ML20141J466
| ML20141J466 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/21/1986 |
| From: | Spangenberg F ILLINOIS POWER CO. |
| To: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| U-600451, NUDOCS 8604280142 | |
| Download: ML20141J466 (1) | |
Text
,
TM8 O
U-600451 n.
L42-86 (04-21)-L 1A.120 ILLINO/S POWER COMPANY CLINTON POWER STATION. P.O. Box 678. CLINToN. ILLINCIS 61727 April 21, 1986 Mr. W. L. Axelson Chief, Nuclear Material Safety and Safeguards Branch Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Response to the Notice of Violation dated March 21, 1986, in Inspection Report 50-461/86006 (DRSS) and to the Notice of Violation dated April 4, 1986, Inspection Report 50-461/86020 (DRSS).
Dear Mr. Axelson:
This letter is in response to the Notices of Violation in Inspection Reports 50-461/86006 and 50-461/86020. Please see Attachment A to this letter for the details of Illinois Power Company's response concerning the inadequate protection of Safeguards Information documents. Please see Attachment B to this letter for the details of Illinois Power Company's response concerning the inadequate safeguards container.
Illinois Power is currently performing an in-depth analysis of the security system power supply. A separate response addressing the adequacy of the security system power supply will be sent by May 16, 1986.
I trust this response will ensure compliance with regulatory requirements.
Sincerely yours
/
W.
VW F. A. S ang iberg Manager - Licensing and Safety JAB /ckc Attachment cc:
B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office
\\lh b
Illinois Department of Nuclear Safety Director, Office of I&E, USNRC Washington, DC 20555 h
8 APR 2 31986
-