ML20148N213
| ML20148N213 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/12/1978 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20148N218 | List: |
| References | |
| NUDOCS 7811270039 | |
| Download: ML20148N213 (2) | |
Text
-
n W
y &+&
4 Mch UNITED STATES o
NUCLEAR FEGULATORY v v1 MISSION
/ [hh
[
REGION 1i n
5, 611 RYAN Pl.AZA Dr -
SUITF " 9 AH LIN GT ON, o,
s*****/
< ctober 12, 1978 In Repiy ifer To:
RIV Docket No. 50-445 50-446 1
Texas !'tilities Generating Company l
ATTN: Mr. R. J. Gary Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 l
Gentlemen:
This refe.s to the inspection activities perfonned by our resident in-spector, Mr. R. G. Taylor, of activities authorized by NRC Construction Permit Nos. CPPR-126 and 127 for the Comanche Peak Steam Electric Station, Units 1 and 2, and to the discussion of the findings by the inspector with members of you; staff on October 5,1978.
During the inspection, it was found that certain activities under your j
license appear to be in noncompliance with Part 50, Title 10, of the l
Code of Federal Regulations. The item of noncompliance and references l
to the pertinent requirements are identified in the enclosed Notice of l
V' tion.
Details of this item will be included in an inspection re-l be issued in the near future and identified as Inspection Report 1
t 445/78-16; 50-446/78-16.
i
. ice is sent to you pursuant to the provisions of Section 2.201 NRC's " Rules of Practice," Part 2, Title 10, Code of Federal utions.
Section 2.201 requires you to submit to this office, with-
.0 days of your receipt of this notice, a written statement or expla-
. ion in reply 'ncluding: (1) corrective steps which have been taken by ou, and the results achieved; (2) corrective step; which will be taken I
co avoid further noncompliance; and (3) the date when full compliance will be achieved.
g8117.7 co Pt
Texas Utilities Generati.ng Company October 12, 1978 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, -
f fN
~
W. C. S(i)dle, Chief Reactor Construction and Engineering Support Branch
Enclosure:
Appendix A, Notice of Violation cc: w/ enclosure Texas Util.ities Generating Company ATTN: Mr. h. C. Schmidt, Project Manager 2001 Bryan lower Dallas, Texas 75201 9
.