Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148C102 + (17:11:23, 11 December 2024)
- 1CAN038805, Requests 60-day Extension to 880501 for Submittal of Addl Info Re Comparison of Design Liner Strains Versus Calculated Liner Strains at Elevated Reactor Bldg Temp + (17:11:24, 11 December 2024)
- ML20148C100 + (17:11:24, 11 December 2024)
- ML20148C093 + (17:11:25, 11 December 2024)
- ML20148C095 + (17:11:25, 11 December 2024)
- ML20148C092 + (17:11:26, 11 December 2024)
- B16418, Responds to 970411 NRC Ltr Re Violations Noted in Insp Repts 50-245/97-01,50-336/97-01 & 50-423/97-01.Corrective Actions: Implemented Steps to Reinforce Mgt Expectations Re RCA Entry,Protocol & Dosimetry Requirements at Unit 2 + (17:11:27, 11 December 2024)
- ML20148C090 + (17:11:27, 11 December 2024)
- ML20148C086 + (17:11:28, 11 December 2024)
- PNO-I-87-108B, on 871118,FBI Arrested Six Individuals Accused of Drug Distribution at Plant.Based on Util Review of Info from trial,16 People Were Implicated.Util Terminated Four Employees & Intends to Terminate Seven Other Employees + (17:11:29, 11 December 2024)
- ML20148C085 + (17:11:29, 11 December 2024)
- ML20148C081 + (17:11:30, 11 December 2024)
- ML20148C083 + (17:11:30, 11 December 2024)
- ML20148C078 + (17:11:31, 11 December 2024)
- IR 05000309/1997001 + (17:11:32, 11 December 2024)
- ML20148C075 + (17:11:32, 11 December 2024)
- ML20148C071 + (17:11:33, 11 December 2024)
- ML20148C072 + (17:11:33, 11 December 2024)
- ML20148C067 + (17:11:34, 11 December 2024)
- ML20148C064 + (17:11:35, 11 December 2024)
- ML20148C065 + (17:11:35, 11 December 2024)
- ML20148C063 + (17:11:36, 11 December 2024)
- ML20148C062 + (17:11:36, 11 December 2024)
- ML20148C060 + (17:11:37, 11 December 2024)
- ML20148C059 + (17:11:38, 11 December 2024)
- ML20148C058 + (17:11:39, 11 December 2024)
- ML20148C057 + (17:11:40, 11 December 2024)
- ML20148C054 + (17:11:41, 11 December 2024)
- ML20148C053 + (17:11:41, 11 December 2024)
- ML20148C050 + (17:11:42, 11 December 2024)
- ML20148C047 + (17:11:43, 11 December 2024)
- ML20148C046 + (17:11:43, 11 December 2024)
- ML20148C044 + (17:11:44, 11 December 2024)
- ML20148C041 + (17:11:45, 11 December 2024)
- ML20148C043 + (17:11:45, 11 December 2024)
- ML20148C039 + (17:11:47, 11 December 2024)
- ML20148C038 + (17:11:47, 11 December 2024)
- ML20148C037 + (17:11:48, 11 December 2024)
- ML20148C032 + (17:11:49, 11 December 2024)
- ML20148C029 + (17:11:49, 11 December 2024)
- ML20148C028 + (17:11:50, 11 December 2024)
- PY-CEI-NRR-0819, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-13.Corrective Actions:Engineering Evaluations Performed for Each Concern Which Reverified Qualification of Subj Equipment.Civil Penalty Paid + (17:11:51, 11 December 2024)
- ML20148C025 + (17:11:52, 11 December 2024)
- ML20148C026 + (17:11:52, 11 December 2024)
- ML20148C024 + (17:11:53, 11 December 2024)
- 05000338/LER-1988-003-03, :on 880216,emergency Equalizing Valves for Containment Isolation Inner Air Lock Escape Doors Discovered Not Adequately Tested.Caused by Incorrect Procedure in Vendor Manual.Test Satisfactorily Performed + (17:11:56, 11 December 2024)
- ML20148C019 + (17:11:57, 11 December 2024)
- ML20148C020 + (17:11:57, 11 December 2024)
- 05000312/LER-1979-022-01, /01T-0:on 791217,Allis Chalmers Informed Util of Potential Problem W/Purge Valves & Recommended Limiting Valve Opening to Max of 60 Degrees Because Excess of 60 Degrees Could Cause Shaft Torsional Rating to Be Extended + (17:11:59, 11 December 2024)
- ML20148C016 + (17:12:00, 11 December 2024)
- 05000456/LER-1988-007, :on 870215,unit Entered Mode 4,on 880218,pumps 1B,2A & 2B Declared Inoperable Due to Discovery That Lower Motor Bearing Vibration Readings for RHR Not Current.Caused by Programmatic Deficiency + (17:12:02, 11 December 2024)