Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138P549 + (23:20:33, 11 December 2024)
- ML20138P548 + (23:20:33, 11 December 2024)
- ML20138P547 + (23:20:34, 11 December 2024)
- TXX-4649, Forwards WCAP-10684, Comanche Peak Unit 2 Reactor Vessel Radiation Surveillance Program. Rept Contains Fracture Toughness Info Required by Sser 1 to Confirm Compliance W/Requirements of App G of 10CFR50 + (23:20:35, 11 December 2024)
- ML20138P543 + (23:20:36, 11 December 2024)
- ML20138P541 + (23:20:37, 11 December 2024)
- ML20138P539 + (23:20:38, 11 December 2024)
- ML20138P537 + (23:20:39, 11 December 2024)
- ML20138P538 + (23:20:39, 11 December 2024)
- ST-HL-AE-1564, Forwards marked-up FSAR Section App 11.A & Environ Rept - OL Sections 5.3 & 6.1 Re Calculations of Offsite Radiological Impacts,To Be Incorporated Into Future Amends + (23:20:40, 11 December 2024)
- 0CAN029707, Annual Occupational Exposure Data Rept for Period from 960101-961231 + (23:20:41, 11 December 2024)
- 05000320/LER-1984-017, :on 841024,sonar Insp of Flood Protection Dike Revealed Degradation of Submerged Toe in Vicinity of River Water Pump Houses.Sept 1985 Insp Revealed Same Degradation. Baseline Degradation Criteria Changed + (23:20:43, 11 December 2024)
- ML20138P533 + (23:20:44, 11 December 2024)
- ML20138P532 + (23:20:44, 11 December 2024)
- ML20138P531 + (23:20:45, 11 December 2024)
- ML20138P530 + (23:20:45, 11 December 2024)
- ML20138P529 + (23:20:46, 11 December 2024)
- ML20138P527 + (23:20:47, 11 December 2024)
- ML20138P528 + (23:20:47, 11 December 2024)
- ML20138P526 + (23:20:48, 11 December 2024)
- ML20138P524 + (23:20:49, 11 December 2024)
- ML20138P525 + (23:20:49, 11 December 2024)
- IR 05000424/1985057 + (23:20:50, 11 December 2024)
- ML20138P520 + (23:20:51, 11 December 2024)
- ML20138P519 + (23:20:51, 11 December 2024)
- ML20138P517 + (23:20:52, 11 December 2024)
- ML20138P512 + (23:20:54, 11 December 2024)
- ML20138P514 + (23:20:54, 11 December 2024)
- ST-HL-AE-5593, Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station + (23:20:55, 11 December 2024)
- 05000361/LER-1985-056, :on 851114,Train a Containment Purge Isolation Sys Spuriously Actuated Due to Electrical Noise Spike on Containment Area Radiation Monitor 2RT-7856.Caused by Ground Current Surges Entering Detector + (23:20:57, 11 December 2024)
- ML20138P508 + (23:20:58, 11 December 2024)
- ML20138P505 + (23:20:59, 11 December 2024)
- 05000259/LER-1985-053, :on 851118,during 10CFR50,App J Review, Determined That Valve Packing on HPCI Turbine Exhaust Valve, RCIC Turbine Exhaust Valve & Turbine Condenser Vacuum Pump Discharge Valve Not Checked + (23:21:00, 11 December 2024)
- ML20138P502 + (23:21:02, 11 December 2024)
- 05000245/LER-1985-029, :on 851126,during Bench Checks of Main Steam Safety/Relief Valves,All Six Valves Lifted at Pressures Exceeding Tech Spec Limit.Caused by High Friction at Labyrinth Seal in Valve Topworks + (23:21:04, 11 December 2024)
- U-600301, Final Deficiency Rept 55-85-06 Re Wiring & Workmanship Defects in safety-related Electrical Panels.Initially Reported on 850626.Panels Reworked & Engineering Drawings Corrected + (23:21:05, 11 December 2024)
- ML20138P497 + (23:21:06, 11 December 2024)
- ML20138P498 + (23:21:06, 11 December 2024)
- TXX-4650, Deficiency Rept SDAR-188 Re Width of as-built Seismic Gap Between All Major Plant Structures.Issue Being Pursued Under Comanche Peak Response Team Program Plan Item Iic + (23:21:07, 11 December 2024)
- ML20138P495 + (23:21:07, 11 December 2024)
- ML20138P494 + (23:21:08, 11 December 2024)
- U-600074, Amended Final Deficiency Rept 55-83-06 Re Inadequate Vendor Shop Welding on Rockwell Engineering Structural Steel Members.Initially Reported on 830427.Condition Not Reportable Per 10CFR50.55(e) + (23:21:09, 11 December 2024)
- ML20138P490 + (23:21:10, 11 December 2024)
- ML20138P491 + (23:21:10, 11 December 2024)
- ML20138P489 + (23:21:11, 11 December 2024)
- ML20138P485 + (23:21:11, 11 December 2024)
- ST-HL-AE-1545, First Interim Deficiency Rept Re Discrepancies in motor- Operated Valves.Initially Reported on 851119.Insp Program Initiated to Review safety-related motor-operated Valves. Next Rept Will Be Sent by 860311 + (23:21:12, 11 December 2024)
- ML20138P483 + (23:21:13, 11 December 2024)
- ML20138P481 + (23:21:14, 11 December 2024)
- ML20138P480 + (23:21:15, 11 December 2024)
- ML20138P477 + (23:21:16, 11 December 2024)
- ML20138P479 + (23:21:16, 11 December 2024)