SAFEGU ARDS INFORM ATION Beaver Valley Power Station Shipp6ngport. PA 15077 0004 May 12, 1997 c.
e Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Heaver Valley Power Station, Unit No. I and No. 2 HV-1 Docket No. 50-334, License No. DPR-66 HV-2 Docket No. 50-412, License No. NPF-73 HVPS Physical Security Plan (PSP)
Enclosed is Revision 33 to issue 4 of the Beaver Valley Power Station (BVPS)
Physical Security Plan (PSP) (Base Plan). These changes are being submitted utilizing the criteria described in NRC Generic Letter 95-08. Revision 33 changes include the
]
following:
1.
The removal of the Emergency Director as being authorized to approve the suspension of safeguards measures. This results in a change to Chapter 3 as well as the introductory section of the Base Plan entitled " Emergency Suspension of Safeguards Measures."
2.
Revised Chapter 12 of the Base Plan to identify an exception to the testing requirements for the intmsion alarms of the Unit I and Unit 2 Equipment Hatch vital area doors. This exception shall be when an installed Hardened Delay Barrier is in place and the intrusion alarms are not utilized for secunty.
These changes have been reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)'(2).
]
The enclosed materials are considered proprietary under the provision of 10 CFR l
2.790(d), and Safeguards Information under the provisions of 10 CFR 73.21, and are IpI j thereby exempt from public disclosure.
9705210288 970512 PDR ADOCK 05000334 F.
PDR ENCI.05URES CONTAIN SAFECUARDS DEllVElllNG cd0003 INFORMATION, UPON SEPARATION QllALITY i
THIS P ACE IS DECONTROLLEO
.l[ll[ll ll[lll'l{l[ l ENERGY
....o o..
SAFEGUARDS INFORMATION
e
. SAFEGUARDS INFORMATION p
Beaver Valley Power Station, Unit No. I and No. 2 BVPS Physical Security Plan (PSP)
Page 2
~
If you have any questions concerning this matter, please contact Mr. J. Arias at (412) 393-5203.
Sincerely, Sushil C. Jain Enclosure
_ c:
Addressee (4 copies of enclosure)
Mr. D. M. Kem, Sr. Resident Inspector (w/o enclosure)
Mr. H. J.. Miller, NRC Region I Administrator (2 copies)
- Mr. D. S. Brinkman, Sr. Project Manager (w/o enclosure) f EHCLOSURES CONTAIN SAFECUARDS INFORM ATION.' UPON SEPARATION THIS PAGC IS DEcotlTRott.E0 O
SAFEGUARDS lNFORMATION
-