ML20149D547

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted
ML20149D547
Person / Time
Site: Pilgrim
Issue date: 09/09/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20149D552 List:
References
IEB-93-003, IEB-93-3, NUDOCS 9309210069
Download: ML20149D547 (3)


See also: IR 05000293/1993014

Text

_.

.

_

.

le '

}

g

gg

,

1

,

i

Docket No. 50-293

t

Mr. E. Thomas Boulette, PhD

Senior Vice President - Nuclear

Boston Edison Company

Pilgrim Nuclear Power Station

Rocky Hill Road

Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUBJECT: PILGRIM INSPECTION 93-14

This refers to the safety inspection conducted by Messrs. J. Macdonald, A. Cerne, and D. Kern,

of this ofGce on July 13 - August 16, 1993 at the Pilgrim Nuclear Power Station, Plymouth,

Massachusetts. Areas relevant to. the health and safety of the public examined during this

inspection are described in the enclosed report. Our findings were based upon observations of

'

performance and independent evaluations of safety systems and quality records. The preliminary

results have been discussed with Mr E. Kraft and other members of your staff at the conclusion

of the inspection.

Overall, safe plant operations and good attention to detail were observed by our inspectors.

Conservative operational actions were established for the gradually increasing rate of unidentified

drywell leakage, and the resultant plant shutdown was well controlled. Weld repair of the

reactor drain piping was thoroughly planned and safely executed. Hardware modifications to

improve the reliability of reactor vessel level indication were consistent with' the actions

-i

requested in NRC Bulletin 93-03, with good post-installation testing.

.

-

No reply to this report is necessary, and your cooperation with us is appreciated.

,

Sincerely,

ORIGINAL. $1GNED BY!

&cw /feHy'

!

James Linville, Chief

{

Projects Branch No. 3

Division of Reactor Projects

i

!

Enclosure: NRC Inspection Report No. 93-14

!

9309210069 930909

PDR

ADOCK 05000293

,

G

PDR

OFFICIAL RECORD COPY

Il

.'

d

,i

,

'

SEP

9 1993

-

.

Mr. E. Thomas Boulette, PhD

2

cc w/ encl:

E. Kraft, Vice President, Nuclear Operations and Station Director

L. Schmeling, Plant Manager

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department

D. Tarantino, Nuclear Information Manager

N. Desmond, Compliance Division Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

The Honorable Edward M. Kennedy

The Honorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Terese Murray

The Honorable P. 'ar V. Forman

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectrnen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of Energy Resources

Sarah Woodhouse, Legislative Assistant

A. Nogee, MASSPIRG

Regional Administrator, FEMA

Of5cc of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executive Of6ce of Public Safety

Chairman, Citizens Urging Responsible Energy

Public Document Room (PDR)

'

Ixcal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

]

Commonwealth of Massachusetts, SLO Designee

i

!

!

OFFICLAL RECORD COPY

i

.-

.

.

.

Mr. E. Thomas Boulette, PhD

3

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E-MAIL):

W. Butler, NRR

R. Eaton, NRR

V. McCree, OEDO

T. Collins, NRR (Section 4.1)

W. Ruland, DRS (Section 4.1)

+g8

'

L W"

p

sW

b

RI:DRP

RI:DRP

RI- RP

hY

^

111 Li rille

Macdonald/meo

Kel ,

-

9/9/93-

G[

9f

OFFICIAL RECORD COPY

A:vY9314.MEO

2