ML20148N322
| ML20148N322 | |
| Person / Time | |
|---|---|
| Site: | 07100201 |
| Issue date: | 11/01/1978 |
| From: | Snyder E BLAW KNOX CORP. (FORMERLY DURALOY BLAW-KNOX, INC.) |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 7811270068 | |
| Download: ML20148N322 (6) | |
Text
.
3 i.'
g DURALOY BLAW-KNOX, INC.
One of the V/hite ConsohhtedIndustries W.: :. C La$,,8A,.
m eo uw m n m ', no,m
.,,7,,,,3,00 15683 Telex: 86-6665 DURALOY SCDA tag g,i */
l3j ll gg g,g,'<
_~ 2 0.
\\ g,d, o,
S
'q C
NHbembd II,0gg73 (s
cocKETED USNRC
..- )
~D gov 0 71978 " g wass Director g
gAtt SECTION Office of Nuclear Material Safety and Safeguards cocKET CLERK y
United States Nuclear Regulatory Commission 4
r3 Washington, DC 20555 g
Dear Sir:
As required by'10CFR, Part 71.51, you will find enclosed a description of our Quality Assurance Program for Packaging of Radioactive Materials for Trans-port.
Very truly yours, DURALOY BLAW-KN0X, INC.
0 Endm 9w Emanuel M. Snyder Radiation Safety Officer EMS: mis l
/..
HEAT. CORROSION AND ABRASION RESISTANT CASTINGS. TUBING AND ASSEM3UES
.;ol C
k October 30, 1978 DURALOY BLAW-KNOX, INC.
Scottdale, Pennsylvania l
L l
QUALITY ASSURANCE PROGRAM FOR PACKAGING OF RADIOACTIVE MATERIALS FOR TRANSPORT 1.
Organization The final responsibility for the Quality Assurance Program for Part 71.of 10 CFR, U.S. Nuclear Regulatory Commission Rules 1
and Regulations rests with Duraloy Blaw-Knox, Inc. Designing and fabrication of radioactive material shipping packages shall not be conducted under this Quality Assurance Program.
The attached chart shows the formal Quality Assurance organi-zation. The Radiation Safety Officer is responsible for over-all administration of the program, training and-certification, document control and auditing. The radiographers are responsi-ble for handling, storing, shipping, inspection, test, operating status and recordkeeping.
2.
Quality Assurance Program The management of Duraloy.Blaw-Knox, Inc. has established and implemented the Quality Assurance Program and attached it to the operating and emergency procedures asSection XI (10/29/78 revision date).
a.
Training Training in all the Quality Assurance functions must be completed prior to performing any of these functions according to written procedures.
b.
Quality Assurance revisions will be made according to written procedures by the Radiation Safety Officer and management approval.
Quality Assurance Program includes documentation from the l
c.
vendors stating that the necessary certification of I
engineering procedures and specific provisions of the package design approval are satisfied. The Radiation Safety Officer shall be responsible for obtaining necessary document from vendor.
d.
Quality Assurance Program will emphasize control of the characteristics of the package which are critical to safety. (
1 3
3.
Document Control z
All documents related to a specific shipment-(shipping or receiving) will be reviewed by the Radiation Safety Officer a.
for completeness.
The Radiation Safety Officer shall insure that all Quality Assurance functions are conducted in accordance with b.
the latest applicable documents.
Handling, Storage Shipping and Receiving 4.
Written safety procedures concerning the handling, storage, shipping and receiving of packages for applicable special a.
form radioactive material will be followed.
Shipments will not be made unless all tests, certifications, acceptances, and final inspections have been completed.
b.
Work instructions will be provided for handling, storage, shipping and receiving operations.
c.
Radiography personnel shall perform the following:
d.
Receiving,. handling, and storage of all radioactive (1) materials.
Necessary critical sealing and shipping preparations.
(2)
Inspection, Test and Operating Status 5
Inspection, test and operating status of packages for applicable special form radioactive material will be a.
indicated and controlled by written procedures.
To verify conformance with the documented instructions.
b.
Status of nonconforming packages will be positively main-c.
tained by written procedures.
Radiography personnel shall perform the required inspec-tions and tests in accordance with written procedures.
d.
The Radiation Safety Officer shall insure that these functions are performed.
6.
Quality Assurance Records _
Records of package approsals, inspections, tests, operating logs, audit results, personnel training and qualifications a.
and records of shipments will be maintained..
'o 7.
Audits Established schedules of audits of the Quality Assurance a.
Program will be performed using written checklists.
b.
Results of audits will be maintained and reported to management, Audit reports will be-evaluated and deficient areas cor-c.
rected.
d.
The audits will be dependent on the safety significance of the activity being audited, but each activity will be
. audited at-least once.
Audit reports will be maintained as part of the Qualtiy e.-
Assurance records.
4*ttv_')>__. W /
Emanuel M. Snyder Radiation Safety Officer EMS: mis cc:
T. R. Heyward, III E. M. Barrs J. L. Williams R. B. Heyward -
October 26, 1975 DURALOY DIEi-KNOX, INC.
(Duraloy Division)
CORPORATE CORPORATE CORPORATE-VICE PRESIDENT EXECUTIVE VICE PRESIDENT AND CONTROLLER VICE PRESIDENT INDUSTRIAL RELATIONS VICE PRESIDENT PRESIDENT.
DIRECTOR OF FINANCE AND INDUSTRIAL RELATIONS C.E.O.
C. C.,KESSLER T. R. HEYWARD, III J. E. FLYNN,
Pg. 12 Pg. 11 SECRETARY M. B. SNYDER EXECUTIVE VICE PRESIDENT AND C.0.0.
E. R. BELLOWS i
I VICE PRESIDENT VICE PRESIDENT
-CHIEF SALES MANUFACTL"rtING METALLURGIST 1
D. H. RANDOLPH R. B. HEYWARD E. M. BARRS
~
Pg. 3 Pg. 4 Pg. 2 Page 1.
.~
DURALOY BLAWK;'OX, INCo October 26, 1978 (Duraloy Division)
Chief Metallurgist xxxxxx.ux.uxxxxx.ux_uxxxxxxxmxxxxxn3x X
X E. M. Barrs xxxx Xxxx X
Manager Supervisor N
Quality Assurance Metallurgical N
(R.S.O.)
Engineering y
and R. & D.
xx
- r..,n,. Snyder.
_,, A.
>j 1.n.
M M
X X
X Radiographic Dept.
Chief Chemist Chief Malter F. K. Zearley J. R. Nist Chief Inspector J. L. Williams xxx Advisory (Technical)
Sand Control R. & D.
Technician Laboratory Technician R. L. Sultzer D. C. Helms Page 2.
t