Topic 1.17, Replacement of Motor-Operated Valves, Which Was Evaluated for Public Safety Impacts,Per 850731 Request. Safety Impact Scores Considered Preliminary + (23:53:42, 11 December 2024)
- ML20138L011 + (23:53:42, 11 December 2024)
- RA-97-0002, Forwards Rev 33 to Industrial Security Plan.Encl Withheld + (23:53:43, 11 December 2024)