OPER7. TING D.;TA REPORT DOCKET NO. 50-293 DATE 3/13/86 COMPLETED DY P, Hamilton l TELEPHONE (b17)746-7900 OPERATING STATUS

1. Unit Name Pilgrim 1 __

Notes

2. Reporting Period February 1906 l
3. Licensed Thermal Power (MWt) 1998
4. Nameplate Rating (Gross MWo) 678
5. Design Electrical Rating (Not MWe) 655
6. Maximum Dependablo Capacity (Gross MWo) 690
7. Maximum Dopondablo Capacity (Not MWo) 670
8. If Changos Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Nono

9. Power Lovel To Which Restristed, If Any (Not MWo)_ Nono
10. Reasons for Rostrictions, If Any ___ N/A This Month Yr-to-Dato Cumulative
11. Hours In Reporting Porlod 672,0 1416,0 115920.0
12. Number Of Hours Reactor Was Critical 672,0 1327,5 79403.1
13. Roactor Reserve Shutdown Hours 0,0_ 0,0 0,0 ,
14. Heurs Generator On-Lino 672,0 1301,0 76804,3 15, Unit Reservo Shutdown Hours 0,0, 0,0 0,0
16. Gross Thermal Energy Generated (MWH) 1317696.0 2509104,0 134414560_,0
17. Cross Electrical Energy Generated (MWH)

_456850,0_ 868010,0 _45245414.0 lo, Not Electrical Energy Generated (MWH) 439790,0 036230,0 .43404120,0 19 Unit Service factor 100,0 91.9 66,3

20. Unit Availability factor _ 100.0_ _ 91.9 66.3, 21 Unit Capacity Factor (Using M00 Not) 97,7 88.1 56,0
22. Unit Capacity factor (Using DER Not) 99.9 90,2 57.3
23. Unit forced Outago Rato 0 , 0_ _ 39 1 99 1
24. Shutdowns Scheduled Over Nont 6 Months (Type, Date, and Duration of Each):

Ngne

25. If Ghut Down At End Of Report Pariod, Estimated Date of Startup -
26. Units In Test Gtatus (Prior to Commarcial Operation):

Forecast Achieved INITIAL CRITICALITY INIIIAL ELECTRICITY __ __.

COMMERCIAL OPERATION ___

(9/77) 0603100335 060;uu PDR ADOCK 05000293 R PDH ,

$d lI t

AVERAGE DEILY UNIT POWER LEVEL DOCKET NO. 50-293 UNIT Pilgr_im 1 DATE _ 3/13/86 COMPLETED BY P. Hamilton y, TELEPHONE _(617)746-7900 MONTH _ February 1986 _

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

, (MWe-Net) (MWe-Net) 1 l

1 668, 17 580.

, 2 667. 18 668. '

3 651, 19 667.

I 4 668, 20 668.

5 668, 21 659. .. ,

6 668. _

22 _ _ _ 667. 1-7 668. 23 __ 666.

8 667. 24 667, l

9 666. 25 667.

l ,

l

, 10 667, 26 667. -

11 666. 27 667.

12 667. __

28 668.

! 13 667.

l 14 664.

l l 15 667 l 16 426. _

l l

r l This format, lists the average daily unit power level in MWe-Net for each day t

in the reporting month, computed to the nearest whole megawatt, i

~

REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo, dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

L

1. The name of this facility is pilgrim Nuclear Power Station, Docket Number 50-293.
2. Scheduled date for next Refueling Shutdown: September 1986
3. Scheduled date for restart following refueling: November 1986
4. Due to their similarity, requests 4, 5, & 6 are responded to collectively under //6:
5. See #6.
6. The new fuel, which was loaded during the 1983-84 refueling outage, is of the same P8x8R design, as loaded the previous outage and consists of 160 P8DR8282 assemblies. In addition, 32 GE60-P8DR0282 assemblies were also loaded.
7. (n) There are 500 fuel assemblies in the core.

l (b) Thore are 1,128 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. The actual usable spent fuel storage capacity is 2320 i fuel assemblies.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1192 fuel assemblies.

l

\ f 4

BOSTON EDISON COMPANY PILGR1M NUCLEAR POWER STATION DOCKET NO. 50-293 Operational Summary for Feburary 1986 t,

The month commenced with the unit at full power. Power was reduced to an average daily level of 97% on the third in response to inoperable isolated phase bus y cooling fans. From the fourth through the fifteenth, the unit was operated between

, 99% and 100% power.

3 On the sixteenth power was reduced to an average daily level of 64% to backwash the main condenser and perform a control rod pattern change. Power level was increased on the seventeenth and from the eighteenth through the twentieth was maintained between 99% and 100%. At approximately 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> on the twentieth a controlled shutdown was initiated in response to the standby liquid control system being  !

potentially inoperable. This reduced the average daily power level to 98%. The l shutdown was terminated on the twenty first and from the twenty first through the end of the month the unit was operated between 99% and 100% power.

An unusual event was declared on 2/14/86, when the "A" emergency diesel and a LPCI injection valve were simultaneously out of service for approximately two hours.

5

/

l Safety Relief Valve Challenges Month of February 1986 I

P l

There were no safety relief valve challenges during the month.

i b

i 4

3

~..

UNIT' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-293~

UNIT NAME Pilgrim 1 DATE. 3/13/86 COMPLETED BY P. Hamilton '

TELEPHONE (617) 746-7900 REPORT MONTH February 1986 METHOD OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPEl (HOURS) REASON 2 DOWN REACTOR 3 REPORT # CODE 4 CODE 5 PREVENT RECURRENCE 09 2/10/86 - S 0.0 8 5 N/A N/A N/A Reduced power for condenser ,

backwash and control rod pattern change.

1 2 2 3 4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H4ther 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued .

Data Entry Sheet

, E-Operator Training 5-Reduced Load Licensee Event Report

, & License Examination 9-Other (LER) File (NUREG-1022)

I Month February 1986 PILGRIM NUCLEAR POWER STATION l MAJOR SAFETY RELATED MAINTENANCE l

CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT ASSOCIATED RECURRENCE LER l

l Standby Explosive Potentially Failure to Test Per Procedure Counsel 86-004 tIquid Valves Inoperable Follow personnel to be issued l

Control Procedure l

l Electrical Breaker Did not trip See LER 86-003 See LER 86-003 See LER 86-003 66-003 Power 2016B (caused loss to be issued System of safety bus B-20).

HPCI Control Bonnet Aging Replaced Gasket Routine N/R Valve Leak Maintenance HPCI Steamchest Flange Aging Replaced Gasket Routine N/R l Leak Maintenance i

l SSW "D" Pump Insufficient Wear Rebuild Pump Routine N/R Discharge Preventive Head Maintenance O

O 9

e e BCSTON E005DN COMPANY B00 50YLaTON STREET 30sTON M AssACHusETTG O2199 WILLIAM D. HARRINGTON m,,...............

aa === March 13,1986 BEco Ltr. #86-031 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk License No. DPR-35 Docket No. 50-293 1

Subject:

February 1986 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9. A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectfully submitted, a

W. D. Harrington h PJH: caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 n