Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141F372 + (20:17:15, 11 December 2024)
- ML20141F369 + (20:17:16, 11 December 2024)
- ML20141F366 + (20:17:17, 11 December 2024)
- ML20141F367 + (20:17:17, 11 December 2024)
- ML20141F364 + (20:17:18, 11 December 2024)
- 05000315/LER-1985-043, :Corrective Actions & Preventive Measures Taken Re Discrepancies in Process Sensor Calibr Completed,Per Confirmatory Action Ltr Issued on 850820 + (20:17:20, 11 December 2024)
- ML20141F362 + (20:17:21, 11 December 2024)
- 05000267/LER-1986-016, :on 860314,hydraulic Power Sys Functional Test Not Completed within Specified Time.Caused by Personnel Error.Retest of Sections 5.5,5.6 & 5.7 Completed Successfully on 860314.Personnel Trained + (20:17:23, 11 December 2024)
- ML20141F360 + (20:17:24, 11 December 2024)
- 05000323/LER-1986-010, :on 860314,automatic Isolation of Containment Ventilation Sys Occurred.Caused by Momentary Alarm Signal from Gaseous Radiation Monitors.Event Being Studied by Noise Reduction Task Force + (20:17:26, 11 December 2024)
- 05000315/LER-1985-068, :on 851213,unexpected Stream Line Isolation Occurred.Caused by Natural Sequence During Performance of Approved Surveillance Test Procedure & Technician Failure to Warn Operators of Event + (20:17:28, 11 December 2024)
- ML20141F355 + (20:17:29, 11 December 2024)
- ML20141F353 + (20:17:30, 11 December 2024)
- ML20141F352 + (20:17:30, 11 December 2024)
- ML20141F351 + (20:17:31, 11 December 2024)
- ML20141F344 + (20:17:36, 11 December 2024)
- ML20141F342 + (20:17:37, 11 December 2024)
- ML20141F340 + (20:17:38, 11 December 2024)
- ML20141F339 + (20:17:38, 11 December 2024)
- ML20141F335 + (20:17:39, 11 December 2024)
- ML20141F336 + (20:17:39, 11 December 2024)
- B16515, Informs That Due to Termination of Employment W/Util, Cg Pikes License SOP-10551-1 Has Expired + (20:17:40, 11 December 2024)
- ML20141F333 + (20:17:40, 11 December 2024)
- ML20141F331 + (20:17:43, 11 December 2024)
- ML20141F328 + (20:17:44, 11 December 2024)
- ML20141F327 + (20:17:45, 11 December 2024)
- ML20141F325 + (20:17:46, 11 December 2024)
- B11930, Discusses Effects of Hurricane Gloria,Including Preparations for Storm & Loss of Offsite Power Events at Millstone Units 1 & 2 on 850927.Advance Notification Associated W/Severe Weather Events Permits Advance Precautionary Actions + (20:17:47, 11 December 2024)
- 05000368/LER-1997-004-01, :on 970526,engineer Noticed That Sample Pump on Containment Bldg Super Particulate I Noble Gas Radiation Monitor Was Inoperable.Caused by Inadequate Alarming Capabilities.Software Change Implemented + (20:17:48, 11 December 2024)
- ML20141F321 + (20:17:50, 11 December 2024)
- NSD-NRC-97-5204, Forwards SSAR Markups for Tables 14.3-1 Through 14.3-7 in Response to 970304 RAI 640.27 Concerning Followon Questions Re AP600 Insps,Test,Analyses & Acceptance Criteria (ITAAC) + (20:17:51, 11 December 2024)
- ML20141F317 + (20:17:53, 11 December 2024)
- ML20141F315 + (20:17:54, 11 December 2024)
- 05000346/LER-1997-007, :on 970305,determined That Acceptance Criteria of Surveillance Test to Measure Leakage Into Dh Valve Pit Potentially non-conservative.Caused by Human Error. Surveillance Test Revised + (20:17:55, 11 December 2024)
- ML20141F313 + (20:17:57, 11 December 2024)
- ML20141F312 + (20:17:57, 11 December 2024)
- U-600384, Forwards Response to 851029 Request for Addl Info Re Initial Plant Test Program + (20:17:58, 11 December 2024)
- ML20141F308 + (20:17:59, 11 December 2024)
- ML20141F307 + (20:18:00, 11 December 2024)
- ML20141F304 + (20:18:00, 11 December 2024)
- ML20141F302 + (20:18:01, 11 December 2024)
- ML20141F301 + (20:18:02, 11 December 2024)
- ML20141F298 + (20:18:07, 11 December 2024)
- ML20141F296 + (20:18:11, 11 December 2024)
- NSD-NRC-97-5203, Forwards Response to RAI 470.31 Which Includes Detailed Discussion of Ph History That Has Been Calcuated for IRWST Residual Water Volume Following LOCA & Impact of Low Ph in Solution on LOCA doses.AP600 MCR Dose Analysis,Discussed + (20:18:12, 11 December 2024)
- ML20141F295 + (20:18:12, 11 December 2024)
- ML20141F291 + (20:18:13, 11 December 2024)
- ML20141F287 + (20:18:14, 11 December 2024)
- ML20141F286 + (20:18:15, 11 December 2024)
- ML20141F285 + (20:18:16, 11 December 2024)
- RBG-22-604, Monthly Operating Rept for Oct 1985 + (20:18:17, 11 December 2024)