Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JAFP-88-0099, Responds to NRC Compliance Bulletin 87-002.All safety- Related & Nine non-safety Related Fasteners within Required Specs.Specs for Three non-safety Related Fasteners Not Met, Listed.Supporting Info Encl + (15:11:06, 11 December 2024)
- ML20149D609 + (15:11:07, 11 December 2024)
- 05000498/LER-1987-022, :on 871206,control Room Toxic Gas Monitors Inoperable.Caused by Inadequate Training Program for Toxic Gas Monitoring Sys Operation & Channel Checks.Monitor Operation Training & Logging Procedure Planned + (15:11:11, 11 December 2024)
- ML20149D606 + (15:11:12, 11 December 2024)
- ML20149D605 + (15:11:13, 11 December 2024)
- ML20149D599 + (15:11:14, 11 December 2024)
- ML20149D603 + (15:11:14, 11 December 2024)
- ML20149D596 + (15:11:16, 11 December 2024)
- ML20149D597 + (15:11:16, 11 December 2024)
- ML20149D593 + (15:11:17, 11 December 2024)
- ML20149D591 + (15:11:18, 11 December 2024)
- ML20149D588 + (15:11:19, 11 December 2024)
- ML20149D589 + (15:11:19, 11 December 2024)
- IR 05000293/1993014 + (15:11:25, 11 December 2024)
- ML20149D583 + (15:11:27, 11 December 2024)
- ML20149D582 + (15:11:28, 11 December 2024)
- ML20149D579 + (15:11:29, 11 December 2024)
- PNO-III-93-052, on 930914,reactor Scram & Concurrent Loss of Offsite Power Occurred Caused by Failure of Station Auxiliary Transformer.Power Was Supplied & Two of Three Emergency Diesels Restored to Standby Condition + (15:11:30, 11 December 2024)
- ML20149D576 + (15:11:30, 11 December 2024)
- ML20149D571 + (15:11:31, 11 December 2024)
- ML20149D567 + (15:11:32, 11 December 2024)
- ML20149D568 + (15:11:32, 11 December 2024)
- PNO-V-87-085A, on 880104,State of Wa Reported That Contamination Caused by Vehicle Accident Cleaned Up & Stevens Highway Reopened on 871231.Contaminated Debris & Irradiated Hardware Being Repackaged by Us Ecology,Inc + (15:11:33, 11 December 2024)
- 05000309/LER-1988-001, :on 880105,unscheduled Reactor Trip Occurred on Loss of Load Following Main Turbine Trip.Caused by Heater Drain Tank Low Level Switch Failure Due to Corrosion of Switch Float.Switch & Float Replaced on 880105 + (15:11:35, 11 December 2024)
- ML20149D561 + (15:11:36, 11 December 2024)
- IR 05000295/1993017 + (15:11:38, 11 December 2024)
- W3P88-0171, Forwards Payment of Indemnity Fee for 880209-890208,as Documented in Encl Invoice + (15:11:39, 11 December 2024)
- ML20149D558 + (15:11:39, 11 December 2024)
- ML20149D553 + (15:11:40, 11 December 2024)
- ML20149D551 + (15:11:41, 11 December 2024)
- IR 05000344/1987042 + (15:11:43, 11 December 2024)
- ML20149D547 + (15:11:44, 11 December 2024)
- ML20149D548 + (15:11:44, 11 December 2024)
- RBG-27379, Advises That Util Will Provide Suppl 6 to Startup Rept Before 880215 + (15:11:45, 11 December 2024)
- ML20149D543 + (15:11:46, 11 December 2024)
- ML20149D542 + (15:11:46, 11 December 2024)
- ML20149D539 + (15:11:47, 11 December 2024)
- ML20149D540 + (15:11:47, 11 December 2024)
- ML20149D537 + (15:11:48, 11 December 2024)
- IR 05000334/1993016 + (15:11:56, 11 December 2024)
- ML20149D534 + (15:11:57, 11 December 2024)
- PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power + (15:11:57, 11 December 2024)
- IR 05000298/1987029 + (15:12:00, 11 December 2024)
- 05000423/LER-1988-003, :on 880116,emergency Diesel Generator Train B Started Due to Bumped Relay Allowing Test Signal to Commence Emergency Load Sequencing.Caused by Relay Failure.Procedures Changed to Remove Dependency on Relay + (15:12:02, 11 December 2024)
- TXX-8812, Final Deficiency Rept CP-88-23 Re Design Groundwater Elevation.Initially Reported on 880121.Analysis to Validate Design of Category I Structures Completed & Design Mods to Prevent or Mitigate Leakage Due to Surface Runoff Planned + (15:12:04, 11 December 2024)
- PNO-IV-88-002, on 880105,transportation Accident Involving Associated Couriers Truck/Trailer Carrying 84 Spent molybdenum-technicium Generators Occurred.Caused by Car Crossing Median.Generators Undamaged.Shipment Continued + (15:12:06, 11 December 2024)
- 05000346/LER-1988-001, :on 880106,seismic Trigger Installed in June 1977 Determined Not to Meet Tech Spec Frequency Range Response.Cause Due to Original Trigger Being Replaced When Surveillance Test Failed + (15:12:08, 11 December 2024)
- ML20149D517 + (15:12:10, 11 December 2024)
- ML20149D514 + (15:12:11, 11 December 2024)
- ML20149D515 + (15:12:11, 11 December 2024)
- ML20149D513 + (15:12:12, 11 December 2024)
- ML20149D511 + (15:12:13, 11 December 2024)