ML20141J476

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-295/86-07 & 50-304/86-07 on 860324-27.No Violations Noted
ML20141J476
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/18/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20141J480 List:
References
NUDOCS 8604280146
Download: ML20141J476 (2)


See also: IR 05000295/1986007

Text

m- -~

., .

APR 181986

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentimen:

'

This refers to the routine safety inspection conducted by Mr. T. Ploski and

others of this office on March 24-27, 1986, of activities at the Zion Nuclear

Generating Station, Units 1 and 2 authorized by NRC Operating Licenses

No. DPR-39 and No. DPR-48 and to the discussion of our findings with Messrs.

T. Rieck and E. Fuerst and others of your staff at the conclusion of the

inspection.

l

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

'

DR DR . D. Sh er f

G Emergency Preparedness and

l Radiological Protection Branch

!

!- Enclosure: Inspection Reports

l No. 50-295/86007(DRSS);

l No. 50-304/86007(DRSS)

See Attached Distribution

RIIIo

11

RIII

12

RIII

47tr

RIII

f

R I

b( g#

Ploski/kst Allen Williamsen Snel h afer

9 y ves p w ta

9

- _ _ - -- -_ _ -- _ -

- . - .- . . - .

  • :* .

P

Commonwealth Edison Company 2

APR 1 8 1986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

G. Plim1, Station Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

'

,

General's Office, Environmental

Control Division

Mayor, City of Zion

i D. Matthews, EPB, OIE

W. Weavtsr, FEMA, RV

l

l

l

!

!

!

i

l  ?

l

I.