- Q (bukeIbw Ceva,xmy 11 h Btms k
M,cGwrehurieur Generationik xv1 ment lice ltaident
)
1 L?iOUllegm Frny R<xsd(A1G01iP)
(B1)$7918%
i Haatersnile, NC180iWIU (51)3754309 Ru j
DUKEPOWER May 12, 1997 U.
S. Nuclear Regulatory Commission l
Document Control Desk Washington, D.C.
20555 l
4 6
Subject:
McGuire Nuclear Station Docket Nos: 50-369, 50-370 AT&T Round Cell Battery.- Periodic Update l
t
Dear Sir:
i Pe7 our previous commitment on this issue, please find attached the required periodic update of the dialog between McGuire and the' vendor regarding recovered battery capacity.
following recharge.
If further information is required, please contact Kay L.
Crane, McGuire Regulatory Compliance at (704) 875-4306.
Very truly yours,
/MM.
H.
B.
Barron, Vice President l
McGuire Nuclear Station I
9705280109 970512 PDR ADOCK 05000369-P PDR
/
\\.) ;1*:%::::
m._._
b l
April 9,1997 l
l Mr. MichaelT. Cash
}
Regulatory Compliance McGuire Nuclear Station i
Subject:
' AT&T Round Cell Battery Capacity After Recharge Periodic Update per 12/05/95 Letter to NRC, Commitment #2 4
PIP 0-M95-2131, Corrective Action #12 j
In a letter dated 12/05/95, McGuire committed to periodically inform the NRC of the status of i
. the dialog between McGuire and the vendor regarding recovered battery capacity immediately
{
following recharging. The following is an update status of the dialog:
The issue of recovered capacity is addressed in the User's Council Charter - Expectation #1, sponsored by Arizona Public Service Company. Two maior considerations are addressed in this Expectation:
i i
- Available battery capacity following Performance Test recharge Available battery capacity following an unplanned discharge on-line e.
i A preliminary report addressing Expectation #1 issues has been submitted to the Council. In l
order to address the second bullet of the Expectation, additional testing was required. This j
testing was performed by Charter Power Systems, Inc. in Conshohocken, Pa., in accordance with an approved test plan and direct supervision provided by the User's Council. The test objective was to determine the affect of various levels of" shallow" discharges on returned capacity after recharge. The test scope was expanded to include low specific gravity cells and 3 aged cells from McGuire. The series of dischrage testing, performed during the months of January and February, were concluded on 2/19/97. The test results are being evaluated, but preliminary observations indicate that both high and low specific gravity cells fail to recover full capacity
. after a partial discharge, followed by a subsequent recharge at float potential. In comparison, the low specific gravity cells showed better capacity recovery than high specific gravity cells. Full details of the testing will be included in the final report that should be approved at the next meeting of the User's Council, scheduled for May 15-16,1997 in Phoenix, Arizona.
i mL(
Danny L. Hepler CEN Engineering McGuire Nuclear Station cc: W.N. Matthews K.L. Crane R.W. Pierce File MC-1356.01
-,.,