Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141J534 + (19:33:28, 11 December 2024)
- ML20141J532 + (19:33:29, 11 December 2024)
- ML20141J528 + (19:33:30, 11 December 2024)
- ML20141J529 + (19:33:30, 11 December 2024)
- ML20141J527 + (19:33:31, 11 December 2024)
- ML20141J523 + (19:33:33, 11 December 2024)
- ML20141J522 + (19:33:34, 11 December 2024)
- 3F0897-31, Informs That JW Tinsley,Sop 20623-1,did Not Complete Medical Exam Requirements Due to Ongoing Illness & Therefore Is Unable to Perform Licensed Duties + (19:33:35, 11 December 2024)
- ML20141J518 + (19:33:35, 11 December 2024)
- ML20141J515 + (19:33:36, 11 December 2024)
- 05000461/LER-1997-006-01, Forwards LER 97-006-01 Re Lack of Coordination of 120 Volt non-safe Shutdown Circuit Breakers in Distribution Panels W/Safe Shutdown Circuit Breakers,Causes Plant to Be Outside Design Basis + (19:33:39, 11 December 2024)
- IR 05000295/1986007 + (19:33:44, 11 December 2024)
- ML20141J505 + (19:33:45, 11 December 2024)
- ML20141J507 + (19:33:45, 11 December 2024)
- ML20141J503 + (19:33:47, 11 December 2024)
- ML20141J504 + (19:33:47, 11 December 2024)
- ML20141J501 + (19:33:48, 11 December 2024)
- ML20141J498 + (19:33:51, 11 December 2024)
- ML20141J494 + (19:33:55, 11 December 2024)
- NSD-NRC-97-5115, Forwards Proprietary Rev 1 to WCAP-14326, Experimental Basis for AP600 Containment Vessel Heat & Mass Transfer Correlations. Proprietary Rept Withheld (Ref 10CFR2.790) + (19:33:56, 11 December 2024)
- ML20141J488 + (19:33:56, 11 December 2024)
- ML20141J486 + (19:33:57, 11 December 2024)
- ML20141J483 + (19:33:58, 11 December 2024)
- ML20141J485 + (19:33:58, 11 December 2024)
- ML20141J481 + (19:33:59, 11 December 2024)
- 05000364/LER-1997-003-03, :on 970424,failed to Perform Diesel Generator Surveillance Requirements.Caused by Procedural Inadequacy. Changed Shared Surveillance Schedule to Ensure Testing Will Be Performed for Each Individual Unit + (19:34:04, 11 December 2024)
- ML20141J476 + (19:34:05, 11 December 2024)
- ML20141J474 + (19:34:08, 11 December 2024)
- ML20141J472 + (19:34:09, 11 December 2024)
- AECM-86-0102, Advises That Amend 4 to License NPF-29 Changes to Fire Detection Instrumentation Table 3.3.7.9-1.c.16 Completed & Entered in Tech Specs W/Effective Date of 860404,in Response to NRC 850918 Request + (19:34:10, 11 December 2024)
- ML20141J471 + (19:34:10, 11 December 2024)
- ML20141J466 + (19:34:18, 11 December 2024)
- ML20141J464 + (19:34:19, 11 December 2024)
- 05000285/LER-1997-004, :on 970505,DG Was Outside Design Basis Due to Violation of App R.Mod Was Completed on 970507 to Provide Ability to Isolate CR Located Tachometer from DG-2 Speed Sensing Circuit Prior to Reaching 300 Degrees + (19:34:23, 11 December 2024)
- ML20141J458 + (19:34:24, 11 December 2024)
- ML20141J457 + (19:34:25, 11 December 2024)
- IR 05000029/1997001 + (19:34:27, 11 December 2024)
- ML20141J453 + (19:34:28, 11 December 2024)
- ML20141J446 + (19:34:29, 11 December 2024)
- ML20141J448 + (19:34:29, 11 December 2024)
- ML20141J445 + (19:34:30, 11 December 2024)
- ML20141J444 + (19:34:30, 11 December 2024)
- ML20141J441 + (19:34:31, 11 December 2024)
- NSD-NRC-97-5148, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 970508-0514 + (19:34:33, 11 December 2024)
- ML20141J436 + (19:34:34, 11 December 2024)
- ML20141J433 + (19:34:41, 11 December 2024)
- ML20141J432 + (19:34:41, 11 December 2024)
- ML20141J429 + (19:34:42, 11 December 2024)
- ML20141J427 + (19:34:43, 11 December 2024)
- ML20141J424 + (19:34:47, 11 December 2024)
- HL-5399, Informs That Plant Hatch Will Use IGSCC Examiners Qualified IAW PDI Program & EPRI IGSCC Coordination Plan to Meet Requirements of GL 88-01 & NUREG-0313 + (19:34:48, 11 December 2024)