RBG-22-604, Monthly Operating Rept for Oct 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1985
ML20141F283
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/31/1985
From: Deddens J, Fredieu A, Simmons J
GULF STATES UTILITIES CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
RBG-22-604, NUDOCS 8601090142
Download: ML20141F283 (5)


Text

_

.o 4

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-85-003 DATE 11/04/85 COMPLETED BY A.D. Fredieu TITLE Asst. Ops. Super TELEPHONE 635-6094 X2557 3

MONTH October 1985 5

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

0 17.

0 2.

0 18.

0 3.

0 19.

0 4.

0 20.

0 5.

0 21.

0 6.

0 22.

0 7.

0 23.

0 8.

0 24.

0 9.

0 25.

0 10.

0 26.

0 11.

0 27.

0 12.

0 28.

0 13.

0 29.

0 14.

0 30.

0 15.

0 31.

0 16.

0 7

8601090142 851031 PDR ADOCK 05000458 R

PDR k

[

~

UNIT SHUTDOWNS AND POWER REDUCTIONS

=t l

TIME TIME START REC 0VER j

OF FROM DURATION TYPE REASON METHOD NO DATE OCCURANCE OCCURANCE (HOURS)

NOTE (1)

NOTE (2)

NOTE (3)

CORRECTIVE ACTIONS /COMENTS 1

i l

I SU MARY: None/ River Bend has achieved Initial Criticality, but has not exceeded 5% power. Therefore, there has been no power reduction greater than or equal to 20% or any loss of generation.

~

NOTE (1) TYPE OF OCCURANCE: ENTER CODE DOCKET NO. 50/458 F:

FORCED

~

RIVER BEND STATION UNIT 1 S: SCHEDULED REPORT NO.

R-85-003 i

NOTE (2) REASON FOR OCCURANCE: ENTER CODE A: EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMENTS)

REPORT MONTH October B: MAINTENANCE OR TEST C: REFUELING DATE 11/04/85 4

D: REGULATORY RESTRICTION I

E: OPERATOR TRAINING AND LICENSE EXAMINATION Anthony O. Fredieu j

F: ADMINISTRATIVE CurrLtitu BY (PRINT)

G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS /COMENTS)

<w (J 6[,,/,A Mg H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS /COMENTS)

/

i y

MTURE

  1. Apy.

'I NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER:

ENTER CODE 1: MANUAL Assistant Operations Supervisor 2: MANUAL SCRAM TITLE i

3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

TELEPHONE 635-6094 X2557 i

i

-50M-024

~

4 DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-85-003 DATE 11-11-85 COMPLETED BY J. H. Simmons 90 dd TITLE Reactor Engineer TELEPHONE (504) 635-6094 xz315 Page 1 of Attachment III OPERATING STATUS 0000 2400 1.

REPORTING PERIOD: 10-1-85 10-31-85 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt):

144.7 MAX. DEPEND. CAPACITY (MWe-Net):

0 DESIGN ELECTRICAL RATING (MWe-Net):

936 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net).

N/A 4.

REASONS FOR RESTRICTION (IF ANY): 5% power license THIS YR TO CUMU-MONTH DATE LATIVE 5.

NUMBER OF H0CRS REACTOR WAS CRITICAL...

20.6 0

20.6 6.

REACTOR RESERVE SHUTDOWN HOURS..........

0 0

0 7.

HOURS GENERATOR ON LINE................

o 0

0 8.

UNIT RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)....O' O

O 10.

GROSS ELECTRICAL ENERGY 'ENERATED (MWH).

G 0

0 0

11.

NET ELECTRICAL ENERGY GENERATED (MWH)...

0 0

0 I

I i

r l

0 i

l

\\

l

\\

i DOCKET NO.

50/458 t

RIVER BEND STATION UNIT 1 i

i REPORT NO.

R-85-003 t

PAGE.

2-

'0F 2-t Attachment III THIS YR M CUW-MONTE DATE LATIVE 12.

REACTOR SERVICE FACTOR........... w/A N/A N/A 13.

REACTOR AVAILABILITY FACTOR...... N/A N/A N/A 14.

UNIT SERVICI FACTOR.............. N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR.........JL N/A N/A 16.

UNIT CAPACITY FACTOR (Using MDC).. N/A N/A N/A 17.

UNIT CAPACITY FACTOR (Usin Design NWe)..............g M /A N/A N/A 18.

UNIT FORCED OUTAGE RATE...........

w/A N/A N/A i

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE AND DUR EACH):

1.

12-13-85 'from 20% power, shutdown from ou,tside controI" room. 3 day outage.

2.

12-29-85 from 35% powr, scram LOOSP, 3 day outage.

3.

02-05-86 plan scram from 100% power, 5 day outage.

4.

03-09-86 scram af ter completion of 100% testing run.

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

e N/A 21.

UNITS IN TEST STAWS (PRIOR TO COMMERICAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A 10-31-85 0037 INITIAL ELECTRICITY 12-07-as ComERCIAL OPERATION

    • Earliest completion of 100': power testing 12/31/85 Latest expected cogletion of 100% power testing 03-31-86

-r

,,e e

n-

-,u-,- -, -,,,

r 1~

4

!S GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFF CE BOX 220 ST FRANCISwLLE. LOUIS 1ANA 70775 ARE A CODE 504 635 6094 348 8651 November 14, 1985 RBG-22,604 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.

Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Scroggins:

River Bend Station - Unit 1 Docket No. 50-458 Please find enclosed three (3) copies

'f Gulf States o

Utilities Company's Monthly Operating Report for

October, 1985 for River Bend Station

- Unit 1.

This report is submitted in accordance with Technical Specifications 6.9.1.6.

Sincerely, Aua --

J. C. Deddens Vice-President River Bend Nuclear Group JEB/

/amg Enclosure cc: Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 U. S. NRC Document Control Desk 9

'\\'