Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148N422 + (15:56:21, 11 December 2024)
- ML20148N417 + (15:56:22, 11 December 2024)
- 05000302/LER-1997-002, :on 970129,out-of-calibr Fuel Storage Pool Water Level Transmitters Invalidated TS Surveillance.Caused by Lack of Commitment to & Mgt Oversight of Preventive Maint Program.Night Order Was Issued + (15:56:24, 11 December 2024)
- ML20148N411 + (15:56:25, 11 December 2024)
- IR 05000312/1978015 + (15:56:28, 11 December 2024)
- ML20148N404 + (15:56:28, 11 December 2024)
- ML20148N401 + (15:56:29, 11 December 2024)
- ML20148N390 + (15:56:30, 11 December 2024)
- ML20148N384 + (15:56:31, 11 December 2024)
- ML20148N386 + (15:56:31, 11 December 2024)
- ML20148N383 + (15:56:32, 11 December 2024)
- B16519, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 2 + (15:56:33, 11 December 2024)
- ML20148N379 + (15:56:33, 11 December 2024)
- ML20148N372 + (15:56:34, 11 December 2024)
- 05000259/LER-1988-011-02, :on 880304,three Emergency Equipment Cooling Water Pumps Inadvertently Started Due to Pressure Drop in Raw Cooling Water Sys.Caused by Personnel Error in Not Performing Valve Lineup.Personnel Counseled + (15:56:36, 11 December 2024)
- ML20148N367 + (15:56:37, 11 December 2024)
- ML20148N365 + (15:56:38, 11 December 2024)
- 05000456/LER-1997-006-05, :on 970522,TS 3.0.3 Was Entered & Unit 1 Cooled Down Due to ECCS Venting Issue.Caused by Mgt Deficiency. Weekly Ultrasonic Exams of Piping Will Be Performed Until TS Is Changed + (15:56:40, 11 December 2024)
- ML20148N355 + (15:56:41, 11 December 2024)
- ML20148N347 + (15:56:42, 11 December 2024)
- ML20148N340 + (15:56:43, 11 December 2024)
- ML20148N333 + (15:56:45, 11 December 2024)
- 05000266/LER-1997-025, :on 970520,pressurizer Level Was Controlled Higher than Assumed in Accident Analysis.Caused by Inappropriately Changing Procedures W/O Adequate Consideration.Listed Affected Procedures Will Be Revised + (15:56:46, 11 December 2024)
- ML20148N326 + (15:56:48, 11 December 2024)
- ML20148N322 + (15:56:49, 11 December 2024)
- ML20148N309 + (15:56:50, 11 December 2024)
- 05000456/LER-1997-003-06, :on 970524,manually Opened Reactor Trip Occurred Due to Improper Rod Bank Overlap.Caused by Failure of Thumbwheel Switches Due to Dirty Contacts.Stopped Rod Motion,Cleaned Contacts & Revised Procedure + (15:56:52, 11 December 2024)
- IR 05000312/1978017 + (15:56:53, 11 December 2024)
- ML20148N298 + (15:56:53, 11 December 2024)
- ML20148N296 + (15:56:54, 11 December 2024)
- ML20148N287 + (15:56:55, 11 December 2024)
- ML20148N280 + (15:56:56, 11 December 2024)
- 05000327/LER-1997-009-02, :on 970521,failed to Perform Response Time Testing of Containment Radiation Monitor Following Maint Activities.Caused by Misinterpretation of Surveillance Requirements.Tested Radiation Monitor + (15:56:58, 11 December 2024)
- ML20148N278 + (15:56:59, 11 December 2024)
- ML20148N275 + (15:56:59, 11 December 2024)
- ML20148N271 + (15:57:04, 11 December 2024)
- ML20148N268 + (15:57:04, 11 December 2024)
- ML20148N257 + (15:57:05, 11 December 2024)
- ML20148N256 + (15:57:06, 11 December 2024)
- ML20148N251 + (15:57:08, 11 December 2024)
- ML20148N249 + (15:57:08, 11 December 2024)
- IR 05000361/1978014 + (15:57:09, 11 December 2024)
- ML20148N244 + (15:57:10, 11 December 2024)
- ML20148N238 + (15:57:11, 11 December 2024)
- ML20148N240 + (15:57:11, 11 December 2024)
- ML20148N231 + (15:57:12, 11 December 2024)
- ML20148N235 + (15:57:12, 11 December 2024)
- ML20148N228 + (15:57:13, 11 December 2024)
- ML20148N224 + (15:57:14, 11 December 2024)
- ML20148N215 + (15:57:22, 11 December 2024)
- ML20148N213 + (15:57:22, 11 December 2024)