Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141N952 + (19:02:27, 11 December 2024)
- 05000322/LER-1986-009, :on 860217,during APRM Functional Test,Full Reactor Trip Occurred.Caused by Technician Failure to Reset Reactor Protection Sys Trip Signal a Before Initiating Test of Logic Train B.Procedures Being Reviewed + (19:02:28, 11 December 2024)
- 05000322/LER-1986-008, :on 860214,during Surveillance Procedure,Split of Reactor Bldg Closed Loop Cooling Water (RBCLCW) Sys Occurred.Caused by Technician Accidentally Bumping RBCLCW Head Tank B lo-lo Level Switch.Procedure Revised + (19:02:33, 11 December 2024)
- 05000322/LER-1986-007, :on 860212,split of Reactor Bldg Closed Loop Cooling Water (RBCLCW) Into Accident Configuration Occurred Due to lo-lo RBCLCW Head Tank a Level.Caused by Inadequate Station Procedure for Filling Hxs.Procedure Being Revised + (19:02:35, 11 December 2024)
- PM-86-064, Forwards LERs 86-007,86-008 & 86-009 + (19:02:36, 11 December 2024)
- ML20141N945 + (19:02:37, 11 December 2024)
- 05000454/LER-1986-009, :on 860222,during Cold Shutdown,Containment Vent Isolation Occurred Due to Undervoltage Condition at Radiation Monitors 1RT-AR011 & 1RT-AR012.Caused by Voltage Transient on 345 Kv Distribution Sys + (19:02:39, 11 December 2024)
- 05000267/LER-1986-013, :on 860212,Surveillance SR 5.2.7a1-A/5.3.4a1-A, Originally Scheduled on 850120,performed.Caused by Personnel Error.Shift Supervisors Instructed to Identify Specific Operational Limits When Rescheduling + (19:02:41, 11 December 2024)
- ML20141N941 + (19:02:42, 11 December 2024)
- ML20141N939 + (19:02:43, 11 December 2024)
- ML20141N940 + (19:02:43, 11 December 2024)
- ML20141N938 + (19:02:44, 11 December 2024)
- ML20141N933 + (19:02:45, 11 December 2024)
- IR 05000508/1986002 + (19:02:46, 11 December 2024)
- 05000339/LER-1986-002-02, :on 860220,during Mode 3,reactor Tripped on source-range Neutron Detectors N-35 & N-36 High Flux.Cause Unstated.Detectors Returned to Svc.Investigation Continuing + (19:02:48, 11 December 2024)
- ML20141N930 + (19:02:49, 11 December 2024)
- ML20141N925 + (19:02:50, 11 December 2024)
- ML20141N926 + (19:02:50, 11 December 2024)
- ML20141N923 + (19:02:51, 11 December 2024)
- 05000331/LER-1986-004, :on 860212,RWCU Sys Isolated Due to High Differential Temp Indication.Caused by Minor Degradation of Manual Valves on Vent & Drain Lines of Regenerative HX A. Valves Tightened + (19:02:53, 11 December 2024)
- 05000269/LER-1986-003-02, :on 860208,discovered That Effluent Grab Sample from Chemical Treatment Pond 3 Missed.Caused by Personnel Oversight & Misentry Into Log Book.Personnel Counseled. Procedures Will Be Clarified + (19:02:55, 11 December 2024)
- ML20141N919 + (19:02:57, 11 December 2024)
- ML20141N917 + (19:02:57, 11 December 2024)
- ML20141N914 + (19:02:58, 11 December 2024)
- ML20141N913 + (19:02:58, 11 December 2024)
- ML20141N911 + (19:02:59, 11 December 2024)
- IR 05000346/1986011 + (19:03:00, 11 December 2024)
- ML20141N910 + (19:03:00, 11 December 2024)
- ML20141N907 + (19:03:01, 11 December 2024)
- ML20141N906 + (19:03:01, 11 December 2024)
- ML20141N901 + (19:03:02, 11 December 2024)
- ML20141N905 + (19:03:02, 11 December 2024)
- ML20141N900 + (19:03:03, 11 December 2024)
- ML20141N899 + (19:03:04, 11 December 2024)
- ML20141N898 + (19:03:04, 11 December 2024)
- ML20141N896 + (19:03:05, 11 December 2024)
- ML20141N895 + (19:03:06, 11 December 2024)
- ML20141N892 + (19:03:07, 11 December 2024)
- ML20141N891 + (19:03:07, 11 December 2024)
- U-600462, Final Deficiency Rept 55-85-15 Re Classification of Instrument Lines Connected to Rcpb.Initially Reported on 851227.Review Determined That Deficiency Not Reportable Per 10CFR50.55(e) + (19:03:08, 11 December 2024)
- ML20141N888 + (19:03:09, 11 December 2024)
- ML20141N889 + (19:03:09, 11 December 2024)
- ML20141N887 + (19:03:10, 11 December 2024)
- ML20141N886 + (19:03:11, 11 December 2024)
- AECM-86-0019, Forwards Metallurgical Evaluation of Recirculation Piping Ctr Cross Surface Cracking Following Induction Heat Stress Improvement,Grand Gulf Nuclear Station - Unit 1, Final Rept + (19:03:12, 11 December 2024)
- PNO-III-86-019, on 860307,licensee Began Unscheduled 16-day Shutdown to Replace Degraded Seals in Two Primary Coolant Pumps.Repair of Leaking Loop Isolation Check Valve & Pressure Control Valves Also Planned + (19:03:12, 11 December 2024)
- ML20141N881 + (19:03:13, 11 December 2024)
- ML20141N880 + (19:03:14, 11 December 2024)
- ML20141N879 + (19:03:15, 11 December 2024)
- ML20141N875 + (19:03:15, 11 December 2024)
- ML20141N873 + (19:03:16, 11 December 2024)
- ML20141N870 + (19:03:17, 11 December 2024)